Through late October: Intersection closed at 4th St., eastbound Hwy 10 and the W Frontage Rd. to construct new 4th St. connection and future bridge to span Hwy 10. New bridge to be complete in 2024.
Access to businesses will be maintained, follow signs
St. Cloud is open
Access will be open and maintained to those who live, work, visit or shop within this project area; however, expect changes and use of alternate entrances, and follow road signs
About this project
Summary of work
Reconstruct and improve the Hwy 10 and 23 interchange:
Rebuild the Hwy 23 bridge(s) over Hwy 10
Reconfigure on/off ramps to improve motorist traffic flow and safety
Provide safer pedestrian and bicyclist crossing options
Reconstruct both directions of Hwy 10 between 15th Ave. SE and Benton Dr. includes turn lanes, shoulders and entrances
Reconstruct both directions of Hwy 23 from east of Wilson Ave. SE near the pedestrian overpass to east of Benton Co. Rd. 1, includes turn lanes, shoulders and entrances
Update signal systems at:
Hwy 23 and Lincoln Ave.
Hwy 10/E St Germain St.
Hwy 23 and Division St. E/14th Ave. SE
Replace or repair drainage structures
Construct a new City of St. Cloud Fourth St. SE bridge to span Hwy 10 and connect to the east and west Hwy 10 frontage roads
Construct a noisewall along the south side of Hwy 23 and east of 14th Ave. SE