MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MN SHIP.
Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.
What was selected
Related links
- District 7 project selection
- District 7 Non-National Highway System pavement projects
- District 7 Urban pavement projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).
Last updated September 2025
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
100 | I90 | Resurface WB lanes from Jackson CR 5 to MN 60 near Worthington and rehab bridge 53819 | $5,700,000 | 2032 | 3280-1052560 |
94 | I90 | Major CPR and diamond grinding westbound lanes from Rock River to Rock County Road 4 near Beaver Creek | $8,130,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
94 | I90 | Medium mill and overlay westbound lanes from 1.4 miles east of MN60 to 1.4 miles east of Nobles County Road 13 | $6,060,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
90 | US169 | Resurface and repair bridges on Hwy 169 from Riverfront Drive to Lake Street | $79,700,000 | 2027, 2028 | 0713-81 and 5212-42. Costs combined and include local particiaption. |
87 | I90 | Resurface EB I-90 from Rock/Nobles Co line to Adrian; replace bridge 53804 and rehab bridge 53806; replace or improve signing and lighting | $2,000,000 | 2029 | 5380-154 |
87 | MN60 | Repair WB lanes from Worthington to Windom and EB lanes at Heron Lake and from Wilder to Windom | $18,200,000 | 2033 | 3204-70 |
87 | MN60 | Resurface Hwy 60 EB lanes from I-90 to west side of Heron Lake and east side of Heron Lake to Wilder | $18,800,000 | 2035 | 3204-XX |
86 | US14 | Resurface Hwy 14 from 3rd Ave to Riverfront Dr in Mankato; replace bridges 07009, 07010, 07017, and 07018; rehab bridges 07015 and 07016; replace or improve drainage, signing and lighting | $37,300,000 | 2034 | 0702-XX |
85 | I90 | Resurface WB lanes from Hwy 4 to Hwy 86 | $15,000,000 | 2031 | 3280-XX |
84 | I90 | Medium mill and overlay eastbound lanes from County Road 13 near Rushmore to 1 mile east of MN 60 | $5,400,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
84 | I90 | Resurface EB I-90 from CR 4 at Beaver Creek to the Rock River; rehab 67802; replace or improve signing and lighting | $7,900,000 | 2030 | 6780-126 |
83 | I90 | Medium mill and overlay westbound lanes from MN 15 to MN 4 | $7,320,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
83 | I90 | Medium mill and overlay westbound lanes from MN60 to Jackson County Road 5 | $4,740,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
83 | I90 | Resurface EB lanes Rock County to Adrian and WB lanes from Adrian to Rushmore | $32,800,000 | 2029 | 5380-154 This project was selected for the FY29 Long Term Pavement Supplement, scoring an 83 in that solicitation. |
80 | MN60 | Cold in place recycling and medium overlay from north of I-90 to southwest of Nobles County Road 24 | $2,300,000 | 2035 | 3204-XX |
82 | MN60 | Medium mill and overlay from Lake Crystal to 528th Avenue (Cray Corner) | $6,900,000 | 2033 | 0708-46 |
82 | US169 | Medium mill and overlay northbound lanes from Le Sueur County Road 28 to MN 19 | $3,900,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
82 | US169 | Medium mill and overlay northbound lanes from Union St to MN 93 | $1,820,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
93 | US169 | Medium mill and overlay from west junction of MN60/US169 to north end of Minnesota River (North Star) Bridge | $31,500,000 | 2035 | 0713-XX |
80 | MN60 | Repair pavement on Mountain Lake bypass | $6,600,000 | 2033 | 1703-82 |
80 | US14 | Medium mill and overlay from County Road 37 at Smith's Mill to Waseca County Road 2 overpass | $11,900,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
80 | US169 | Diamond grind from Mankato to Saint Peter | $6,000,000 | Not Selected | 5211-74; Shelf Project |
79 | MN60 | Medium mill and overlay westbound lanes from County Road 47 to I-90 | $3,670,000 | Not Selected | |
79 | US71 | Resurface from Iowa border to North Hwy in Jackson | $12,700,000 | 2030 | 3205-36 |
78 | I90 | Cold in place recycling and medium overlay eastbound lanes from MN 86 to east of MN 4 | $10,500,000 | Not Selected | |
78 | MN15 | Cold in place recycling and medium overlay from Cottonwood St to 20th St S in New Ulm | $870,000 | Not Selected | |
78 | MN60 | Minor CPR and diamond grinding from west of Cottonwood County Road 47 to Watonwan County Road 5 near Butterfield. | $2,510,000 | Not Selected | |
77 | MN60 | Medium mill and overlay eastbound lanes from Jackson County Road 24 to Alder St in Wilder | $2,430,000 | 2035 | 3204-XX |
76 | US14 | Medium mill and overlay from 2 miles west of MN111 to Lookout Dr | $8,140,000 | Not Selected | |
76 | US14 | Repair from CR 3 to 2 miles east of Eagle Lake | $15,300,000 | 2034 | 0702-128 |
75 | MN60 | Resurface WB lanes between St. James and Butterfield | $2,800,000 | 2029 | 8308-115 |
75 | MN60 | Unbonded overlay westbound lanes from 1.6 miles east of Blue Earth County Road 109 to MN 15 bridge. | $14,800,000 | Not Selected | |
74 | MN60 | Medium mill and overlay from Nobles County Road 4 to north of I-90 | $12,400,000 | 2033 | 3204-70 |
74 | MN60 | Unbonded overlay from Blue Earth County Road 115 connecting with US169 and extending north to the Minnesota River Bridge | $7,310,000 | 2035 | 0713-XX |
73 | US14 | Major CPR from Waseca County Road 2 overpass to Steel County Line | $10,070,000 | Not Selected | |
73 | US169 | Medium mill and overlay from Blue Earth County Road 13 to MN60 | $4,660,000 | Not Selected | |
73 | US169 | Medium overlay from 1 mile north of I-90 to MN 109 in Winnebago | $4,280,000 | Not Selected | |
