Projects funded |
Grant Recipient |
Federal Program |
Project Name |
Type of Project |
General Status |
Federal Funds Awarded |
Total Project Costs |
State Amount Requested |
State Amount Provided |
MnDOT District |
Transportation Mode |
Columbia Heights City |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
Complete a citywide safety action plan to address safety, accessibility, and equity concerns throughout the City. |
Not Started |
$200,000 |
$240,000 |
$48,000 |
$48,000 |
Metro |
Local roadway |
Excelsior City |
Bridge Investment Program - Planning |
Minnetonka Blvd. Bridge (St. Albans Bay Bridge) |
Conduct a planning and feasibility study to explore the replacement of the existing St. Albans Bay Bridge, located on the border of Excelsior, MN and Greenwood, MN. |
Not Started |
$269,600 |
$337,000 |
$67,400 |
$67,400 |
Metro |
Roads, Bridges and Major Projects |
Hennepin County |
National Infrastructure Investments - RAISE |
Lake Street Improvements to Enhance BRT |
Repaving bus only lanes, turn lanes, pavement markings, ADA upgrades and traffic signal modifications. |
Not Started |
$12,000,000 |
$15,000,000 |
$3,000,000 |
$3,000,000 |
Metro |
Local roadway |
Carver County |
Nationally Significant Multimodal Freight/Highway (INFRA) |
US 212 Freight Mobility & Safety Project |
Road work expanding approximately 5 miles. |
Not Started |
$10,000,000 |
$59,450,000 |
$10,000,000 |
$10,000,000 |
Metro |
State highway |
St. Louis Park City |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
Identify strategies and programs to improve safety and prevent roadway fatalities and serious injuries. |
Not Started |
$160,000 |
$200,000 |
$40,000 |
$40,000 |
Metro |
Local roadway |
Duluth City |
National Infrastructure Investments - RAISE |
West Superior Street Active Corridor |
The project will be a complete reconstruction of West Superior St from Michigan St to Carlton St. |
Not Started |
$24,999,160 |
$38,422,650 |
$7,684,530 |
$7,684,530 |
1 |
Local roadway |
Duluth City |
National Infrastructure Investments - RAISE |
Coastal Transportation Infrastructure Rehab |
Protect and improve a separated multi-modal transportation trail, increase connections to that trail, and mitigate the coastal barrier adjacent to the trail. |
Not Started |
$81,196,234 |
$10,248,758 |
$2,049,752 |
$2,049,752 |
1 |
Transit |
MN Dept of IRRR |
Advanced Transportation Technology & Innovation (ATTAIN) |
MN Autonomous Rural Transit Initiative (MARTI) |
An on-demand micro-transit autonomous and electric vehicle project in rural NE MN providing public accessibility focused transportation options for rural communities in winter climate settings. |
Not Started |
$9,302,812 |
$11,628,515 |
$2,325,703 |
$2,325,703 |
1 |
Transit |
Metro Transit |
Low/No Emission Vehicle Program |
EV Buses and Charging Equipment |
Deploy four battery-electric buses and six smaller cutaway-type battery-electric vehicles. |
Not Started |
$8,127,891 |
$9,563,072 |
$1,434,461 |
$1,434,461 |
Metro |
Transit |
Metropolitan Council |
Low/No Emission Vehicle Program |
Battery-Electric Buses, Chargers, Equipment |
Deploy 12 battery-electric buses and depot chargers. |
Not Started |
$17,532,900 |
$20,435,000 |
$3,065,250 |
$3,065,250 |
Metro |
Electric vehicle infrastructure |
Plymouth City |
National Infrastructure Investments - RAISE |
Station 73 Transit and Regional Improvement |
Improve transportation with a new pedestrian underpass under TH 55, inline stations at Station 73, realigning CSAH 73 south of HWY 55 and new regional trail. |
Not Started |
$15,000,000 |
$25,388,000 |
$5,077,600 |
$5,077,600 |
Metro |
Local roadway |
Rochester City |
National Infrastructure Investments - RAISE |
