Current Construction

Projects on Minnesota highways

Updated Feb. 21, 2019

Know your region? Make this list a little shorter by selecting a region below or from the map.









that have a significant impact on commercial truck traffic.
District Offices MnDOT District 7 - Mankato/Windom Metro District - St Paul/Minneapolis MnDOT District 8 - Marshall/Wilmar/Hutchinson MnDOT District 1 - Duluth/Virginia MnDOT District 4 - Detroit Lakes/Morris MnDOT District 2 - Bemidji/Crookston MnDOT District 3 - Baxter/St Cloud MnDOT District 6 - Rochester/Owatonna

Select a project by highway

Select a project by name

Hwys 1–9

Hwy 2

Hwy 2 – Erskine to Hwy 59

Description: Concrete resurface; Hwy 59 overpass bridge repair

Construction dates: May 14 to late 2018 or summer 2019

Traffic impacts: Single lane, head to head traffic

More information: mndot.gov/d2/projects/2018/hwy2-erskine

Hwy 2 — Kennedy Bridge, East Grand Forks

Description: Replace bridge deck

Construction dates: Spring 2017 through fall 2018

Traffic impacts: Lane closures, detours

More information: mndot.gov/d2/projects/kennedybridge

Hwy 4

Hwy 4 — St. James

Description: Reconstruct 1.6 miles of roadway, upgrade city utility infrastructure, enhance pedestrian accommodations

Construction dates: 2017-2018
Traffic impacts: No current traffic impacts

More information: mndot.gov/d7/projects/hwy4stjames

Hwy 4 — Sauk Centre to Paynesville

Description: Reconstruct the road surface and replace pipes on 21 miles of Hwy 4 between I-94 near Sauk Centre and Hwy 55 west of Paynesville in Stearns and Kandiyohi counties. Project excludes Lake Henry and Meire Grove.
Construction dates: July-October 2019
Traffic impacts: Detour

More information: mndot.gov/d3/projects/2019/h4/

Hwy 5

Hwy 5 — Waconia

Description: Intersection Improvement at Orchard Road in two phases. Phase One (complete: July 2017 to early October): Road closure of Hwy 5 at Orchard Rd. Phase 2 (begins Spring 2018): Traffic impacts to county roads only.

Construction dates: July 2017 through mid-November 2018

Traffic impacts: Road closure and detour

More information: clients.bolton-menk.com/carvercountycsah10

Hwy 6

Hwy 6 — Emily, Outing

Description: Resurface and improve Hwy 6 south of Emily to Moritz Rd. near Perry Lake and north of Emily to Outing, includes sidewalks in Outing.
Construction dates: July-September 2019
Traffic impacts: Lane closures, flaggers with pilot car

More information: mndot.gov/d3/projects/2019/h6/

Hwy 6 — Northern Itasca and Koochiching Counties

Description: Resurfacing project
Status: Construction begins in May 2019
Contact: Kevin Bissonette
More information: mndot.gov/d1/projects/hwy-6-resurfacing

Hwy 6 — Crosby

Description: Install a pedestrian Cuyuna Lakes State Trail underpass tunnel in Crosby, Crow Wing County. 
Construction dates: July-August 2019
Traffic impacts: Detour

More information: mndot.gov/d3/crosby-ironton/trail/

Hwy 7

Hwy 7 — Hopkins, Minnetonka and St. Louis Park

Description: Resurfacing improvement project

Construction dates: Spring through June 2019
Traffic impacts: Lane and road closures with detours

More information: mndot.gov/metro/projects/hwy7minnetonkaslp

Sign up for Hwy 7 Minnetonka and St. Louis Park project email updates

Hwys 10–19

Hwy 10

Hwy 10 — Denmark Township to Prescott, WI

Description: Repair Hwy 10 Bridge over St. Croix River (WisDOT is the lead for the project)

Construction dates: September 2018 through mid-June 2019

Traffic impacts: Temporary lane closures

Contact: Kent Barnard

More information: projects.511wi.gov/us10-lift-bridge/

Hwy 10 — Arden Hills

Description: Construct a third lane on eastbound Hwy 10 between I-35W and Co Rd 96

Status: Construction begins spring 2019

Contact: Kent Barnard

More information: mndot.gov/metro/projects/hwy10ardenhills

Sign up for Hwy 10 Arden Hills project email alerts

Hwy 10 Detroit Lakes

Description:Reduced Conflict Intersection (RCI) conversion, signal and intersection improvements, including crosswalks and future trail development accommodations

Status: 2020 construction season; 2019 construction on Randolph Road (city led)

Contact: Tom Lundberg, project manager, 218-846-3634

More information: www.mndot.gov/d4/projects/easthwy10/

Hwy 10 Bluffton to Wadena

Description: Reconstruct Hwy 10 from Birch Ave to east of CR 4 in the city of Wadena, includes sidewalks, accesses and utilities. Also, resurface the two-lane segment east and west of town in Otter Tail and Wadena counties.

Traffic Impacts: Lane closures, flaggers, staged detours
Construction dates: May 2019 - October 2020

More information: www.mndot.gov/d3/wadena/

Hwy 11

Hwy 11 — Koochiching County bridge replacement project

Description: Replace bridge

Construction dates: May 15 to mid-November 2018, and Aug. 12 to Oct. 4, 2019

Traffic impacts: Single lane, controlled by signals

More information: mndot.gov/d1/projects/hwy11bridge

Hwy 11 and Hwy 72 — Baudette/Rainy River International Bridge Replacement

Description: Preliminary design and environmental study for the replacement of the Baudette/Rainy River International Bridge on Hwy 72 in the city of Baudette and Hwy 11 in the town of Rainy River.

Status: Work begins 2018

More information: mndot.gov/baudette-bridge

Hwy 12

Hwy 12 — Independence

Description: Resurface road and add rumble strips

Status: Construction scheduled May through June 2019

Traffic impacts: Single lane traffic with flagger

Contact: Dave Aeikens

Hwy 12 — Hwy 12 and Hwy 22 in Litchfield

Description: Reconstruction of four blocks of Hwy 12 and Hwy 22 through downtown Litchfield.

Status: Work begins 2019

Contact: Lowell Flaten

More information: mndot.gov/d8/projects/hwy12litchfield

Hwy 12 and Hwy 40 — Willmar Wye Rail Connector & Industrial Access Project

Description: Rail realignment and industrial park access

Status: Work begins in 2019.

