About this project
Summary of MnDOT work
- MnDOT is reconstructing Hwy 67, from just east of the intersection of Hwy 59 to 6th Street in Clarkfield. Replacement of storm sewer is included in the project.
- The project includes replacement of sidewalks and the addition of pedestrian ramps to meet Americans with Disabilities (ADA) standards.
- Alongside the MnDOT project, BNSF Railway will be replacing track at the intersection of Highway 59 and Highway 67.
Detour
- A detour of Hwy 67 is in place and will remain in place for the duration of the MnDOT project.
- Local traffic in Clarkfield is asked to be alert for workers and heavy equipment.
Project updates
Sep. 6, 2024
- Crews are staking out curb and concrete sidewalk.
- They are also preparing the road surface for paving next week.