6th Street Bridge Construction Project |
Construction of multi-modal bridge, improve trail connections, and roadway improvements. |
Not Started |
$19,900,000 |
$29,900,000 |
$5,980,000 |
$5,980,000 |
6 |
Local bridge |
Dakota County |
National Infrastructure Investments - RAISE |
Completing the Mississippi River Greenway |
Pedestrian focused project to close trail gaps, improve crossing, enhance user experience. |
Not Started |
$8,800,000 |
$12,200,000 |
$2,440,000 |
$2,440,000 |
Metro |
Bicycle/pedestrian |
Glencoe City |
Airport Terminal Program |
Glencoe Municipal Airport |
Construction of a new arrival/departure (A/D) building at the Glencoe Municipal Airport to replace the current facility to provide become ADA compliant and improve airport functionality. |
Not Started |
$712,500 |
$750,000 |
$37,500 |
$37,500 |
8 |
Air |
Eagan City |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
Development of a comprehensive city-wide Safety Action Plan. |
Not Started |
$80,000 |
$100,000 |
$20,000 |
$20,000 |
Metro |
Local roadway |
Prairie Island Indian Community |
Low or No Emission Vehicle Program |
Net Zero Vehicle Electrification |
The project will acquire electric vehicles to replace Tribal Government-owned, petroleum-fueled shuttles and passenger vans. |
Not Started |
$1,616,426 |
$1,912,426 |
$286,864 |
$286,864 |
6 |
Electric vehicle infrastructure |
Duluth City |
Airport Terminal Program |
Sky Harbor Airport |
Construct new 1,200 SF Terminal Building, that is ADA-compliant and energy efficient. |
Not Started |
$1,187,000 |
$1,249,474 |
$62,474 |
$62,474 |
1 |
Air |
Fillmore County |
Airport Terminal Program |
Fillmore County Airport |
Reconstruction of the 1,800 SF Terminal Building at Sky Harbor Airport. |
Not Started |
$950,000 |
$1,086,976 |
$54,349 |
$54,349 |
6 |
Air |
Monticello City |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
Identify roadway improvements that can be made to increase safety with the goal of eliminating serious injury and fatality accidents from occurring in the City. |
Not Started |
$200,000 |
$240,000 |
$48,000 |
$48,000 |
3 |
Local roadway |
White Earth Nation |
Bus and Bus Facilities Program |
White Earth Public Transit Facility |
White Earth Public Transit is constructing a Multi-Purpose Bus Facility located in Waubun Mn. This will house administration staff, washbay, maintenance, and bus storage. |
Not Started |
$3,607,642 |
$4,494,867 |
$898,973 |
$898,973 |
Metro |
Transit |
Bois Forte Band of Chippewa |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
The project will develop a holistic, well-defined strategy to prevent roadway fatalities and serious injuries within the Band's jurisdiction. |
Not Started |
$221,821 |
$279,296 |
$55,859 |
$55,859 |
1 |
Local roadway |
Woodbury City |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
The program supports the development of a comprehensive safety action plan (Action Plan) that identifies the most significant roadway safety concerns in a community and the implementation of projects. |
Not Started |
$300,000 |
$375,000 |
$75,000 |
$75,000 |
Metro |
Local roadway |
Twin Cities & Western Railroad Co |
Consolidated Rail Infrastructure and Safety Improvements (CRISI) |
TC&W Rail Infrastructure and Safety Improvement |
This project will convert 12.2 miles of TC&W mainline track to continuous welded rail (CWR) by performing "joint elimination" via flash-butt welding. Making for a stronger and safer infrastructure. |
Project awarded by the State. TCWR returned funds as not planning to move forward with the project. |
$2,103,000 |
$4,206,000 |
$841,200 |
$841,200 |
8 |
Freight |
Little Falls City |
Railroad Crossing Elimination Program |
TH27 Mississippi River Bridge Grade |
