I-94

Minneapolis

This webpage is not updated over the weekend/overnight. For up-to-date information on traffic impacts, visit 511mn.org.

Traffic impacts

I-94 between East River Pkwy./Franklin Ave. and just west of Hwy 55/Hiawatha Avenue/I-35W project area map.

I-94 in Minneapolis project area map

View full-size map

All traffic impacts are tentative and weather dependent.

Upcoming

Information about upcoming traffic impacts will be posted as details become available. Motorists can expect lane and ramp closures during construction. Motorists should be aware that some nearby construction projects will have overlapping traffic impacts with the I-94 Minneapolis work. All lanes on I-94 between 11th Ave. South and Franklin Ave. Southeast are open to traffic for the Minnesota State Fair from through Labor Day. Work will resume after Labor Day to complete the removal of crossovers and other items such as signage and lighting.

Lane closures

12:01 a.m. Tue, Sept. 2 through 11:59 p.m. Fri, Sept. 26 
  • I-94 is reduced to two lanes in both directions betweeen 11th Ave. South and Franklin Ave. Southeast

Ramp closures

12:01 a.m. Tue, Sept. 2 through 11:59 p.m. Fri, Sept. 26

About this project

We will be doing maintenance and repair work on five bridges along I-94 in Minneapolis. These bridges include:

  • I-94 bridge (Dartmouth Bridge) that spans the Mississippi River
  • Riverside Ave. bridge over I-94
  • I-94 over Cedar Ave.
  • I-94 over the Light Rail Transit (Blue Line)
  • I-94 over Hwy 55/Hiawatha Ave.

Summary of work

  • Construct temporary crossovers
  • Repair bridge decks
  • Resurface bridge pavement
  • Remove and replace bridge joints
  • Update guardrails
  • Upgrade drainage
  • Repaint bridge steel