73 | US71 | Medium mill and overlay from MN30 to 120th St (Sanborn City limits) | $6,140,000 | Not Selected | |
72 | US169 | Major CPR from north Jct Hwy 93 to rest area at Le Sueur | $11,000,000 | 2032 | 4013-66 |
71 | MN60 | Medium mill and overlay from .3 miles south of Jackson County Road 24 to .5 miles north of Jackson County Road 24 near Heron Lake | $1,590,000 | 2035 | 3204-XX |
71 | MN60 | Medium mill and overlay from Iowa Border to Nobles County Road 4 | $2,980,000 | Not Selected | |
71 | MN60 | Thin mill and overlay eastbound from Cottonwood County Road 27 to Watonwan County Road 5 | $1,090,000 | Not Selected | |
70 | MN15 | Medium mill and overlay from 1.2 miles south of Brown County Road 24 to Cottonwood St | $11,870,000 | Not Selected | |
69 | MN15 | Medium mill and overlay from 4th St to Goemann Rd | $15,000,000 | 2033 | 4603-XX |
68 | US14 | Unbonded overlay eastbound lanes from 1 mile east of MN111 to 520th St cul-de-sac. | $10,780,000 | Not Selected | |
67 | US14 | Major CPR from MN60 to eastern junction of Blue Earth County Road 37 at Smith's Mill | $3,190,000 | Not Selected | |
67 | US169 | Medium mill and overlay from Faribault County Road 52 to .17 miles north of Faribault County Road 52 | $60,000 | Not Selected | |
66 | US14 | Medium mill and overlay from Brown County Road 27 to Palmer Ave Roundabout in New Ulm | $4,910,000 | Not Selected | |
63 | MN15 | Medium mill and overlay from Goemann Rd to Martin/Watonwan County line | $5,790,000 | Not Selected | |
61 | US59 | Minor CPR and diamond grinding from Prairie Dr to 27th St N in Worthington | $90,000 | 2027 | 5304-41. Tied to reconstruction project to south. |
58 | I90 | Thin mill and overlay from Rock River to Rock/Nobles County Line | $2,450,000 | Not Selected | |
56 | MN22 | Resurface Hwy 22 from Mankato to St. Peter; replace 1 bridge and repair 3 bridges and construct 1 new bridge; construct roundabout at Le Sueur Co Hwy 21 and Hwy 22. Preliminary work in 2024; Construction/detour 2025-2026. | $39,378,795 | 2025, 2026, 2027 | 0714-35; Reconstruct to integrate safety improvements |
54 | I90 | Medium mill and overlay westbound lanes from County Road 35/Minnesota Southern Railroad bridge to Rock/Nobles County Line | $6,510,000 | Not Selected | |
54 | MN22 | Resurface Hwy 22 from Hwy 14 to CR 26 | $10,000,000 | 2033 | 0714-1101719 |
54 | MN60 | Diamond grinding from Nobles County Road 24 near Heron Lake to Jackson County Road 47 near Brewster | $2,130,000 | Not Selected | Address this pavement with adjacent work |
48 | US169 | Medium mill and overlay from US14 to MN 99 | $8,900,000 | Not Selected | |
46 | MN60 | Reconstruct Hwy 60 in Lake Crystal from CR 20 to CR 112; improve pedestrian crossings; repair three bridges; construct bike trail; improve intersection | $21,600,000 | 2025, 2026 | 0708-47 Extensive pavement deterioration |
45 | MN60 | Minor CPR and Diamond Grinding from Alder St to MN 62 | $2,940,000 | Not Selected | |
44 | US59 | Thick overlay from 27th St north to MN 62 | $16,700,000 | 2034 | 5304-44 |
44 | MN60 | Unbonded overlay 0.7 miles east of Caldwell Drive near Windom to 0.6 miles east of Cottonwood CR 8 east of Mountain Lake | $18,820,000 | Not Selected | |
40 | US14 | Thin mill and overlay from Palmer Ave to Garden St in New Ulm | $1,720,000 | Not Selected | |
35 | US169 | Thin mill and overlay from Leland Parkway/Blue Earth County Road 16 to north of I-90 | $770,000 | Not Selected | |
34 | MN22 | Reclaim and overlay from Blue Earth County Road 26 to South of Riverfront Dr (Blue Earth County Road 57) | $1,370,000 | 2027 | 0714-35. Tied to project to north. |
34 | US169 | Thin mill and overlay from .7 miles north of I-90 to 1 mile north of I-90 | $350,000 | Not Selected | |
33 | I90 | Medium mill and overlay eastbound lanes from County Road 35/MN Southern Railroad Bridge to 1.1 miles east of Nobles County Road 13 | $4,510,000 | Not Selected | |
33 | I90 | Medium mill and overlay westbound lanes from Jackson County Road 5 bridge to MN 15 | $10,260,000 | Not Selected | |
33 | I90 | Medium mill and overlay westbound lanes from MN 86 to Jackson County Road 5 bridge | $6,380,000 | Not Selected | |
33 | I90 | Minor CPR eastbound lanes from Jackson County Road 5 to MN86 | $2,330,000 | Not Selected | |
29 | MN23 | Thin mill and overlay from south I-90 ramps to Railroad Crossing in Jasper | $50,000 | Not Selected | |
29 | MN60 | MN60 from 1.2 miles west of MN4 to .4 miles west of west MN15 bridge | $16,220,000 | Not Selected | |
26 | MN15 | Medium mill and overlay from Minnesota Prairie Line Railroad to MN 19 | $160,000 | Not Selected | |
25 | I90 | Medium mill and overlay eastbound lanes from MN 22 to west of MN 109 | $2,050,000 | Not Selected | |
25 | I90 | Medium mill and overlay westbound lanes from MN109 to MN22 | $2,050,000 | Not Selected | |
19 | MN23 | Medium mill and overlay from Railroad Crossing to Rock/Pipestone County Line in Jasper | $8,810,000 | Not Selected | |
19 | US169 | Thin mill and overlay from Iowa border to Faribault County Road 52 | $3,050,000 | Not Selected | |
15 | US14 | Medium mill and overlay from Springfield City Limits to Railroad crossing on the east side of Sleepy Eye | $1,700,000 | Not Selected | |
15 | US71 | Thin mill and overlay from 120th St (Sanborn City Limit) to US14 | $350,000 | Not Selected | |
14 | MN15 | Medium mill and overlay from Watonwan/Brown County Line to 1.2 miles south of Brown County Road 34 | $2,400,000 | Not Selected | |
14 | MN60 | Medium mill and overlay from Caldwell Ave near Windom to east of Caldwell Ave | $100,000 | Not Selected | |