Provide Planning, NEPA, and design services for the Trunk Highway 27 Bridge over the Mississippi River and BNSF railroad crossing. |
Not Started |
$3,200,000 |
$4,000,000 |
$800,000 |
$800,000 |
3 |
State bridge |
Bois Forte Band of Chippewa |
Low/No Emission Vehicle Program |
Propane-Fueled Big Woods Transit Fleet |
The project will develop a holistic, well‐defined strategy to prevent roadway fatalities and serious injuries within the Bands jurisdiction. |
Not Started |
$739,500 |
$876,000 |
$175,200 |
$175,200 |
1 |
Electric Car |
Fridley City |
Safe Streets and Roads for All (SS4A) |
Fridley Streets for All |
This project will develop a multi-modal safety action plan for the City of Fridley under the SS4A program. The plan will provide an implementable path toward achieving zero deaths goal. |
Not Started |
$220,000 |
$275,000 |
$55,000 |
$55,000 |
Metro |
Local roadway |
Hennepin County |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
Hennepin County is developing a TZD Action Plan, which is aimed at reducing fatalities and serious injuries on our system. |
Not Started |
$240,000 |
$300,000 |
$60,000 |
$60,000 |
Metro |
Local roadway |
Buffalo City |
Safe Streets and Roads for All (SS4A) |
City Wide Safety Action Plan |
The completion of a safety plan will allow the City to identify deficiencies in transportation network and prioritize improvements that increase safety of pedestrians, bicyclists, motorists. |
Not Started |
$192,000 |
$240,000 |
$48,000 |
$48,000 |
3 |
Local roadway |
Rochester-Olmsted Council of Gov'ts |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
The project will complete a Comprehensive Safety Action Plan meeting the requirements of the Safe Streets for All (SS4A) program covering all local jurisdictions in Olmsted County. |
Not Started |
$2,768,000 |
$346,000 |
$69,200 |
$69,200 |
6 |
Local roadway |
MnDOT |
Advanced Digital Construction Management Systems (ADCMS) |
Minnesota Nice Connects the DOTs through the Construction Cycle |
Updated asset and digital data management systems across the state's construction cycle and the goal of improving decision-making, managing risks and employing mitigation strategies. |
Not Started |
$2,160,000 |
$3,000,000 |
$600,000 |
$600,000 |
Metro |
State highway |
MnDOT |
Low/No Emission Vehicle Program |
Low or No Emission Rural Vehicles |
Replace six conventional buses with battery electric buses, charging equipment & related infrastructure to be utilized by four rural public transit systems. |
Not Started |
$3,414,680 |
$3,931,092 |
$589,664 |
$589,664 |
Metro |
Transit |
Rochester City |
Bus and Bus Facilities Program |
Park and Ride Lot |
Installation of a 200 stall park-and-ride facility to support transit use in the community. |
Not Started |
$7,440,000 |
$9,300,000 |
$1,860,000 |
$1,860,000 |
6 |
Transit |
Kandiyohi County |
Railroad Crossing Elimination Program |
CSAH 55 Rail Grande Crossing Elimination |
The project constructs an overpass on CSAH 55 that will span the BNSF rail line (two tracks) and reconstruct one mile of rural two-lane highway on CSAH 55. |
Not Started |
$4,824,563 |
$9,649,127 |
$1,929,825 |
$1,929,825 |
8 |
Local roadway |
Edina City |
Safe Streets and Roads for All (SS4A) |
Safe & Equitable Mobility Action Plan |
Edina's new mobility action plan and will combine various transportation plans into a comprehensive plan. |
Not Started |
$200,000 |
$250,000 |
$50,000 |
$50,000 |
Metro |
Bicycle/pedestrian |
MnDOT |
National Infrastructure Investments - RAISE |
TH 197 Bemidji |
Reconstruction of Hwy 197, Middle School Drive, Hannah Avenue and Gillette Drive. |
Not Started |
$18,000,000 |
$26,000,000 |
$5,200,000 |
$5,200,000 |
Metro |