Contact: Paul Rasmussen

More information: mndot.gov/d8/projects/willmarwye

Hwy 12 and Co. Rd. 101/Central Ave. Bridge — Wayzata

Description: Rehabilitate the Co. Rd. 101/Central Ave. Bridge over Hwy 12, add left turn lanes, reconstruct approaches, and rehabilitate ramp pavement

Status: Construction scheduled for spring through fall 2019

Contact: Dave Aeikens

More information: mndot.gov//metro/projects/hwy12andcountyroad101bridge

Hwy 13

Hwy 13 Prior Lake

Description: Reconstructing Hwy 13, constructing turn lanes, installing traffic signal and improving pedestrian crossings

Status: Work begins spring 2019

More information: mndot.gov/metro/projects/hwy13priorlake/

Sign up for Hwy 13 Prior Lake project email updates

Hwy 14

Hwy 14 — Mankato Bypass

Description: Resurface and repair Hwy 14 bypass around the city of Mankato

Status: Construction begins 2018

Contact: Rebecca Arndt

More information: mndot/gov/d7/projects/hwy14mankato

Hwy 14 — New Ulm to N. Mankato

Description: Replace New Ulm Minnesota River Bridge and Front Street Bridge, build interchange at Hwy 14/15/CR 21

Construction dates: Fall 2017 - fall 2019. In the meantime, MnDOT has taken steps to address the safety issues.

Traffic impacts: Lane closures

More information: mndot.gov/d7/projects/14newulmtonmankato

COMPLETE: Hwy 14 and I-35 — Steele County near Owatonna

Description: Replace 10 bridges and reconstruct short segment of Hwy 14

Construction dates: April 2017-Fall 2018
Traffic impacts: Lane closures

More information: mndot.gov/d6/projects/steelecty-bridge

Hwy 14 — Tracy to Revere

Description: Pavement resurfacing of Hwy 14 from Tracy to Revere
Status: Work begins in 2019
Contact: Kent Medalen
More information: mndot.gov/d8/projects/hwy14tracytorevere

Hwy 15

Hwy 15 — Kimball to St. Augusta

Description: Reconstruct the road surface, replace pipes and improve access on Hwy 15 from Hwy 55 in Kimball to 66th Ave in St. Augusta in Stearns County
Construction dates: April-July 2019
Traffic impacts: Detour

More information: mndot.gov/d3/projects/2019/h15/

Hwy 16

Hwy 16 — Dexter to Spring Valley

Description: Resurfacing with blacktop

Construction dates: Construction begins May 2019

Contact: Anne Meyer

More information: mndot.gov/d6/projects/hwy16-resurfacing

Hwy 18

Hwy 18 — Malmo

Description: Replace bridge over the Morman Creek west of Malmo, along Mille Lacs Lake, Aitkin County.
Construction dates: September-October 2019
Traffic impacts: Detour

More information: mndot.gov/d3/projects/malmo/h18

Hwy 19

Hwys 19 and 71 — Redwood Falls

Description: Construction of two-way left turn lane, signal replacements and replacement of pedestrian ramps, sidewalks and driveways to be in compliance with the Americans with Disabilities Act

Construction dates: Summer 2018 - spring 2019

Contact: Sandra Schlagel

More information: mndot.gov/d8/projects/hwys19and71redwoodfalls

Sign up for Hwy 19 and 71 Redwood Falls project email updates

Hwys 20–29

Hwy 22

Hwy 22 — Mapleton to Blue Earth County Road 15

Description: Reconstruct or mill-and-overlay deteriorating pavement segments. Replace Big Cobb River Bridge at Beauford

Construction dates: Spring 2017 - fall 2018

Traffic impacts: Detour

More information: mndot.gov/d7/projects/hwy22mapleton

Hwy 22 & Hwy 212 — Glencoe

Description: Transportation study
Study dates: Fall 2018 – summer 2019
Contact: Mandi Lighthizer-Schmidt
More information: mndot.gov/d8/projects/hwy212hwy22glencoe

Sign up for project email updates

Hwy 23

Hwy 23 — Carlton County

Description: Bridge removal project
Status: Construction May to July 2019
Contact: Brian Larson
More information: mndot.gov/d1/projects/hwy23bridge-removal

Hwy 23 — Marshall

Description: Construction of two reduced conflict intersections and restricted left turn lane

Construction dates: 2018 to 2019
Contact: Ben Sandoz
More information: mndot.gov/d8/projects/hwy23marshall

Hwy 23 — Mission Creek

Description: Burial recovery and cemetery restoration

Construction Dates: May 2017 (work has stopped, traffic impacts still in place)

Traffic Impacts: Lane closures

More Information: mndot.gov/d1/projects/hwy23-mission-creek

Hwy 25

Hwy 25 — Buffalo to Montrose

Description: Reconstruct the road surface and replace pipes on Hwy 25 from south of the Settlers Parkway roundabout in Buffalo to Hwy 12 near Montrose, Wright County.
Construction dates: August-October 2019
Traffic impacts: Detour

More information: mndot.gov/d3/projects/2019/h25

Hwy 25 — Montrose

Description: Resurface and improve Hwy 25 from Hwy 12 to 7th St S. (City of Montrose led project)
Construction dates: 2019
Traffic impacts: Detour via local streets
More information: montrose-mn.com

Hwy 27

Hwy 27 Little Falls

Description: Reconstruct and improve Hwy 27 through Little Falls. The project will make for a smoother road surface, update old underground city water and sewer infrastructure, update pedestrian sidewalks and signals.
Construction dates:  April-September 2019
Traffic impacts: Detours; truck route

More information: mndot.gov/d3/littlefalls

Sign up for Hwy 27 Little Falls project email updates

Hwy 27, 75 Wheaton

Description: Resurface, pedestrian accessibility improvements in Wheaton

Status: July/August 2019

Contact: Tom Pace

More information: mndot.gov/d4/projects/wheaton/

Sign up for Hwy 27, 75 Wheaton project email updates

Hwy 28

Hwy 28/29 Glenwood to Starbuck

Description: Resurface, shoulder widening, bypass lane at Co Hwy 24, left turn lanes at Golf Course Rd.
Status: 2019 construction season

Contact: Justin Knopf, project manager, 218-846-7968

More information: mndot.gov/d4/projects/hwy29glenwood

Sign up for Hwy 28/29 Glenwood to Starbuck project email updates

Hwys 30-39

Hwy 30

Hwy 30 — Chatfield to Rushford

Description: Repaving
Construction Dates: August – November 2019
Traffic impacts: Single lane closures
More information: mndot.gov/d6/projects/hwy30-repaving/index.html

Co Hwy 35

County Hwy 35 and Hwy 36 (Hadley Interchange)

Description: Develop final design and construction for intersection improvement at Hadley Avenue

Status: Funded for construction in 2019

More information: https://www.co.washington.mn.us/2504/HadleyInterchange This is a Washington County project.