14 | MN60 | Minor CPR and diamond grinding from Watonwan County Road 5 in Butterfield to 690th Lane | $50,000 | Not Selected | |
9 | US169 | Thin mill and overlay from County Road 52 to 10th St in Blue Earth | $260,000 | Not Selected |
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
100 | I90 | Resurface WB lanes from Jackson CR 5 to Nobles CR 12 near Rushmore and rehab bridge 53819 | $11,500,000 | 2032 | 3280-1052560 |
94 | I90 | Major CPR and diamond grinding westbound lanes from Rock River to Rock County Road 4 near Beaver Creek | $8,130,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
94 | I90 | Medium mill and overlay westbound lanes from 1.4 miles east of Hwy 60 to 1.4 miles east of Nobles County Road 13 | $6,060,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
90 | US Hwy 169 | Resurface and repair bridges on Hwy 169 from Riverfront Drive to Lake Street | $32,800,000 | 2027 | 0713-81 |
87 | I90 | Resurface EB I-90 from Rock/Nobles Co line to Adrian; replace bridge 53804 and rehab bridge 53806; replace or improve signing and lighting | $2,000,000 | 2029 | 5380-154 |
87 | Hwy 60 | Repair WB lanes from Worthington to Windom and EB lanes at Heron Lake and from Wilder to Windom | $18,200,000 | 2033 | 3204-70 |
87 | Hwy 60 | Resurface Hwy 60 EB lanes from I-90 to west side of Heron Lake and east side of Heron Lake to Wilder | $18,800,000 | Not Selected | 3204-1112107. District intends to address concrete pavements on this highway first then return for bituminous. |
86 | US Hwy 14 | Resurface Hwy 14 from 3rd Ave to Riverfront Dr in Mankato; replace bridges 07009, 07010, 07017, and 07018; rehab bridges 07015 and 07016; replace or improve drainage, signing and lighting | $41,800,000 | 2034 | 0702-1101714; Not a district priority, will continue to monitor pavement performance |
85 | I90 | Resurface WB lanes from Hwy 4 to Hwy 86 | $21,500,000 | 2031 | 3280-1069643; Not a district priority, will continue to monitor pavement performance |
84 | I90 | Medium mill and overlay eastbound lanes from County Road 13 near Rushmore to 1 mile east of Hwy 60 | $5,400,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
84 | I90 | Resurface EB I-90 from CR 4 at Beaver Creek to the Rock River; rehab 67802; replace or improve signing and lighting | $7,900,000 | 2030 | 6780-126 |
83 | I90 | Medium mill and overlay westbound lanes from Hwy 15 to Hwy 4 | $7,320,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
83 | I90 | Medium mill and overlay westbound lanes from Hwy 60 to Jackson County Road 5 | $4,740,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
83 | I90 | Resurface EB lanes Rock County to Adrian and WB lanes from Adrian to Rushmore | $32,800,000 | 2029 | 5380-154 This project was selected for the FY29 Long Term Pavement Supplement, scoring an 83 in that solicitation. |
82 | Hwy 60 | Cold in place recycling and medium overlay from north of I-90 to southwest of Nobles County Road 24 | $1,500,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
82 | Hwy 60 | Resurface from Lake Crystal to 528th Avenue (Cray Corner) | $6,900,000 | 2033 | 0708-1071483; Not a district priority, will continue to monitor pavement performance |
82 | US Hwy 169 | Medium mill and overlay northbound lanes from Le Sueur County Road 28 to Hwy 19 | $3,900,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
82 | US Hwy 169 | Medium mill and overlay northbound lanes from Union St to Hwy 93 | $1,820,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
81 | US Hwy 169 | Unbonded overlay from west junction of Hwy 60/US Hwy 169 to north end of Minnesota River (North Star) Bridge | $19,880,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
80 | Hwy 60 | Repair pavement on Mountain Lake bypass | $6,600,000 | 2033 | 1703-82 |
80 | US Hwy 14 | Medium mill and overlay from County Road 37 at Smith's Mill to Waseca County Road 2 overpass | $11,900,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
80 | US Hwy 169 | Repair from Mankato to Saint Peter - Future Project | $6,000,000 | 2040 | 5211-74; Shelf Project |
79 | Hwy 60 | Medium mill and overlay westbound lanes from County Road 47 to I-90 | $3,670,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
79 | US Hwy 71 | Resurface from Iowa border to North Hwy in Jackson | $12,700,000 | 2030 | 3205-36 |
78 | I90 | Cold in place recycling and medium overlay eastbound lanes from Hwy 86 to east of Hwy 4 | $10,500,000 | Not Selected | NA |
78 | Hwy 15 | Cold in place recycling and medium overlay from Cottonwood St to 20th St S in New Ulm | $870,000 | Not Selected | NA |
78 | Hwy 60 | Minor CPR and diamond grinding from west of Cottonwood County Road 47 to Watonwan County Road 5 near Butterfield. | $2,510,000 | Not Selected | NA |
77 | Hwy 60 | Cold in place recycling and medium overlay eastbound lanes from Jackson County Road 24 to Alder St in Wilder | $2,430,000 | Not Selected | NA |
76 | US Hwy 14 | Medium mill and overlay from 2 miles west of Hwy 111 to Lookout Dr | $8,140,000 | Not Selected | NA |
76 | US Hwy 14 | Repair from CR 3 to 2 miles east of Eagle Lake | $15,300,000 | 2034 | 0702-128 |
75 | Hwy 60 | Resurface WB lanes between St. James and Butterfield | $2,800,000 | 2029 | 8308-115 |
75 | Hwy 60 | Unbonded overlay westbound lanes from 1.6 miles east of Blue Earth County Road 109 to Hwy 15 bridge. | $14,800,000 | Not Selected | NA |
74 | Hwy 60 | Medium mill and overlay from Nobles County Road 4 to north of I-90 | $12,400,000 | Not Selected | NA |