Roads, Bridges and Major Projects |
Minneapolis City |
Safe Streets and Roads for All (SS4A) |
Minneapolis Systematic Street Safety Improvements |
Minneapolis was awarded a Safe Streets for All grant for safety treatments focused on high injury streets. |
Not Started |
$20,004,000 |
$25,240,000 |
$5,048,000 |
$5,048,000 |
Metro |
Local roadway |
Sherburne County |
INFRA |
US 169 Rural Safety and Mobility Interchange Project |
Reconstruction of approx 1 mile of US169 and approx 1/2 mile of CSAH 4. |
Not Started |
$24,732,000 |
$47,100,000 |
$9,420,000 |
$9,420,000 |
7 |
State highway |
St Paul City |
Reconnecting Communities Pilot Program |
Reconnect Rondo |
Restore and reconnect the Community Land Bridge in the Rondo neighborhood. |
Not Started |
$2,000,000 |
$2,500,000 |
$500,000 |
$500,000 |
Metro |
Roads, Bridges and Major Projects |
Elk River City |
Comprehensive Safety Action Plan
|
Comprehensive Safety Action Plan |
Identify and prioritize risk levels to include spatial data, livelihood security, occupational activities, miromobility, personal conveyance and safe system approach to address the highest risks. |
Not Started |
$198,480 |
$248,100 |
$49,620 |
$49,620 |
Metro |
Bicycle/pedestrian |
Metropolitan Airports Commission |
Airport Terminal Program |
Minneapolis - St Paul International Airport |
This award funds the expansion of Terminal 2 to include two new gates and related infrastructure at the north end of the terminal. |
Not Started |
$20,000,000 |
$237,000,000 |
$10,000,000 |
$10,000,000 |
Metro |
Air |
MnDOT - District 8 |
Rebuilding American Infrastructure with Sustainability and Equity (RAISE) |
MN Hwy 19 Reconstruction Project |
Reconstruction of Hwy 19 from Marlene St to Bruce St. |
Not Started |
$18,625,713 |
$29,086,934 |
$5,817,387 |
$5,817,387 |
8 |
State highway |
MnDOT district 1 |
National Infrastructure Project Assistance Program (INFRA) |
SP 6981-26 Blatnik Bridge Replacement |
Replacement of the Blatnik Bridge (I-535) over the St. Louis River between Duluth and Superior and new interchange in Superior. |
Not Started |
$497,447,154 |
$1,763,997,000 |
$10,000,000 |
$10,000,000 |
1 |
State bridge |
Red Wing City |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
Planning activities to develop, approve, and adopt an actionable transportation related Comprehensive Safety Action Plan. |
Not Started |
$195,760 |
$244,700 |
$48,940 |
$48,940 |
6 |
Local roadway |
Duluth City |
Airport Terminal Program |
ATP Reconstruct Air Traffic Tower |
Relocation of a non-standard, airport owned ATCT. The project includes design, project formulation, site preparation, line of sight obstruction removal, and other related actions. |
Not Started |
$10,000,000 |
$66,000,000 |
$3,300,000 |
$3,300,000 |
1 |
Air |
MnDOT - District 3 |
Rural Surface Transportation Grant Program |
TH 210 Brainerd (Rural) |
Reconstruction and rehabilitation of a four mile segment of MN Hwy 210 from Baxter Dr to Pine Shores Rd. |
Not Started |
$25,000,000 |
$55,900,000 |
$10,000,000 |
$10,000,000 |
3A |
State highway |
SouthWest Transit |
Low/No Emission Vehicle Program |
Low or No Emission Battery-Electric Buses |
Development of battery-electric buses fro SouthWest Transit (SWT) including; four replacement 45-foot coach battery-electric buses and six replacement 25-foot battery-ev. |
Not Started |
$8,127,891 |
$9,563,072 |
$1,912,614 |
$1,912,614 |
Metro |
Electric Car |
MnDOT - District 2 |
Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation Program (PROTECT) |
Highway 11 Rainy River Slide Realignment and Resiliency Project |
Realign 1.2 miles of State Hwy 11 to remove the roadway from the land slide areas along the Rainy River. |
Not Started |