I-35

I-35 — Corridor projects page

Description: A complete listing of projects happening along I-35 in Minnesota

Construction start dates: 2018

Traffic impacts: Various closures will occur, check project sites for specific details

More information: mndot.gov/metro/projects/i35corridor2018

I-35 — Goose Creek Rest Area

Description: Reconstruct building, grade and pave parking lot at the Goose Greek Rest Area

Construction dates: September 2017 through spring 2019

Traffic impacts: Rest Area closed

Contact: Denise Workcuff

I-35 – Harris to Chisago/Pine County line

Description: Concrete pavement work, drainage updates and safety improvements

Construction dates: Fall 2018 through fall 2019

Contact: Denise Workcuff

More information: mndot.gov/metro/projects/i35harris

Sign up for I-35 Harris to Chisago/Pine County line project email updates

I-35/I-535/Hwy 53 Twin Ports Interchange local roads improvement project in Duluth

Description: Improve local roads, relocate Coffee Creek

Status: Construction begins in summer 2019

Traffic impacts: Lane shifts/closures

More information: mndot.gov/d1/projects/tpi-local-roads

I-35, I-35E, I-35W — North Metro Split — Lino Lakes to Forest Lake

Description: Project includes resurfacing the road and replacing bridges

Construction dates: October 2017 through October 2019

Traffic impacts: Lane and ramp closures

More information: mndot.gov/metro/projects/i35northmetrosplit

Sign up for I-35 North Metro Split project email updates

I-35 — Pine County bridge replacement project over Snake River

Description: Resurfacing, new bridges

Status: Construction mid-April to late-October 2018, June to October 2019

Traffic Impacts: Lane restrictions, ramp detours

More information: mndot.gov/d1/projects/i35snakeriver

I-35 — St. Louis, Carlton and Pine counties bridge painting project

Description: Paint 10 bridges

Construction dates: Sept. 5 to fall 2018, work resumes in summer 2019

Traffic Impacts: Lane closures

More information: mndot.gov/d1/projects/i35bridges

COMPLETE: I-35 and Hwy 14 — Steele County near Owatonna

Description: Replace 10 bridges and reconstruct short segment of Hwy 14

Construction dates: April 2017-Fall 2018
Traffic impacts: Lane closures

More information: mndot.gov/d6/projects/steelecty-bridge

I-35E

I-35E, I-35W, I-35 — North Metro Split — Lino Lakes to Forest Lake

Description: Project includes resurfacing the road and replacing bridges

Construction dates: October 2017 through October 2019

Traffic impacts: Lane and ramp closures

More information: mndot.gov/metro/projects/i35northmetrosplit

Sign up for I-35 North Metro Split project email updates

I-35W

I-35W — Burnsville and Bloomington

Description: Reconstruct I-35W bridge over the Minnesota River, replace pavement, add northbound lane

Construction dates: Aug. 20, 2018 through November 2021

Traffic impacts: Lane closures and detours

Contact: Kirsten Klein

More Information: mndot.gov/metro/projects/i35wbloomington

Sign up for I-35W Burnsville project email updates

I-35W and Hwy 52 — Metro Wide Noise Wall Repairs

Description: Repair select noise walls along I-35W and Hwy 52 in Dakota and Hennepin Counties
Construction dates: October 2018 through Spring 2019
Traffic impacts:
Lane, ramp and shoulder closures
Contact: Dave Aeikens and Kirsten Klein
More information: mndot.gov/metro/projects/noisewallrepairs2018/

I-35W and I-94 — Downtown to Crosstown (Minneapolis)

Description: Improve transit and regional access, reconstruct bridges and pavement
Construction dates: August 2017 through fall 2021
Traffic impacts:
Road, lane and ramp closures and delays
More information:
mndot.gov/35w94

Sign up for 35W@94 project email updates

I-35W and I-94 — Minneapolis drainage tunnels

Description: Repair drain tunnels, construct new tunnel access shaft

Construction dates: Fall 2014 through early summer 2015; Fall 2015 through February 2019, weather permitting
Traffic impacts: Delays, lane closures at staging area

More information: mndot.gov/metro/projects/stevensavenuempls

I-35W — Minneapolis to Roseville

Description: Resurface road between 4th St. SE and County Rd. C

Construction dates: July through spring 2019

Traffic impacts: Five scheduled weekend road closures. Lane and ramp closures.

Contact: Kevin Walker

More Information: mndot.gov/metro/projects/i35w-mpls-roseville

Sign up for I-35W Minneapolis to Roseville project email updates

I-35W, I-35E, I-35 — North Metro Split — Lino Lakes to Forest Lake

Description: Project includes resurfacing the road and replacing bridges

Construction dates: October 2017 through October 2019

Traffic impacts: Lane and ramp closures

More information: mndot.gov/metro/projects/i35northmetrosplit

Sign up for I-35 North Metro Split project email updates

I-35W — From Roseville to Blaine/Lino Lakes

Description: Construct MnPASS Express Lanes (one lane in each direction) in the middle of existing I-35W between Co. Rd. C in Roseville and Lexington Ave. (Co. Rd. 17) in Blaine

Construction dates: Summer 2018 through fall 2021

Contact: Mark Lindeberg

More Information: mndot.gov/metro/projects/i35wroseville/

Sign up for I-35W project email updates

I-35W and 5th Street Pedestrian Bridge Repair — Minneapolis

Description: Build a new pedestrian and bike bridge at 5th St. SE over I-35W

Construction dates: 2019

Contact: Kevin Walker

More Information: mndot.gov/metro/projects/i35wandfifthstbridge/

Sign up for I-35W and 5th Street Pedestrian Bridge project email updates

Hwy 36

Hwy 36 and County Hwy 35 (Hadley Interchange)

Description: Develop final design and construction for intersection improvement at Hadley Avenue

Status: Funded for construction in 2019.

More information: https://www.co.washington.mn.us/2504/HadleyInterchange  This is a Washington County project.