74 | Hwy 60 | Unbonded overlay from Blue Earth County Road 115 connecting with US Hwy 169 and extending north to the Minnesota River Bridge | $7,310,000 | Not Selected | NA |
73 | US Hwy 14 | Medium mill and overlay from Waseca County Road 2 overpass to Steel County Line | $10,070,000 | Not Selected | NA |
73 | US Hwy 169 | Medium mill and overlay from Blue Earth County Road 13 to Hwy 60 | $4,660,000 | Not Selected | NA |
73 | US Hwy 169 | Medium overlay from 1 mile north of I-90 to Hwy 109 in Winnebago | $4,280,000 | Not Selected | NA |
73 | US Hwy 71 | Medium mill and overlay from Hwy 30 to 120th St (Sanborn City limits) | $6,140,000 | Not Selected | NA |
72 | US Hwy 169 | Repair from north Jct Hwy 93 to rest area at Le Sueur | $4,000,000 | 2032 | 4013-66 |
71 | Hwy 60 | Medium mill and overlay from .3 miles south of Jackson County Road 24 to .5 miles north of Jackson County Road 24 near Heron Lake | $1,590,000 | Not Selected | NA |
71 | Hwy 60 | Medium mill and overlay from Iowa Border to Nobles County Road 4 | $2,980,000 | Not Selected | NA |
71 | Hwy 60 | Thin mill and overlay eastbound from Cottonwood County Road 27 to Watonwan County Road 5 | $1,090,000 | Not Selected | NA |
70 | Hwy 15 | Medium mill and overlay from 1.2 miles south of Brown County Road 24 to Cottonwood St | $11,870,000 | Not Selected | NA |
69 | Hwy 15 | Medium mill and overlay from 4th St to Goemann Rd | $260,000 | Not Selected | NA |
68 | US Hwy 14 | Unbonded overlay eastbound lanes from 1 mile east of Hwy 111 to 520th St cul-de-sac. | $10,780,000 | Not Selected | NA |
67 | US Hwy 14 | Medium mill and overlay from Hwy 60 to eastern junction of Blue Earth County Road 37 at Smith's Mill | $3,190,000 | Not Selected | NA |
67 | US Hwy 169 | Medium mill and overlay from Faribault County Road 52 to .17 miles north of Faribault County Road 52 | $60,000 | Not Selected | NA |
66 | US Hwy 14 | Medium mill and overlay from Brown County Road 27 to Palmer Ave Roundabout in New Ulm | $4,910,000 | Not Selected | NA |
63 | Hwy 15 | Medium mill and overlay from Goemann Rd to Brown/Watonwan County line | $5,790,000 | Not Selected | NA |
61 | US59 | Minor CPR and diamond grinding from Prairie Dr to 27th St N in Worthington | $90,000 | 2027 | 5304-41 |
58 | I90 | Thin mill and overlay from Rock River to Rock/Nobles County Line | $2,450,000 | Not Selected | NA |
56 | Hwy 22 | Resurface Hwy 22 from Mankato to St. Peter; replace 1 bridge and repair 3 bridges and construct 1 new bridge; construct roundabout at Le Sueur Co Hwy 21 and Hwy 22. Preliminary work in 2024; Construction/detour 2025-2026. | $39,378,795 | 2025, 2026, 2027 | 0714-35; Reconstruct to integrate safety improvements |
54 | I90 | Medium mill and overlay westbound lanes from County Road 35/Minnesota Southern Railroad bridge to Rock/Nobles County Line | $6,510,000 | Not Selected | NA |
54 | Hwy 22 | Resurface Hwy 22 from Hwy 14 to CR 26 | $10,000,000 | 2033 | 0714-1101719 |
54 | Hwy 60 | Diamond grinding from Nobles County Road 24 near Heron Lake to Jackson County Road 47 near Brewster | $2,130,000 | Not Selected | Address this pavement with adjacent work |
53 | US Hwy 169 | Medium mill and overlay southbound lanes from Hwy 93 to Jackson County Road 5 | $9,660,000 | Not Selected | NA |
48 | US Hwy 169 | Medium mill and overlay from US Hwy 14 to Hwy 99 | $8,900,000 | Not Selected | NA |
46 | Hwy 60 | Reconstruct Hwy 60 in Lake Crystal from CR 20 to CR 112; improve pedestrian crossings; repair three bridges; construct bike trail; improve intersection | $21,600,000 | 2025, 2026 | 0708-47 Extensive pavement deterioration |
45 | Hwy 60 | Minor CPR and Diamond Grinding from Alder St to Hwy 62 | $2,940,000 | Not Selected | NA |
44 | US59 | Thick overlay from 27th St north to Hwy 62 | $10,990,000 | 2034 | 5304-44 |
44 | Hwy 60 | Unbonded overlay 0.7 miles east of Caldwell Drive near Windom to 0.6 miles east of Cottonwood CR 8 east of Mountain Lake | $18,820,000 | Not Selected | NA |
40 | US Hwy 14 | Thin mill and overlay from Palmer Ave to Garden St in New Ulm | $1,720,000 | Not Selected | NA |
35 | US Hwy 169 | Thin mill and overlay from Leland Parkway/Blue Earth County Road 16 to north of I-90 | $770,000 | Not Selected | NA |
34 | Hwy 22 | Reclaim and overlay from Blue Earth County Road 26 to South of Riverfront Dr (Blue Earth County Road 57) | $1,370,000 | Not Selected | NA |
34 | US Hwy 169 | Thin mill and overlay from .7 miles north of I-90 to 1 mile north of I-90 | $350,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay eastbound lanes from County Road 35/Hwy Southern Railroad Bridge to 1.1 miles east of Nobles County Road 13 | $4,510,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay southbound lanes from Hwy 5 to 1.25 miles west of the eastbound Blue Earth Rest area | $5,940,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay westbound lanes from Jackson County Road 5 bridge to Hwy 15 | $10,260,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay westbound lanes from Hwy 86 to Jackson County Road 5 bridge | $6,380,000 | Not Selected | NA |
33 | I90 | Minor CPR eastbound lanes from Jackson County Road 5 to Hwy 86 | $2,330,000 | Not Selected | NA |
29 | Hwy 23 | Thin mill and overlay from south I-90 ramps to Railroad Crossing in Jasper | $50,000 | Not Selected | NA |
29 | Hwy 60 | Hwy 60 from 1.2 miles west of Hwy 4 to .4 miles west of west Hwy 15 bridge | $16,220,000 | Not Selected | NA |
26 | Hwy 15 | Medium mill and overlay from Minnesota Prairie Line Railroad to Hwy 19 | $160,000 | Not Selected | NA |
25 | I90 | Medium mill and overlay eastbound lanes from Hwy 22 to west of Hwy 109 | $2,050,000 | Not Selected | NA |