$2,560,000 |
$4,520,000 |
$904,000 |
$904,000 |
2 |
State Highway |
Duluth City |
Reconnecting Communities Pilot Program |
Duluth I-35: Community Access Revitalization Study |
The City of Duluth, MN in partnership with the MN Dept of Transportation and the Duluth-Superior Metropolitan Interstate Council, will develop a transportation plan for I-35. |
Not Started |
$1,800,000 |
$2,250,000 |
$450,000 |
$450,000 |
1 |
State Highway |
St. Louis County |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
Develop a safety action plan for all roads in St. Louis County. |
Not Started |
$200,000 |
$250,000 |
$50,000 |
$50,000 |
Metro |
Local Roadway |
MnDOT - District 4 |
Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation Program (PROTECT) |
West Central Minnesota I-94 Blowing and Drifting Snow Control Project |
38 snow fence sites along I-94 from Moorhead to Alexandria. |
Not Started |
$13,736,000 |
$17,170,000 |
$3,434,000 |
$3,434,000 |
4 |
State Highway |
White Earth Nation Business Community |
Low/No Emission Vehicle Program |
Low-or No- Emission Buses w/Electronic Farebox |
Low-no grant to purchase and replace 4 buses and 2 electric fareboxes. |
Not Started |
$723,171 |
$903,966 |
$180,793 |
$180,793 |
Metro |
Electric Car |
Arrowhead Regional Development Commission (ARDC) |
Safe Streets and Roads for All (SS4A) |
Safety Action Plan |
Duluth, Hermantown, Proctor and Rice Lake and the townships cities of Duluth, Hermantown, Proctor and Rice Lake and the townships of Canosia, Duluth, Grand Lake, Lakewood, Midway and Solway in MN; and the City of Superior, the towns of Lakeside, Parkland and Superior and the villages of Oliver and Superior in WI. |
Not Started |
$250,000 |
$312,500 |
$62,500 |
$62,500 |
1 |
Local Roadway |
St. Cloud APO |
Safe Streets and Roads for All (SS4A) |
Addressing Traffic Safety Issues |
Project is the development of a Comprehensive Safety Action Plan for the Saint Cloud, MN urban area to be used in the future to apply for implementation funds. |
Not Started |
$120,000 |
$150,000 |
$30,000 |
$30,000 |
3 |
Local Roadway |
MN Valley Regional Rail Authority |
Consolidated Rail Infrastructure and Safety Improvements (CRISI) |
MVRRA Track Rehab Evaluation |
To preform the preliminary engineering and environmental work for future track reconstruction from Franklin, MN to Hanley Falls, MN. |
Not Started |
$520,000 |
$650,000 |
$130,000 |
$130,000 |
Metro |
Freight |
Beltrami County |
Safe Streets and Roads for All (SS4A) |
Safety Action Plan |
Supplemental planning to enhance Beltrami County's Action Plan. |
Not Started |
$200,000 |
$250,000 |
$50,000 |
$50,000 |
2B |
Local roadway |
St. Louis County |
Rebuilding America Infrastructure (RAISE) |
Rice Lake Rd (CSAH 4) Corridor Project |
Create a multi-modal corridor through the reconstruction of Rice Lake Rd (CSAH 4) and Martin Rd (CSAH 9), and construction of a new city street and multi-use paths. |
Not Started |
$25,000,000 |
$44,730,000 |
$8,946,000 |
$8,946,000 |
Metro |
Local roadway |
Willmar City |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
The City of Willmar has been awarded IIJA funding to complete a SS4A Action Plan. The final document will provide the city with a multi-year actionable transportation safety plan. |
Not Started |
$200,000 |
$240,000 |
$40,000 |
$40,000 |
8 |
Local roadway |
MnDOT - District 7 |
Rebuilding America Infrastructure (RAISE) |
Hwy 59 Worthington Streets Project |
Reconstruction of Hwy 59 from approximately I-90 to Hwy 60 in the City of Worthington, MN. Major project items include grading, concrete pavement, roundabouts, utilities, and signals. |
Not Started |
$15,140,000 |
$26,340,000 |
$5,268,000 |
$5,268,000 |
7 |
State Highway |