Hwy 36 — Stillwater Lift Bridge

Description: Transformation into a bicycle/pedestrian crossing including repaired steel connections, restored mechanical and electrical components, repaired concrete railings, reconstructed concourse, paint and lighting replacements
Construction dates: Aug. 2017 through June 2019
Traffic impacts: The bridge is closed to all traffic, but will still operate to accommodate boat navigation.
More information: mndot.gov/metro/projects/liftbridge

Sign up for Stillwater Lift Bridge project email updates

Hwy 36 — St. Croix River Crossing

Description: Mitigation for construction of the new St. Croix River Crossing. Includes rehabilitation of the Stillwater Lift bridge, construction of the Upper Loop Trail along Hwy 95 and landscaping along Hwy 95 north of the bridge and in the interchange of Hwy 36 and Hwy 95
Construction dates: May 2014 through June 2019
Traffic impacts: Road closure and detour, lane closures, shoulder closures, noise impacts
More information: mndot.gov/stcroixcrossing

Sign up for Hwy 95 Stillwater/St. Croix Crossing project email updates

Hwy 95 (north of Hwy 36) — Upper Loop Trail and drainage

Description: Construction of the Upper Loop Trail along Hwy 95; improve drainage; and landscaping along Hwy 95 north of the bridge and in the interchange of Hwy 36 and Hwy 95
Construction dates: May 2014 through June 2019
Traffic impacts: Road closure and detour, lane closures, shoulder closures, noise impacts
More information: mndot.gov/metro/projects/hwy95stillwater
Information on Wisconsin Hwy 64 Loop Trail: projects.511wi.gov/stcroixcrossing

Sign up for Hwy 95 Stillwater project email updates

Hwy 37

Hwy 37 — St. Louis County bridge project

Description: Construct new bridge over Hwy 53

Construction dates: July to fall 2018, work resumes in spring 2019

Traffic impacts: none currently

More Information: mndot.gov/d1/projects/hwy37bridge

Hwy 39

Hwy 39 in Duluth

Description: Resurface road, drainage and accessibility improvements

Construction Dates: Work begins spring/summer 2019

Traffic Impacts: Lane closures, local detours

Contact: Derek Fredrickson

More Information: mndot.gov/d1/projects/hwy39/

Hwys 40-59

Hwy 40

Hwy 40 — Milan Bridge

Description: Replace bridge (known as Milan Bridge) over Lac qui Parle Lake west of Milan.
Status: Work begins in 2019.
Contact: Gene East
More information: mndot.gov/d8/projects/hwy40-bridge-milan

Hwy 41

Hwy 41 — Chaska

Description: Landscape, reconstruct and expand road, improve intersection, signals and pedestrian ramps, relocate trail and build underpass for trail between Hwy 212 and Pioneer Trail. Project lead is Carver County.

Construction dates: May through November 2018

Traffic Impacts: Full closure and detours

More information: co.carver.mn.us/departments/public-works/projects-studies/highway-41-project-jonathan

Hwy 43

Hwy 43 — Winona

Description: Repair current bridge and construct new bridge across Mississippi River

Construction dates: July 2014-fall 2019

Traffic impacts: Minimal — short-term local road detour

More information: mndot.gov/winonabridge

Sign up for Hwy 43 Winona project email updates

Hwy 47

Hwy 47 and Hwy 65 Safety Audit

Description: Conduct a Roadway Safety Audit to analyze crash information with a focus on pedestrian crashes on Hwy 47 and Hwy 65 between the Hennepin-Anoka County line in Columbia Heights and Hwy 10 in Coon Rapids.

Status: Summer 2018 to January 2019

Contact: Kevin Walker

More information: mndot.gov/metro/projects/hwy47andhwy65safetyaudit/

Sign up for Hwy 47 and Hwy 65 Safety Audit email updates

Hwy 52

Hwy 52 – Marion to Chatfield

Description: Construct improvements on Highway 52 from Marion to Chatfield

Status: Construction begins late May 2019

Contact: Heather Lukes

More information: mndot.gov/d6/projects/hwy52-marion-chatfield

Sign up for Hwy 52 – Marion to Chatfield project email updates

Hwy 52 and I-35W — Metro Wide Noise Wall Repairs

Description: Repair select noise walls along I-35W and Hwy 52 inn Dakota and Hennpin Counties
Construction dates: October 2018 through Spring 2019
Traffic impacts:
Lane, ramp and shoulder closures
Contact: Dave Aeikens and Kirsten Klein
More information: mndot.gov/metro/projects/noisewallrepairs2018/

Hwy 52 — Oronoco to Zumbrota

Description: Traffic Management System Installation (cameras)
Construction Dates: May 2019 – November 2019
Traffic impacts: Short lane and ramp closures
More information: mndot.gov/d6/projects/hwy52-traffic-management

Hwy 53

Hwy 53, Hwy 1 St. Louis, Koochiching Counties

Description: Intersection improvement, passing lanes project

Status: Construction begins in 2019

Contact: Josie Olson

More information: mndot.gov/d1/projects/hwy53-1-st.-louis-koochiching

Hwy 53 south of Eveleth

Description: Bridge repair, resurfacing project

Status: May to September 2019

Contact: Al Jicha

More information: mndot.gov/d1/projects/hwy53-so-of-eveleth

Hwy 55

Hwy 55 — Golden Valley

Description: Replace signal at Meadow Ln.

Construction dates: July 2018 through spring 2019

Traffic Impacts: Short-term lane closures

Contact: Dave Aeikens

Hwy 55 — Rockford to Theodore Wirth Pkwy

Description: Safety improvements including culvert replacement, tree removal, curb and gutter replacement and guardrail replacement

Construction dates: Sept. 4 2018 through spring 2019

Traffic impacts: Short-term lane closures

Contact: Dave Aeikens

More information: mndot.gov/metro/projects/hwy55safetyimprovements2018

Hwy 55 (Hiawatha) Storm Sewer project

Description: Repair storm sewer pipe that takes water from Hwy 55 in Minneapolis to the Mississippi River

Construction dates: Dec. 17, 2018 through May 2019

Traffic impacts: 28th St. closed between 42nd Ave. and alley east of 42nd Ave.

Contact: Dave Aeikens

Hwy 55—Annandale to Buffalo

Description: Description: Reconstruct the road surface, replace/repair pipes, and improve pedestrian access between Annandale Blvd in Annandale and Hwy 25 in Buffalo, includes a new center left-turn lane in Maple Lake east of Wright CR 8/Oak Ave.
Construction dates:  April-August 2019

Traffic impacts: Detours April-June; lane closures, flaggers


More information: mndot.gov/d3/projects/2019/h55

Hwy 55 – Barrett to the Grant/Douglas County line

Description: Resurface, Pomme de Terre River bridge replacement, culvert replacement

Status: 2019 construction

Contact: Katy Reierson, project manager, 218-846-3521

More information: mndot.gov/d4/projects/hwy55

Hwy 55 – Paynesville to west of Regal

Description: Resurface nine miles of road, upgrade guardrail and re-deck the bridge over the railroad tracks in Paynesville.
Construction dates: July-August 2019

Traffic impacts: Lane closures, flaggers, pilot car; detour in Paynesville to re-deck bridge
More information: mndot.gov/d3/projects/2019/h55stearns

