Pedestrian and bicyclists impacts

Stone Arch Bridge project location map.
Current
Bridge closure
Early December 2024 through fall 2025
- The downtown side of the Stone Arch Bridge is closed. Pedestrians and bicyclists will not be able to cross the full length of the bridge.
- Pedestrian detour: SE 6th Ave. to SE 2nd St. to Central Ave./Third Ave. Bridge to S. 1st St. (PNG)
- Northbound bicyclist detour: W. River Pkwy. to Portland Ave. to S. 2nd St. to Third Ave. Bridge/Central Ave. to SE University Ave. to SE 6th Ave. (PNG)
- Southbound bicyclist detour: SE 6th Ave. to SE 4th St. to Central Ave./Third Ave. Bridge to S. 2nd St. to Portland Ave. to W. River Pkwy. (PNG)
Upcoming
Information about upcoming pedestrian and bicyclists impacts will be posted as details become available. During construction, pedestrians and bicyclists will not be able to cross the full length of the bridge. Crews will close half of the bridge at a time during construction, allowing people to walk or bike to the middle of the bridge and turn around at the closure.
About this project
The historic Stone Arch bridge in Minneapolis will get repairs to the mortar. The rocks and stones will be replaced and repaired as needed.
Summary of work
- Repoint mortar on entire bridge
- Repair/replace stone
- Additional repairs as required