Project complete

Hwy 316 project location map.
About this project
The purpose of this project was to repave the road for a smoother surface, improve safety by adding several turn lanes in Ravenna Township, and improve drainage on the north end of the project near Tuttle Dr.
Summary of work
- Repaved Hwy 316 between south junction of Hwy 61 and Tuttle Dr.
- Added left turn lanes at the following locations:
- Oxley Ave.
- Bauer Circle
- Pine Ridge Rd.