Hwys 55, 59, 79 – Elbow Lake

Description: Resurface, complete streets reconstruction, accessibility improvements
Status: 2019 construction
Contact: Lori Vanderheider
More information: mndot.gov/d4/projects/elbowlake

Sign up for Hws 55, 59 79 - Elbow Lake project email updates

Hwy 57

Hwy 57 — Bridge Replacements

Description: Replace three bridges with new, wider bridges

Status: Construction begins early May 2019

Contact: Mike Dougherty

More information: mndot.gov/d6/projects/hwy57-bridge-replacements

Sign up for Hwy 57 Bridge Replacements project email updates

Hwys 60-79

Hwy 60

Hwy 60 — Windom to Mountain Lake

Description: Complete four-lane expansion of Hwy 60 from Windom to St. James

Construction dates: Spring 2017 through 2018

Traffic impacts: Lane closures

More information: mndot.gov/d7/projects/hwy60stjames

Hwy 60 — Heron Lake

Description: Construct two J-turns, also known as Reduced Conflict Intersections, and one restricted intersection

Status: Work begins 2019

Contact: Rebecca Arndt

More information: mndot.gov/d7/projects/hwy60heronlake

Hwy 60 — Windom

Description: Resurface Hwy 60, improve pedestrian ramps for ADA compliancy and storm sewer work.

Status: Work begins 2019

Traffic impacts: Construction will be done in phases with lanes reduced to single lanes in each direction.

Contact: Forrest Hasty

More information: mndot.gov/d7/projects/hwy60windom

Hwy 60 Resurfacing

Description: Construct improvements on Highway 60 from Zumbro Falls to Wabasha.

Status: Construction begins May 2019

Contact: Heather Lukes

More information: mndot.gov/d6/projects/hwy60-resurfacing-zumbrofalls-wabasha

Sign up for Hwy 60 Resurfacing project email updates

Hwy 61

Hwy 61 — Grand Marais

Description: Reconstruct and resurface Hwy 61 through Grand Marais, improve accessibility, replace box culverts

Status: Work begins Summer 2019
Contact: Michael Kalnbach

More Information: mndot.gov/d1/projects/hwy-61-grand-marais

Hwy 61 — Kellogg to Lake City

Description: Resurfacing
Contact: Chad Hanson

More Information: mndot.gov/d6/projects/hwy61-resurfacing

Sign up for Hwy 61 Kellogg to Lake City project email updates

Hwy 61 — Resurfacing Winona County

Description:Resurfacing Hwy 61 with blacktop between Homer and I-90
Contact: Anne Meyer

More Information: mndot.gov/d6/projects/hwy61-resurfacing-winona-county

Sign up for Hwy 61 Resurfacing Winona County email updates

COMPLETE: Hwy 61 — Two Harbors

Description: Signal replacements, resurfacing, accessibility improvements.

Status: June 11 through January 2019

More Information: mndot.gov/d1/projects/hwy61twoharbors/index.html

Hwy 62

Hwy 62 and Hwy 212 — Eden Prairie and Edina

Description: Resurface the hwy and move the pedestrian crossings at Beach Rd. from the east to the west of the intersection

Construction dates: July through spring 2019

Traffic impacts: Lane, shoulders and road closures with detours
Contact: David Aeikens

More information: mndot.gov/metro/projects/hwy62

Sign up for Hwy 62 Eden Prairie and Edina project email updates

Hwy 62 and France Avenue Bridge – Edina

Description: Reconstruct the deck of the France Ave. Bridge over Hwy 62. Reconstruct pavement on France Ave. in the intersections and replace both ramp signals. Lengthen an acceleration lane on the eastbound Hwy 62 entrance ramp to France Ave. And make sidewalk and accessibility improvements.

Status: Construction: April-July 2019

Contact: Dave Aeikens

More Information: mndot.gov/metro/projects/hwy62andfranceavebridge

Sign up for Hwy 62 and France Ave. Bridge project email updates

Hwy 63

Hwy 63 — Red Wing bridges

Description: Rehabilitate existing bridges, identify a preferred alternative for a bridge crossing between Red Wing, Minn. and Wisconsin

Status: Construction begins May 2017. Anticipated end date August 2020.

Contact: Mike Dougherty

More information: mndot.gov/d6/projects/redwing-bridge

Hwy 65

Hwy 65 — Blaine

Description: Install new signal system at the intersection of Hwy 65 and 105th Ave. NE and ADA Accessibility improvements

Construction dates: Preliminary work began mid-September 2017. Construction from Spring 2018 to Sept. 1, 2018.
Traffic impacts: Short-term lane closures. No closures during tournaments at the Natl. Sports Center

Contact: Kent Barnard

Hwy 65 — Blaine, Ham Lake and East Bethel

Description: Construction of Reduced Conflict Intersections along Hwy 65 from north of Bunker Lake Blvd to 245 Ave. N. Lengthen left turn lanes at intersections between 85th Ave., Blaine and Sims Rd., East Bethel

Construction dates: July 2018 through October 2019

Traffic impacts: Expect Intermittent temporary detours for local roads accessing Hwy 65 and off-peak lane closures on Hwy 65.

Contact: Kent Barnard

More information: mndot.gov/metro/projects/hwy65rci

Sign up for Hwy 65 project email updates

Hwy 65 — Fridley

Description: Replacement of aging storm sewer pipe, permanent sidewalk and curb and gutter along southbound highway between 64th Ave. and W. Moore Lake Dr.

Construction dates: Late August through spring 2019

Traffic impacts: Temporary lane/shoulder closures

Contact: Kent Barnard

More information: mndot.gov/metro/projects/hwy65fridley/

Hwy 65 — Nashwauk (Itasca County)

Description: Resurfaces Hwy 65 from Nashwauk to Hawkins

Status: May to late-October 2018, work resumes in spring 2019

Traffic impacts: None currently

Contact: Beth Petrowske

More information: mndot.gov/d1/projects/hwy65itascacounty

Hwy 65/Hwy107 intersection in Braham

Description: Install a newly redesigned T intersection with 'Continuous Green' traffic signal system at the junction of Hwy 65 and Hwy 107 in Braham, Isanti County.
Construction dates: April-June 2019

Traffic impacts: Lane closures, flaggers
More information: mndot.gov/d3/projects/braham

Hwy 65 Jacobson, Ball Bluff, Libby (Aitkin County)

Description: Resurfaces Hwy 65 through Jacobson, Ball Bluff and Libby in Aitkin County. Accessibility improvements at the Big Sandy Lake Overlook. Repairs or replaces several culverts.

Status: Work begins Summer 2019.

