About this project
Fifteen miles of eastbound I-90 between Sherburn and Fairmont will be resurfaced in 2022.
Summary of work
- Resurface traffic lanes, shoulders, and ramps
 - Update guardrail
 - Improve drainage by cleaning, repairing, or replacing pipes and culverts
 - Update lighting at Hwy 4 and Hwy 15 interchanges
 
Traffic impacts
- No detour is required; traffic will be reduced to single lane in the eastbound lanes during construction
 - Approximately one-week ramp closures will be required at Hwy 263 and CR 39 (eastbound on and off ramps only)
          
- Timing yet to be determined, as it's dependent on contractor schedule and weather
 - Ramp closure signing will be placed in advance of closures
 
 
        I-90 Sherburn to Fairmont detour map