Cottage Grove City+A65:M75 |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
Planning dollars for development of a city wide Safety Action Plan. |
Not Started |
$352,000 |
$440,000 |
$88,000 |
$88,000 |
Metro |
Local roadway |
St Paul City |
Safe Streets and Roads for All (SS4A) |
Safe and Equitable Streets: Systemic Improvements for Saint Paul & Ramsey County Roads |
Installation of systemic transportation safety counter measures on local and county streets, with a focus on the high injury network and historically underserved communities. |
Not Started |
$15,725,600 |
$19,657,000 |
$3,931,400 |
$3,931,400 |
Metro |
Local roadway |
Brooklyn Park City |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
Develop comprehensive Safety Action Plan and conduct demonstration activities for travel within the City of Brooklyn Park. |
Not Started |
$360,000 |
$450,000 |
$90,000 |
$90,000 |
Metro |
Local roadway |
Shakopee City |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
Develop comprehensive Safety Action Plan and two supplemental activities (Corridor Safety Analysis; Control Policy update) to improve safety and enhance the Action Plan. |
Not Started |
$320,000 |
$400,000 |
$80,000 |
$80,000 |
Metro |
Local roadway |
Bloomington City |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
Develop comprehensive safety action plan, conduct two demonstration activities, and update the comprehensive safety action plan, conduct two demonstration activities, and update the comprehensive safe routes to school plan. |
Not Started |
$412,000 |
$515,000 |
$103,000 |
$103,000 |
Metro |
Local roadway |
West St Paul City |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
Develop a new Comprehensive Safety Action Plan for West St. Paul. From this plan the city can apply for Implementation Grants through SS4A. |
Not Started |
$200,000 |
$250,000 |
$50,000 |
$50,000 |
Metro |
Local roadway |
New Brighton City |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
The City of New Brighton will create a Comprehensive Safety Action Plan to supplement the 2024 Living Streets Plan and implement additional safety measures. |
Not Started |
$160,000 |
$200,000 |
$40,000 |
$40,000 |
Metro |
Local roadway |
Fond du Lac Band of Lake Superior Chippewa |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
The Fond du Lac Band is requesting funding through the FY 2024 Safe Streets and Roads for All Planning grant program for the development of a SS4A Comprehensive Safety Action Plan. |
Not Started |
$138,240 |
$172,800 |
$34,560 |
$34,560 |
1 |
Local roadway |
MnDOT - OTAT |
Low/No Emission Vehicle Program |
Low or No Emission Rural Vehicles and Supporting Fuel Equipment |
Purchase seven (7) <30 ft. propane fueled low emission propane fueled buses and to purchase and install a propane bulk tank and storage dispenser at an existing transit facility. |
Not Started |
$1,456,970 |
$1,714,083 |
$257,112 |
$257,112 |
|
Transit |
Cottage Grove City+A65:M76 |
Safe Streets and Roads for All (SS4A) |
Comprehensive Safety Action Plan |
Planning dollars for development of a city wide Safety Action Plan. |
Not Started |
($1,446,871) |
($1,856,202) |
($409,331) |
($409,331) |
Metro |
Air |
St Paul City |
Safe Streets and Roads for All (SS4A) |
Safe and Equitable Streets: Systemic Improvements for Saint Paul & Ramsey County Roads |
Installation of systemic transportation safety counter measures on local and county streets, with a focus on the high injury network and historically underserved communities. |
Not Started |
($2,161,241) |
($2,756,306) |
($595,066) |
($595,066) |
Metro |
Local roadway |
|
|
|
|
|
$961,671,396 |
$2,659,706,900 |
$136,341,333 |
$136,341,333 |
|
|