25 | I90 | Medium mill and overlay westbound lanes from Hwy 109 to Hwy 22 | $2,050,000 | Not Selected | NA |
19 | Hwy 23 | Medium mill and overlay from Railroad Crossing to Rock/Pipestone County Line in Jasper | $8,810,000 | Not Selected | NA |
19 | US Hwy 169 | Thin mill and overlay from Iowa border to Faribault County Road 52 | $3,050,000 | Not Selected | NA |
15 | US Hwy 14 | Medium mill and overlay from Springfield City Limits to Railroad crossing on the east side of Sleepy Eye | $1,700,000 | Not Selected | NA |
15 | US Hwy 71 | Thin mill and overlay from 120th St (Sanborn City Limit) to US Hwy 14 | $350,000 | Not Selected | NA |
14 | Hwy 15 | Medium mill and overlay from Watonwan/Brown County Line to 1.2 miles south of Brown County Road 34 | $2,400,000 | Not Selected | NA |
14 | Hwy 60 | Medium mill and overlay from Caldwell Ave near Windom to east of Caldwell Ave | $100,000 | Not Selected | NA |
14 | Hwy 60 | Minor CPR and diamond grinding from Watonwan County Road 5 in Butterfield to 690th Lane | $50,000 | Not Selected | NA |
9 | US Hwy 169 | Thin mill and overlay from County Road 52 to 10th St in Blue Earth | $260,000 | Not Selected | NA |
0 | US Hwy 169 | Minor CPR from Hwy 99 to South Minnesota Avenue frontage Road in St. Peter | $3,260,000 | Not Selected | NA |
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
94 | I90 | Major CPR and diamond grinding westbound lanes from Rock River to Rock County Road 4 near Beaver Creek | $8,130,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
94 | I90 | Medium mill and overlay westbound lanes from 1.4 miles east of Hwy 60 to 1.4 miles east of Nobles County Road 13 | $6,060,000 | Not Selected | NA |
87 | I90 | Resurface EB I-90 from Rock/Nobles Co line to Adrian; replace bridge 53804 and rehab bridge 53806; replace or improve signing and lighting | $2,000,000 | 2029 | 5380-1101713 |
87 | Hwy 60 | Resurface Hwy 60 EB lanes from I-90 to west side of Heron Lake and east side of Heron Lake to Wilder | $18,800,000 | 2033 | 3204-1112107 |
86 | US Hwy 14 | Resurface Hwy 14 from Lookout Dr to Victory Dr; replace bridges 07023, 07011, 07009, and 07010; replace or improve drainage, signing and lighting | $25,000,000 | 2032 | 0702-1101714 |
85 | US Hwy 169 | Repair from north Jct Hwy 93 to rest area at Le Sueur | $4,000,000 | 2030 | 4013-1071563 |
84 | I90 | Resurface EB I-90 from CR 4 at Beaver Creek to the Rock River; rehab bridge 9690; replaces bridges 9774, 67802, and 67806; replace or improve signing and lighting | $3,230,000 | 2030 | 6780-1101707 |
84 | I90 | Medium mill and overlay eastbound lanes from County Road 13 near Rushmore to 1 mile east of Hwy 60 | $5,400,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
83 | I90 | Resurface WB lanes from Adrian to Rushmore | $6,500,000 | 2028 | 5380-154 |
83 | I90 | Resurface WB lanes from CR 5 in Jackson to CR 12 near Rushmore | $11,500,000 | 2032 | 3280-1052560 |
83 | I90 | Medium mill and overlay westbound lanes from Hwy 15 to Hwy 4 | $7,320,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
83 | I90 | Medium mill and overlay westbound lanes from Hwy 60 to Jackson County Road 5 | $4,740,000 | Not Selected | NA |
82 | Hwy 60 | Repair WB lanes from Worthington to Windom and EB lanes at Heron Lake and from Wilder to Windom | $18,200,000 | 2030 | 3204-70 |
82 | Hwy 60 | Cold in place recycling and medium overlay from north of I-90 to southwest of Nobles County Road 24 | $1,500,000 | Not Selected | NA |
82 | US Hwy 169 | Medium mill and overlay northbound lanes from Le Sueur County Road 28 to Hwy 19 | $3,900,000 | Not Selected | NA |
82 | US Hwy 169 | Medium mill and overlay northbound lanes from Union St to Hwy 93 | $1,820,000 | Not Selected | NA |
81 | US Hwy 169 | Unbonded overlay from west junction of Hwy 60/US Hwy 169 to north end of Minnesota River (North Star) Bridge | $19,880,000 | Not Selected | NA |
80 | Hwy 60 | Resurface from Lake Crystal to Cray Corner/528th Avenue | $6,900,000 | 2032 | 0708-1071483 |
80 | US Hwy 14 | Repair from CR 3 to 2 miles east of Eagle Lake | $13,300,000 | 2029 | 0702-128 |
80 | US Hwy 14 | Medium mill and overlay from County Road 37 at Smith's Mill to Waseca County Road 2 overpass | $11,900,000 | Not Selected | NA |
79 | Hwy 60 | Medium mill and overlay westbound lanes from County Road 47 to I-90 | $3,670,000 | Not Selected | NA |
79 | US Hwy 71 | Resurface from Iowa border to CR 38 in Jackson | $9,500,000 | 2030 | 3205-36 |
78 | I90 | Resurface WB lanes from Hwy 4 to Hwy 86 | $10,000,000 | 2031 | 3280-1069643 |
78 | I90 | Cold in place recycling and medium overlay eastbound lanes from Hwy 86 to east of Hwy 4 | $10,500,000 | Not Selected | NA |
78 | I90 | Cold in place recycling and medium overlay westbound lanes from Hwy 4 to 2.5 miles east of Hwy 86 | $9,750,000 | Not Selected | NA |
78 | Hwy 15 | Cold in place recycling and medium overlay from Cottonwood St to 20th St S in New Ulm | $870,000 | Not Selected | NA |
78 | Hwy 60 | Repair pavement on Mountain Lake bypass | $6,600,000 | 2031 | 1703-82 |
78 | Hwy 60 | Reconstruct Hwy 60 in Lake Crystal from CR 20 to CR 112; improve pedestrian crossings; repair bridge | $16,800,000 | 2025, 2026 | 0708-47 Extensive pavement deterioration |
78 | Hwy 60 | Minor CPR and diamond grinding from west of Cottonwood County Road 47 to Watonwan County Road 5 near Butterfield. | $2,510,000 | Not Selected | NA |
77 | Hwy 60 | Cold in place recycling and medium overlay eastbound lanes from Jackson County Road 24 to Alder St in Wilder | $2,430,000 | Not Selected | NA |