Contact: Randy Costley

More information: mndot.gov/d1/projects/hwy65

Hwy 65 – Isanti

Description: Improve access; install a Reduced Conflict Intersection (RCI) to improve access at Hwy 65/Cajima St NE, Isanti. (City or Isanti led project)
Construction dates: 2019
Traffic impacts: Lane/shoulder closures
More information about RCI’s: mndot.gov/roadwork/rci/

Hwy 67

Hwy 67 — Morgan

Description: Resurface road. Project led by City of Morgan.

Construction dates: Summer 2018 to 2021
Traffic impacts: Lane closures, pilot car and flagger

More information: mndot.gov/d8/projects/hwy67morgan

Hwy 71

Hwy 71 — Park Rapids

Description: Resurfacing 20 miles of Highway 71 between Park Rapids and Itasca State Park

Status: Sept to mid-Oct 2018

Contact: Emma Olson

More information: mndot.gov/d2/projects/2018/hwy71-park-rapids

Hwy 72

Hwy 72 and Hwy 11 — Baudette/Rainy River International Bridge Replacement

Description: Preliminary design and environmental study for the replacement of the Baudette/Rainy River International Bridge on Hwy 72 in the city of Baudette and Hwy 11 in the town of Rainy River.

Status: Environmental Study Complete: Spring 2016. Final Bridge Design: 2016-17. Construction: 2018.

More information: mndot.gov/baudette-bridge

Hwy 73

Hwy 73 — Floodwood

Description: Resurfacing project

Status: Sept. 10 - November 2018

Traffic impacts: Single lane closures, temporary detour

More information: mndot.gov/d1/projects/hwy73floodwood

Hwy 74

Hwy 74 – Beaver to Weaver

Description: Bridge replacements
Construction Dates: April 2019 – September 2019
Traffic impacts: Detour will be in place
More information: mndot.gov/d6/projects/hwy74-bridge-replacements

Hwy 75

Hwy 75 — Crookston Bypass

Description: Shoulder reconstruction, concrete repairs, bridge repairs and paving

Construction dates: May 2018

Contact: Emma Olson

More information: mndot.gov/d2/projects/2018/hwy75-crookston-bypass

Hwy 75 – Co 184 to Wilkin/Clay county line

Description: Resurface, storm sewer repair, and sidewalk improvements.

Status: 2019 Construction

Contact: Justin Knopf, project manager, 218-846-7968

More information: mndot.gov/d4/projects/hwy75wolverton

Hwy 77

Hwy 77 — Richfield

Description: Build underpass beneath Hwy 77 connecting 77th St. in Richfield to 66th St.; build ramps, build trail, sidewalk.

Construction dates: April 2019 to October 2020

Traffic impacts: Lane shifts, ramp closure from SB 77 to WB I-494

Contact: David Aeikens

More information: richfieldsweetstreets.org/projects/77th-street-underpass

Hwys 80-99

I-90

I-90 Concrete Overlay

Description: Concrete resurfacing on westbound I-90 from Freeborn County Road 46 to Highway 13.

Status: Begins fall 2018, work resumes in spring 2019

Contact: Mike Dougherty

More information: mndot.gov/d6/projects/i90-concreteoverlay

I-90 — Corridor Preservation

Description: Pavement restoration and bridge rehab

Construction dates: 2014-2018

More information: mndot.gov/d7/projects/I90preserve

Sign up for I-90 project email updates

I-90 — Bridge repair

Description:Repairing 12 bridges

Construction dates: April – November 2019

Traffic Impacts: Single lane closures

More information: mndot.gov/d6/projects/i90-bridge-repair

Sign up for I-90 bridge repair project email updates

Hwy 91

Hwy 91 in Adrian

Description: Resurface pavement, replace two box culverts, install right turn lanes

Construction Dates: Work begins 2019

Traffic Impacts: Lane closures, detour
Contact: Rebecca Arndt
More information: mndot.gov/d7/projects/hwy91/

Sign up for Hwy 91 project email updates

Hwy 91 Nobles/Murray County line to Russell

Description: Resurfacing of Hwy 91 from Nobles/Murray County line to Russell, replacement of four bridges, repair of culverts, sidewalk and pedestrian (ADA improvements) in Lake Wilson

Construction Dates: Work begins in 2019
Contact: Sandra Schlagel
More information: mndot.gov/d8/projects/hwy91Russell

Sign up for Hwy 91 project email updates

Hwy 92

Hwy 92 — Bagley

Description: Urban reconstruct, pedestrian improvements, curb/gutter and sewer replacement

Construction dates: May 14 to mid Aug 2018

Traffic impacts: Staged detours

More information: mndot.gov/d2/projects/2018/hwy92-bagley

I-94 in Twin Cities Metro

I-94 and I-35W — Downtown to Crosstown (Minneapolis)

Description: Improve transit and regional access, reconstruct bridges and pavement
Construction dates: August 2017 through fall 2021
Traffic impacts: Lane and ramp closures
More information:
mndot.gov/35w94

Sign up for 35W@94 project email updates

I-94 East Metro Interchange project (I-694/I-494/I-94)

Description: Reconstruct ramp, build new southbound auxiliary lane from 10th St. to I-94, replace and/or widen northbound and southbound interchange bridges, add northbound and southbound buffer lanes, construct ramp merge area and repair pavement.

Status: Maintenance work: December 2018, Construction: 2019-2020

Traffic impacts: Lane, ramp closures and delays

More Information: mndot.gov/metro/projects/i94-494-694

Sign up for I-94 East Metro Interchange project email updates

I-94 – Maple Grove to Clearwater

Description: Resurface road, replace/construct bridges, add lanes and improve access
Construction dates: April 2019 to fall 2021
Traffic impacts: All lanes will remain open during construction with lane restrictions on nights or weekends. Special consideration is being made to keep Friday evening weekend rush hour lanes open.

Contacts: Dave Aeikens (Metro District) and JP Gillach (District 3)

More Information: mndot.gov/i94-mg-clearwater/

Sign up for I-94 project email updates

I-94 — Minneapolis

Description: Crews will repair and paint the bridge over the blue line light-rail transit at 17th Ave.

Construction dates: April through October 2019

Traffic impacts: Up to three weekend closures, partial closure of the Hiawatha Trail with detour, possible freeway lane closures.

Contact: Dave Aeikens

More Information: mndot.gov/metro/projects/i94bridge-mpls/index.html

Sign up for I-94 project email updates

I-94 — Minneapolis noise wall replacement

Description: Replace noise wall on I-94 from Cedar Ave. to the Mississippi River

Construction dates: Mid-November 2017 through spring 2019

Traffic impacts: Crews will begin work in mid-November 2017, but will work away from traffic. Beginning spring 2018: ramp closures.

