Minnesota Department of Transportation

511 Travel Info

Hwy 22/Dodd Rd Corridor Study

St. Peter

About this Study

Hwy 93 location map

Hwy 22/Dodd Road study area (view full-size map)

MnDOT partnered with the City of St. Peter on a Corridor Study of Hwy 22 (Dodd Road) from Hwy 169 to Nicollet County Road 20. A traffic study and engineering analysis along with community input identified potential improvements that will be part of a future MnDOT project.

Goals of Hwy 22 Corridor Study

  • Identify opportunities to improve safety and traffic flow at intersections
  • Determine current and future bicycle, pedestrian, and transit needs
  • Outline aesthetic opportunities
  • Provide recommendations for current highway accesses, as it relates to balancing safety and local business accessibility

Final Report

The Hwy 22 Corridor Study was completed in 2023. The final report of findings, alternatives, and recommendations for a future project can be found here:

Hwy 22/Dodd Road Corridor Study - Final Report