Project construction photos

Pouring concrete for the observation plazas surrounding the base of the piers (Sept. 3, 2008).

Constructing the concrete barriers (Aug. 20, 2008).

Aerial view of the bridge as finishing work progresses (Aug. 20, 2008).

Concrete being placed for the southbound lanes at Span 4 on the north end of the bridge (Aug. 11, 2008).

Signage is being installed (Aug. 11, 2008).

Planting and landscaping is being completed (Aug. 11, 2008).
View full-size image
Recently paved highway on the north side of the project, near University Avenue (Aug. 4, 2008).
View full-size image
Span 4 between Abutment 5 and Second Street southeast (Aug. 4, 2008).
View full-size image
Barrier rail installation on the main bridge (Aug. 4, 2008).
View full-size image
The pier extensions protect the bridge bearings and add to the aesthetic appeal of the structure (Aug. 20, 2008).
View full-size image
Two 30 foot tall gateway elements being installed in the median of the bridge to mark the crossing of the Mississippi River (Sept. 8, 2008).
View full-size image