Highway 21 and Highway 282

Jordan/Sand Creek Township

Traffic impacts

Hwy 21 in Jordan project location map
Hwy 21 and Hwy 282 in Jordan project location map.
Click map for larger version
.

All traffic impacts are tentative and weather dependent. All businesses and residences will remain accessible throughout the project.

Upcoming

Information about upcoming traffic impacts will be provided as details become available.

About this project

Hwy 282

Hwy 282 will be reconstructed for a smoother ride between Mill St. and Hwy 13. Additionally, Hwy 282 will be reconstructed between Lydia Rd. and East St. to add a trail, improve safety and slow traffic.

Summary of work

  • Reconstruct and repave road between Mill St. and Hwy 13
  • Reconstruct the hill between Lydia Rd. and East St.
  • Add a trail for pedestrians and bicyclists between Lydia Rd. and East St.
  • ADA compliant sidewalk to ensure accessible route between Mill St. and East St.
  • Reduce shoulder width

Hwy 21

The Hwy 21 bridges over the UP Railroad constructed in 1957 and over Sand Creek were in need of replacement, which brought both bridges up to current standards.

Completed

2020
  • Replaced UP Railroad and Sand Creek Bridges
  • Reconstructed road between Mill St. and south of Sand Creek Bridge
  • Added trail for pedestrians and bicyclists
  • Repaired erosion and drainage
  • Reduced shoulder width