Materials and Road Research | Geotechnical Engineering | Foundations
Foundations Scoping
When you should coordinate with us for scoping purposes
If your project has any one of the following listed below, please contact Rich Lamb (rich.lamb@state.mn.us or 651-334-3563) for more information.
- Bridges
 - New Bridge
 - Bridge Replacement
 - Temporary Bridges
 - Bridge Rehab and Historic Bridges
 - If you anticipate foundations work / involvement
 - Box Culverts
 - All box culverts with current or future bridge numbers
 - Box culvert extensions
 - Any culvert installed in a very deep trench
 - Any culvert installed in poor soils
 - Retaining Walls and Reinforced Slopes
 - Standard Concrete Cantilever Walls
 - Noise Walls
 - Modular Block Walls (>4 ft. in height)
 - Mechanically Stabilized Earth (MSE) Walls
 - Sheet Pile Walls
 - Visual Barriers
 - Soil Nail Walls
 - Soldier Pile Walls
 - Reinforced Soil Slopes (RSS) (1:1)
 - High Tension Cable Barrier (HTCB)
 - Overhead Sign Structures
 - High Mast Light Towers
 - Signal Systems with long (>45 ft.) mast arms
 - Embankments/roadways over poor soils
          
- Coordination with District soils engineer to help identify areas with known poor soils or poor geologic conditions
 
 - Pavement or Slope Distress
 - Slope Failures
 - Landslides
 - Sloughing
 - Roadway Distress
 - Bumps/dips in roadway
 - Anything else that you anticipate needing foundations work / involvement
 