76 | US Hwy 14 | Medium mill and overlay from 2 miles west of Hwy 111 to Lookout Dr | $8,140,000 | Not Selected | NA |
75 | Hwy 60 | Unbonded overlay westbound lanes from 1.6 miles east of Blue Earth County Road 109 to Hwy 15 bridge. | $14,800,000 | Not Selected | NA |
74 | Hwy 60 | Medium mill and overlay from Nobles County Road 4 to north of I-90 | $12,400,000 | Not Selected | NA |
74 | Hwy 60 | Unbonded overlay from Blue Earth County Road 115 connecting with US Hwy 169 and extending north to the Minnesota River Bridge | $7,310,000 | Not Selected | NA |
73 | Hwy 22 | Resurface Hwy 22 from Hwy 14 to CR 26; replace or improve drainage - Future Project | $1,800,000 | 2034 | 0714-1101719 |
73 | US Hwy 14 | Medium mill and overlay from Waseca County Road 2 overpass to Steel County Line | $10,070,000 | Not Selected | NA |
73 | US Hwy 169 | Resurface and repair bridges from Riverfront Drive to Lake Street | $69,500,000 | 2027, Future | 0713-81 |
73 | US Hwy 169 | Medium mill and overlay from Blue Earth County Road 13 to Hwy 60 | $4,660,000 | Not Selected | NA |
73 | US Hwy 169 | Medium overlay from 1 mile north of I-90 to Hwy 109 in Winnebago | $4,280,000 | Not Selected | NA |
73 | US Hwy 71 | Medium mill and overlay from Hwy 30 to 120th St (Sanborn City limits) | $6,140,000 | Not Selected | NA |
71 | Hwy 60 | Medium mill and overlay from .3 miles south of Jackson County Road 24 to .5 miles north of Jackson County Road 24 near Heron Lake | $1,590,000 | Not Selected | NA |
71 | Hwy 60 | Medium mill and overlay from Iowa Border to Nobles County Road 4 | $2,980,000 | Not Selected | NA |
71 | Hwy 60 | Thin mill and overlay eastbound from Cottonwood County Road 27 to Watonwan County Road 5 | $1,090,000 | Not Selected | NA |
71 | US59 | Thick overlay from 27th St north to Hwy 62 | $10,990,000 | Not Selected | NA |
70 | Hwy 15 | Medium mill and overlay from 1.2 miles south of Brown County Road 24 to Cottonwood St | $11,870,000 | Not Selected | NA |
69 | Hwy 15 | Medium mill and overlay from 4th St to Goemann Rd | $260,000 | Not Selected | NA |
68 | US Hwy 14 | Unbonded overlay eastbound lanes from 1 mile east of Hwy 111 to 520th St cul-de-sac. | $10,780,000 | Not Selected | NA |
67 | US Hwy 14 | Medium mill and overlay from Hwy 60 to eastern junction of Blue Earth County Road 37 at Smith's Mill | $3,190,000 | Not Selected | NA |
67 | US Hwy 169 | Medium mill and overlay from Faribault County Road 52 to .17 miles north of Faribault County Road 52 | $60,000 | Not Selected | NA |
66 | US Hwy 14 | Medium mill and overlay from Brown County Road 27 to Palmer Ave Roundabout in New Ulm | $4,910,000 | Not Selected | NA |
63 | Hwy 15 | Medium mill and overlay from Goemann Rd to Brown/Watonwan County line | $5,790,000 | Not Selected | NA |
62 | Hwy 60 | Resurface WB lanes between St. James and Butterfield | $2,800,000 | 2028 | 8308-115 |
61 | US59 | Minor CPR and diamond grinding from Prairie Dr to 27th St N in Worthington | $90,000 | Not Selected | NA |
58 | I90 | Thin mill and overlay from Rock River to Rock/Nobles County Line | $2,450,000 | Not Selected | NA |
58 | Hwy 22 | Resurface Hwy 22 from Mankato to St. Peter; replace 1 bridge and repair 3 bridges and construct 1 new bridge; construct roundabout at Le Sueur Co Hwy 21 and Hwy 22. | $39,890,000 | 2025, 2026, 2027 | 0714-35 |
54 | I90 | Medium mill and overlay westbound lanes from County Road 35/Minnesota Southern Railroad bridge to Rock/Nobles County Line | $6,510,000 | Not Selected | NA |
54 | Hwy 60 | Diamond grinding from Nobles County Road 24 near Heron Lake to Jackson County Road 47 near Brewster | $2,130,000 | Not Selected | Address this pavement with adjacent work |
53 | US Hwy 169 | Medium mill and overlay southbound lanes from Hwy 93 to Jackson County Road 5 | $9,660,000 | Not Selected | NA |
48 | US Hwy 169 | Medium mill and overlay from US Hwy 14 to Hwy 99 | $8,900,000 | Not Selected | NA |
45 | Hwy 60 | Minor CPR and Diamond Grinding from Alder St to Hwy 62 | $2,940,000 | Not Selected | NA |
44 | Hwy 60 | Unbonded overlay 0.7 miles east of Caldwell Drive near Windom to 0.6 miles east of Cottonwood CR 8 east of Mountain Lake | $18,820,000 | Not Selected | NA |
40 | US Hwy 14 | Thin mill and overlay from Palmer Ave to Garden St in New Ulm | $1,720,000 | Not Selected | NA |
35 | US Hwy 169 | Thin mill and overlay from Leland Parkway/Blue Earth County Road 16 to north of I-90 | $770,000 | Not Selected | NA |
34 | Hwy 22 | Reclaim and overlay from Blue Earth County Road 26 to South of Riverfront Dr (Blue Earth County Road 57) | $1,370,000 | Not Selected | NA |
34 | US Hwy 169 | Thin mill and overlay from .7 miles north of I-90 to 1 mile north of I-90 | $350,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay eastbound lanes from County Road 35/Hwy Southern Railroad Bridge to 1.1 miles east of Nobles County Road 13 | $4,510,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay southbound lanes from Hwy 5 to 1.25 miles west of the eastbound Blue Earth Rest area | $5,940,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay westbound lanes from Jackson County Road 5 bridge to Hwy 15 | $10,260,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay westbound lanes from Hwy 86 to Jackson County Road 5 bridge | $6,380,000 | Not Selected | NA |
33 | I90 | Minor CPR eastbound lanes from Jackson County Road 5 to Hwy 86 | $2,330,000 | Not Selected | NA |
29 | Hwy 23 | Thin mill and overlay from south I-90 ramps to Railroad Crossing in Jasper | $50,000 | Not Selected | NA |
