I-94 Maple Grove to Clearwater

Maple Grove, Dayton, St. Michael, Albertville, Monticello, Hasty, Clearwater

Traffic impacts

All traffic impacts are tentative and weather dependent.

I-94 Maple Grove to Clearwater project location map
I-94 Maple Grove to Clearwater project location map.
Click map for larger version
.

Current

Motorists are advised to follow posted speed limits; fines are up to $300 in work zones. Reduced speed limits on EB I-94 in Albertville are in effect through the winter.

Road closures

Maple Grove to Rogers
Through November 2021
  • The four-way intersection at Territorial Rd. and Fletcher Ln. is reduced to a three-way intersection with a temporary signal. Access to NB Fletcher Ln. from the intersection is closed.

Lane closures

Maple Grove to Rogers
Tue, Jan. 26 from 10 a.m. to 4 p.m.
  • EB I-94 is reduced to a single lane between the start of the exit to Hwy 101 and the Hwy 101 bridge over I-94
Wed, Jan. 20 through Fri, Feb. 19; 9 a.m. to 4 p.m. daily
  • EB I-94 is reduced to two lanes between Hwy 101 and Weaver Lake Rd.
    • Note: This closure is in place Monday through Friday only

Upcoming

Information about upcoming traffic impacts will be provided as details become available.

About this project

I-94 between Maple Grove and Clearwater is undergoing three years of improvements and upgrades along a 39-mile stretch of road. We are adding travel lanes, rebuilding bridges, constructing access lanes, improving drainage, adding an interchange, and resurfacing deteriorating pavement. When complete, motorists will experience improved safety, a smoother road surface, better commercial access for freight and business, and less vehicle congestion.

Summary of work

Reconstruct roads

  • 9 miles between Maple Grove and Rogers (2020-2021)
  • 6 miles between St. Michael and Albertville (2019-2021)
  • 15 miles between Monticello and Clearwater (2019-2021)

Add lanes

  • Add a lane on I-94 in both directions between Hwy 610 in Maple Grove and Hwy 101 in Rogers (total of four each way)
  • Add a lane on WB I-94 between Hwy 241 in St. Michael and Wright Co. Rd. 37 in Albertville and add a lane on EB I-94 between Hwy 241 in St. Michael and Wright Co. Rd. 19 in Albertville (total of three each way)
  • Add a lane on I-94 in both directions between Hwy 25 in Monticello and Hwy 24 in Clearwater (total of three each way)

Build interchanges and construct bridges

  • Build a diverging diamond interchange, trails and sidewalks southeast of Brockton Ln. in Dayton
  • Replace Hwy 241 bridge over I-94 in St. Michael and improve access
    • Construct roundabout at Hwy 241 and O’Day Ave. in St. Michael
  • Replace I-94 bridges over Co. Rd. 19 in Albertville and improve access

Add freight improvements

  • Add 10 parking spaces in Elm Creek Rest Area
  • Install digital signage system with real-time availability of Elm Creek Rest Area spaces
  • Improve the parking lot and sidewalks at the Enfield Rest Area
  • Improve and increase lanes for smoother merging and exiting

Additional local improvements