More Information: mndot.gov/metro/projects/i94mplsnoisewall

Sign up for I-94 Noise Wall Replacement project email updates

I-94 and I-35 — Minneapolis drainage tunnels

Description: Repair drain tunnels, construct new tunnel access shaft

Construction dates: Fall 2014 through February 2019
Traffic impacts: Delays, lane closures at staging area

More information: mndot.gov/metro/projects/stevensavenuempls

I-94 — West Lakeland Township

Description: Parking lot expansion for trucks at the St. Croix Rest Area in Washington Co.

Construction dates: Late-April 2018 through June 2018
Traffic impacts: Truck parking spaces reduced during project

Contact: Denise Workcuff

I-94 Resurfacing project

Description: Resurface road between Western Ave. and Hwy 280 in St. Paul, replace signals at Lexington Ave. intersections, accessible pedestrian signals at Cretin Ave. and Vandalia St. intersections, ADA improvements

Status: April through October 2019

Traffic impacts: Multiple weekend closures, lane and ramp closures

Contact: Kevin Walker

More Information: mndot.gov/metro/projects/i94-stpaul-resurfacing

Sign up for I-94 St. Paul project email updates

I-94 in Greater Minnesota

I-94 — Collegeville

Description: Re-deck the Stearns County Rd 159 bridge surface over I-94, west of St. Joseph in Collegeville.
Construction dates: June-August 2019

Traffic impacts: I-94 open; bridge closed with access detour 

More information: mndot.gov/d3/projects/2019/collegeville

I-94 – Maple Grove to Clearwater

Description: Resurface road, replace/construct bridges, add lanes and improve access
Construction dates: April 2019 to fall 2021
Traffic impacts: All lanes will remain open during construction with lane restrictions on nights or weekends. Special consideration is being made to keep Friday evening weekend rush hour lanes open.

Contacts: Dave Aeikens (Metro District) and JP Gillach (District 3)

More Information: mndot.gov/i94-mg-clearwater/

Sign up for I-94 project email updates

I-94 – Hwy 114 to Hwy 29

Description: Concrete resurface on eastbound Interstate 94
Status: 2019 construction
Contact: Nathan Bausman
More information: mndot.gov/d4/projects/i94overlay

I-94 – Lake Latoka near Alexandria

Description: Replace eastbound I-94 bridge over Lake Latoka
Status: 2019 construction (Year 2: Westbound bridge replaced in 2018)
Contact: Brian Bausman
More information: mndot.gov/d4/projects/94latoka

WB I-94 – Fuller Lake Rest Area

Description: Improve parking areas at the Fuller Lake Rest Area along westbound I-94, west of Clearwater, Stearns County.
Construction dates: 2019
Traffic impacts: Periodic parking closures
More information:  mndot.gov/restareas/i94.html

Hwy 119 – Hwy 40 to Hwy 12

Description: Resurface. Project in conjunction with District 8.
Status: 2019 construction
Contact: Brian Bausman
More information: mndot.gov/d4/projects/hwy119

Hwy 95

Hwy 95 and Manning Avenue — Washington County safety improvements

Description: Widening shoulders, resurface road, add turn lanes and update drainage.

Construction dates: Early July 2017 through late fall 2019; 2017 and 2018 project work complete

Traffic impacts: Closures, detours

More information: mndot.gov/metro/projects/hwy95safetyimprovements

Sign up for Hwy 95 Manning Avenue project email updates

Hwy 95, 36 — St. Croix River Crossing

Description: Mitigation for construction of the new St. Croix River Crossing. Includes rehabilitation of the Stillwater Lift bridge, construction of the upper loop trail along Hwy 95 and landscaping along Hwy 95 north of the bridge and in the interchange of Hwy 36 and Hwy 95.
Construction dates: May 2014 through June 2019
Traffic impacts: Road closure and detour, lane closures, shoulder closures, noise impacts
More information: mndot.gov/stcroixcrossing

Sign up for Stillwater Lift Bridge project email updates

Hwy 95, 36 — Stillwater

Description: Build St. Croix Crossing Upper Loop Trail, improve drainage
Construction dates: March 2018 through June 2019
Traffic impacts: Road closure (one month), detour
More information: mndot.gov/metro/projects/hwy95stillwater

Sign up for Hwy 95 Stillwater project email updates

Hwy 95, 36 — Stillwater Lift Bridge

Description: Transformation into a bicycle/pedestrian crossing including repaired steel connections, restored mechanical and electrical components, repaired concrete railings, reconstructed concourse, paint and lighting replacements.
Construction dates: Aug. 2017 through June 2019
Traffic impacts: The bridge is closed to all traffic, but will still operate to accommodate boat navigation.
More information: mndot.gov/metro/projects/liftbridge

Sign up for Stillwater Lift Bridge project email updates

Hwys 100-199

Hwy 100

Hwy 100 — Edina

Description: Update retaining wall and repair damage near NB ramp to Eden Ave.

Construction dates: August through October 2019

Traffic impacts: Closure of NB Hwy 100 ramp to Eden Ave.

Contact: Dave Aeikens

Co. Rd. 101

Co. Rd. 101/Central Ave. Bridge over Hwy 12– Wayzata

Description: Rehabilitate the Co. Rd. 101/Central Ave. Bridge over Hwy 12, add left turn lanes, reconstruct approaches, and rehabilitate ramp pavement

Status: Construction scheduled for spring through fall 2019

Contact: Dave Aeikens

More information: mndot.gov/metro/projects/hwy12andcountyroad101bridge/

Hwy 135

Hwy 135 between Gilbert and Town of White

Description: Resurfacing, bridge rehabilitation and intersection improvements on Hwy 135 between Hwy 53 and St. Louis County Road 21, including the communities of Gilbert, Aurora and the Town of White.

Status: Work begins 2019
Contact: Brian Larson

More information: mndot.gov/d1/projects/hwy135

Hwy 149

Hwy 149 High Bridge (Smith Avenue and Dodd Road) — St. Paul to Mendota Heights

Description: Resurface the road, reconstruct the driving surface of the High Bridge, construct turn lane, replace signals and improve drainage

Construction dates: September 2017 through early July 2019

Traffic impacts: High Bridge closed; Lane, trail and sidewalk closures

Contact: Kevin Walker

More information: mndot.gov/metro/projects/hwy149highbridge

Sign up for Hwy 149 High Bridge project email updates

Hwy 169 in the Twin Cities Metro

Hwy 41 and Hwy 169 — Scott County intersection improvements

Description: MnDOT and Scott County are constructing a new interchange at Highways 169/41/78 in Jackson and Louisville townships

Construction Dates: Fall 2018 through fall 2020

Traffic impacts: Hwy 169 lane closures and traffic shifts, temporary full road closures and detours, restricted access to Hwy 41 and Co. Rd. 78 from Hwy 169, and permanent access changes.