29 | Hwy 60 | Hwy 60 from 1.2 miles west of Hwy 4 to .4 miles west of west Hwy 15 bridge | $16,220,000 | Not Selected | NA |
26 | Hwy 15 | Medium mill and overlay from Minnesota Prairie Line Railroad to Hwy 19 | $160,000 | Not Selected | NA |
25 | I90 | Medium mill and overlay eastbound lanes from Hwy 22 to west of Hwy 109 | $2,050,000 | Not Selected | NA |
25 | I90 | Medium mill and overlay westbound lanes from Hwy 109 to Hwy 22 | $2,050,000 | Not Selected | NA |
19 | Hwy 23 | Medium mill and overlay from Railroad Crossing to Rock/Pipestone County Line in Jasper | $8,810,000 | Not Selected | NA |
19 | US Hwy 169 | Thin mill and overlay from Iowa border to Faribault County Road 52 | $3,050,000 | Not Selected | NA |
18 | US Hwy 169 | Reconstruction from Hwy 99 to South Minnesota Avenue frontage Road in St. Peter | $3,260,000 | Not Selected | Addressing pavements with intersection reconfiguration as part of safety and mobility project |
15 | US Hwy 14 | Medium mill and overlay from Springfield City Limits to Railroad crossing on the east side of Sleepy Eye | $1,700,000 | Not Selected | NA |
15 | US Hwy 71 | Thin mill and overlay from 120th St (Sanborn City Limit) to US Hwy 14 | $350,000 | Not Selected | NA |
14 | Hwy 15 | Medium mill and overlay from Watonwan/Brown County Line to 1.2 miles south of Brown County Road 34 | $2,400,000 | Not Selected | NA |
14 | Hwy 60 | Medium mill and overlay from Caldwell Ave near Windom to east of Caldwell Ave | $100,000 | Not Selected | NA |
14 | Hwy 60 | Minor CPR and diamond grinding from Watonwan County Road 5 in Butterfield to 690th Lane | $50,000 | Not Selected | NA |
9 | US Hwy 169 | Thin mill and overlay from County Road 52 to 10th St in Blue Earth | $260,000 | Not Selected | NA |
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
94 | I90 | Major CPR and diamond grinding westbound lanes from Rock River to Rock County Road 4 near Beaver Creek | $8,130,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
94 | I90 | Medium mill and overlay westbound lanes from 1.4 miles east of Hwy 60 to 1.4 miles east of Nobles County Road 13 | $6,060,000 | Not Selected | NA |
93 | I90 | Resurface I-90 from west of Hwy 169 to Hwy 22 | $81,000,000 | 2023 | 2280-143 |
87 | I90 | Resurface EB I-90 from Rock/Nobles Co line to Adrian; replace bridge 53804 and rehab bridge 53806; replace or improve signing and lighting | $2,000,000 | 2032 | 5380-1101713 |
86 | US Hwy 14 | Resurface Hwy 14 from Lookout Dr to Victory Dr; replace bridges 07023, 07011, 07009, and 07010; replace or improve drainage, signing and lighting | $25,000,000 | 2032 | 0702-1101714 |
85 | US Hwy 169 | Repair from north Jct Hwy 93 to rest area at Le Sueur | $4,000,000 | 2030 | 4013-1071563 |
84 | I90 | Medium mill and overlay eastbound lanes from County Road 13 near Rushmore to 1 mile east of Hwy 60 | $5,400,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
84 | I90 | Resurface EB I-90 from CR 4 at Beaver Creek to the Rock River; rehab bridge 9690; replaces bridges 9774, 67802, and 67806; replace or improve signing and lighting | $3,230,000 | 2032 | 6780-1101707 |
83 | I90 | Medium mill and overlay westbound lanes from Hwy 15 to Hwy 4 | $7,320,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
83 | I90 | Resurface WB lanes from Adrian to Rushmore | $6,500,000 | 2026 | 5380-154 |
83 | I90 | Resurface WB lanes from CR 5 in Jackson to CR 12 near Rushmore | $11,500,000 | 2030 | 3280-1052560 |
83 | I90 | Medium mill and overlay westbound lanes from Hwy 60 to Jackson County Road 5 | $4,740,000 | Not Selected | NA |
82 | Hwy 60 | Resurface EB lanes from Worthington to Heron Lake and Heron Lake to Wilder | $18,200,000 | 2029 | 3204-70 |
82 | Hwy 60 | Recondition WB lanes from Windom to Worthington and EB lanes from Windom to Wilder and on Heron Lake bypass | $18,200,000 | 2029 | 3204 |
82 | Hwy 60 | Cold in place recycling and medium overlay from north of I-90 to southwest of Nobles County Road 24 | $1,500,000 | NA | NA |
82 | US Hwy 169 | Medium mill and overlay northbound lanes from Le Sueur County Road 28 to Hwy 19 | $3,900,000 | Not Selected | NA |
82 | US Hwy 169 | Medium mill and overlay northbound lanes from Union St to Hwy 93 | $1,820,000 | Not Selected | NA |
81 | US Hwy 169 | Unbonded overlay from west junction of Hwy 60/US Hwy 169 to north end of Minnesota River (North Star) Bridge | $19,880,000 | Not Selected | NA |
80 | Hwy 60 | Resurface from Lake Crystal to Cray Corner/528th Avenue | $6,900,000 | 2030 | 0708-1071483 |
80 | US Hwy 14 | Repair from CR 3 to 2 miles east of Eagle Lake | $5,800,000 | 2028 | 0702-128 |
80 | US Hwy 14 | Medium mill and overlay from County Road 37 at Smith's Mill to Waseca County Road 2 overpass | $11,900,000 | Not Selected | NA |
79 | Hwy 60 | Medium mill and overlay westbound lanes from County Road 47 to I-90 | $3,670,000 | Not Selected | NA |
79 | US Hwy 71 | Resurface from Iowa border to CR 38 in Jackson | $6,500,000 | 2030 | 3205-36 |
78 | I90 | Resurface WB lanes from Hwy 4 to Hwy 86 | $10,000,000 | 2031 | 3280-1069643 |
78 | I90 | Cold in place recycling and medium overlay westbound lanes from Hwy 4 to 2.5 miles east of Hwy 86 | $9,750,000 | Not Selected | NA |
78 | I90 | Cold in place recycling and medium overlay eastbound lanes from Hwy 86 to east of Hwy 4 | $10,500,000 | Not Selected | NA |
78 | Hwy 15 | Cold in place recycling and medium overlay from Cottonwood St to 20th St S in New Ulm | $870,000 | Not Selected | NA |
78 | Hwy 60 | Repair pavement on Mountain Lake bypass | $6,600,000 | 2028 | 1703-82 |