Contact: info@169-41improvements.com

More information: scottcountymn.gov/1778/Highways-1694178-Interchange

Sign up for Hwy 41 and Hwy 169 Intersection Improvements project email updates

Hwy 169 in Greater Minnesota

Hwy 169 Aitkin

Description: Restore the historic Pine-Hickory Lakes Roadside Parking Area
Construction dates: 2019
Traffic impacts: Parking closures

More information: mndot.gov/roadsides/historic/projects.html

Hwy 169 Garrison

Description: Restore historic northbound Hwy 169 bridge over a creek, along Mille Lacs Lake, between Hwy 18 and the Garrison Public Water Access at Pike Point
Construction dates:  July 9, 2018-June, 2019
Traffic Impacts: Lane closures; public water access is open

More information: mndot.gov/d3/2018/garrison

Hwy 169 Mankato

Description: Approximately 0.8 miles of Hwy 169 just north of the Hwy 14 junction will be grade raised to meet the 100-year base flood elevation to aid in flood protection of portions of Mankato and lower North Mankato.

Construction Dates: August to November 2018

Traffic Impacts: No detour for Hwy 169 through traffic is expected; expect periodic northbound and southbound lane closures on 169; expect periodic ramp closures and associated detours

More information: mndot.gov/d7/projects/hwy169mankato

Hwy 169 Mountain Iron

Description: Repair of two bridges, hwy resurfacing, and traffic signal and accessibility improvements.

Construction Dates: Work resumes in Spring 2019

Traffic Impacts: Short detour, temporary lane closures

More information: mndot.gov/d1/projects/hwy-169-mountain-iron

Hwy 169 St. Peter to Le Sueur

Description: Concrete overlay and pavement improvement

Status: Work begins 2018
Contact: Rebecca Arndt
More information: mndot.gov/d7/projects/hwy169

Hwy 169 — north of Vineland

Description: Restore historic Hwy 169 bridge over White Fish Creek in Mille Lacs county.
Construction dates: May-October 2019
Traffic Impacts: Shoulder closures, narrow lanes, lane shifts at bridge

More information: mndot.gov/roadsides/historic/projects.html

Hwy 194

Hwy 194, Mesaba Avenue and Hwy 2 Duluth

Description: Lane reconfiguration, bridge repairs, concrete pavement repairs and ADA improvements

Construction dates: May 14 to late November 2018

Traffic impacts: Lane closures, detour

Contact: Beth Petrowske

More information: mndot.gov/d1/projects/hwy194-mesaba-duluth

Hwys 200-299

Hwy 210

Hwy 210 — Brainerd to Ironton

Description: Reconstruct 14 miles of road surface, replace/repair pipes and improve access on Hwy 210 from the end of the four-lane in Brainerd to 7th Ave in Ironton, in Crow Wing County
Construction dates: July-October 2019
Traffic impacts: Detour

More information: mndot.gov/d3/projects/2019/h210

Sign up for project email updates

Hwy 212

Hwy 212 Cologne/Dahlgren Township

Description: Construct two Reduced Conflict Intersections (RCI) on Hwy 212 between Co. Hwy 41 and Co. Hwy 36
Construction: August through November 2019
Contact: Kirsten Klein
More information: mndot.gov/metro/projects/hwy212cologne/

Sign up for Hwy 212 Cologne/Dahlgren Township project email updates

Hwy 212 & Hwy 22 — Glencoe

Description: Transportation study
Study dates: Fall 2018 – summer 2019
Contact: Mandi Lighthizer-Schmidt
More information: mndot.gov/d8/projects/hwy212hwy22glencoe

Sign up for project email updates

Hwys 300-694

Hwy 371

Hwy 371 – Nisswa to Jenkins

Description: Landscape along new four-lane.
Construction dates: 2018-2019
Traffic impacts: Minimal

I-494

I-494 Inver Grove Heights and South St. Paul

Description: Bridge deck resurfacing and auxiliary lane addition

Construction dates: Fall 2018 through fall 2019

Traffic Impacts: Lane and ramp closures with detours

More information: mndot.gov/metro/projects/i494invergroveheights

Sign up for I-494 Inver grove Heights and South St. Paul project email updates

I-494, I-94 East Metro Interchange project (I-694/I-494/I-94)

Description: Reconstruct ramp, build new southbound auxiliary lane from 10th St. to I-94, replace and/or widen northbound and southbound interchange bridges, add northbound and southbound buffer lanes, construct ramp merge area and repair pavement.

Status: Maintenance work: December 2018, Construction: 2019-2020

Traffic impacts: Lane, ramp closures and delays

More Information: mndot.gov/metro/projects/i94-494-694

Sign up for I-94 East Metro Interchange project email updates

I-494 — Plymouth

Description: Replace the County Rd. 9 bridge over I-494 with a wider bridge and additional turn lanes.

Construction dates: Spring through fall 2019

Traffic impacts: Road and bridge closures, including Rockford Rd. I-494 will not have any lane closures during morning or afternoon rush hours.

Contact: Dave Aeikens

More information: plymouthmn.gov/departments/public-works/project-spotlight/street-projects/county-road-9-bridge-over-i-494

I-494 — Richfield

Description: Build tunnel under I-494 at Knox Ave. for Orange line bus rapid transit.

Construction dates: May 2019 to October 2021

Traffic impacts: Closure of ramps from SB I-35W to WB I-494 and from EB I-494 to SB I-35W

Contact: Dave Aeikens

More information: metrotransit.org/metro-orange-line

I-694

I-694, I-94 East Metro Interchange project (I-694/I-494/I-94)

Description: Reconstruct ramp, build new southbound auxiliary lane from 10th St. to I-94, replace and/or widen northbound and southbound interchange bridges, add northbound and southbound buffer lanes, construct ramp merge area and repair pavement.

Status: Maintenance work: December 2018, Construction: 2019-2020

Traffic impacts: Lane, ramp closures and delays

More Information: mndot.gov/metro/projects/i94-494-694

Sign up for I-94 East Metro Interchange project email updates

Hwy 610

Hwy 610 Brooklyn Park to Coon Rapids

Description: Install traffic management system Hwy 169 in Brooklyn Park to the Mississippi River in Coon Rapids and on 169 from I-394 in Golden Valley to I-94 in Brooklyn Park

Construction dates: Spring through fall 2018

Traffic impacts: Off-peak lane closures

Contact: Kent Barnard