78 | Hwy 60 | Reconstruct Hwy 60 in Lake Crystal from CR 20 to CR 112; improve pedestrian crossings; repair bridge | $16,800,000 | 2025, 2026 | 0708-47; Extensive pavement deterioration |
78 | Hwy 60 | Minor CPR and diamond grinding from west of Cottonwood County Road 47 to Watonwan County Road 5 near Butterfield. | $2,510,000 | Not Selected | NA |
77 | Hwy 60 | Cold in place recycling and medium overlay eastbound lanes from Jackson County Road 24 to Alder St in Wilder | $2,430,000 | NA | NA |
76 | US Hwy 14 | Medium mill and overlay from 2 miles west of Hwy 111 to Lookout Dr | $8,140,000 | Not Selected | NA |
75 | Hwy 60 | Unbonded overlay westbound lanes from 1.6 miles east of Blue Earth County Road 109 to Hwy 15 bridge. | $14,800,000 | Not Selected | NA |
74 | Hwy 60 | Medium mill and overlay from Nobles County Road 4 to north of I-90 | $12,400,000 | Not Selected | NA |
74 | Hwy 60 | Unbonded overlay from Blue Earth County Road 115 connecting with US Hwy 169 and extending north to the Minnesota River Bridge | $7,310,000 | Not Selected | NA |
73 | Hwy 22 | Resurface Hwy 22 from Hwy 14 to CR 26; replace or improve drainage - Future Project | $1,800,000 | 2033 | 0714-1101719 |
73 | US Hwy 14 | Medium mill and overlay from Waseca County Road 2 overpass to Steel County Line | $10,070,000 | Not Selected | NA |
73 | US Hwy 169 | Unbonded overlay from Minnesota River to US Hwy 14 | $59,800,000 | 2027-2028 | 0713-81 bridge project |
73 | US Hwy 169 | Medium mill and overlay from Blue Earth County Road 13 to Hwy 60 | $4,660,000 | Not Selected | NA |
73 | US Hwy 169 | Medium overlay from 1 mile north of I-90 to Hwy 109 in Winnebago | $4,280,000 | Not Selected | NA |
73 | US Hwy 71 | Medium mill and overlay from Hwy 30 to 120th St (Sanborn City limits) | $6,140,000 | Not Selected | NA |
71 | Hwy 15 | Resurface Hwy 15 from Watonwan/Martin County line to south jct Hwy 60/Hwy 15; lighting and snowfence | $7,100,000 | 2024 | 8303-48; Aligning with bridge needs |
71 | Hwy 60 | Medium mill and overlay from .3 miles south of Jackson County Road 24 to .5 miles north of Jackson County Road 24 near Heron Lake | $1,590,000 | Not Selected | NA |
71 | Hwy 60 | Medium mill and overlay from Iowa Border to Nobles County Road 4 | $2,980,000 | Not Selected | NA |
71 | Hwy 60 | Thin mill and overlay eastbound from Cottonwood County Road 27 to Watonwan County Road 5 | $1,090,000 | Not Selected | NA |
71 | US59 | Thick overlay from 27th St north to Hwy 62 | $10,990,000 | Not Selected | NA |
70 | Hwy 15 | Medium mill and overlay from 1.2 miles south of Brown County Road 24 to Cottonwood St | $11,870,000 | Not Selected | NA |
69 | Hwy 15 | Medium mill and overlay from 4th St to Goemann Rd | $260,000 | Not Selected | NA |
68 | US Hwy 14 | Unbonded overlay eastbound lanes from 1 mile east of Hwy 111 to 520th St cul-de-sac. | $10,780,000 | Not Selected | NA |
67 | US Hwy 14 | Medium mill and overlay from Hwy 60 to eastern junction of Blue Earth County Road 37 at Smith's Mill | $3,190,000 | Not Selected | NA |
67 | US Hwy 169 | Medium mill and overlay from Faribault County Road 52 to .17 miles north of Faribault County Road 52 | $60,000 | Not Selected | NA |
66 | US Hwy 14 | Medium mill and overlay from Brown County Road 27 to Palmer Ave Roundabout in New Ulm | $4,910,000 | Not Selected | NA |
63 | Hwy 15 | Medium mill and overlay from Goemann Rd to Brown/Watonwan County line | $5,790,000 | Not Selected | NA |
62 | Hwy 60 | Resurface WB lanes between St. James and Butterfield | $2,700,000 | 2027 | 8308-115 |
61 | US59 | Minor CPR and diamond grinding from Prairie Dr to 27th St N in Worthington | $90,000 | Not Selected | NA |
58 | I90 | Thin mill and overlay from Rock River to Rock/Nobles County Line | $2,450,000 | Not Selected | NA |
58 | Hwy 22 | Resurface Hwy 22 from Mankato to St. Peter; replace 1 bridge and repair 3 bridges and construct 1 new bridge; construct roundabout at Le Sueur Co Hwy 21 and Hwy 22. | $37,148,889 | 2025, 2026, Future | 0714-35 |
54 | I90 | Medium mill and overlay westbound lanes from County Road 35/Minnesota Southern Railroad bridge to Rock/Nobles County Line | $6,510,000 | Not Selected | NA |
54 | Hwy 60 | Diamond grinding from Nobles County Road 24 near Heron Lake to Jackson County Road 47 near Brewster | $2,130,000 | Not Selected | Address this pavement with adjacent work |
53 | US Hwy 169 | Medium mill and overlay southbound lanes from Hwy 93 to Jackson County Road 5 | $9,660,000 | Not Selected | NA |
48 | US Hwy 169 | Medium mill and overlay from US Hwy 14 to Hwy 99 | $8,900,000 | Not Selected | NA |
45 | Hwy 60 | Minor CPR and Diamond Grinding from Alder St to Hwy 62 | $2,940,000 | Not Selected | NA |
44 | Hwy 60 | Unbonded overlay 0.7 miles east of Caldwell Drive near Windom to 0.6 miles east of Cottonwood CR 8 east of Mountain Lake | $18,820,000 | Not Selected | NA |
40 | US Hwy 14 | Thin mill and overlay from Palmer Ave to Garden St in New Ulm | $1,720,000 | Not Selected | NA |
35 | US Hwy 169 | Thin mill and overlay from Leland Parkway/Blue Earth County Road 16 to north of I-90 | $770,000 | Not Selected | NA |
34 | Hwy 22 | Reclaim and overlay from Blue Earth County Road 26 to South of Riverfront Dr (Blue Earth County Road 57) | $1,370,000 | Not Selected | NA |
34 | US Hwy 169 | Thin mill and overlay from .7 miles north of I-90 to 1 mile north of I-90 | $350,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay eastbound lanes from County Road 35/Hwy Southern Railroad Bridge to 1.1 miles east of Nobles County Road 13 | $4,510,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay southbound lanes from Hwy 5 to 1.25 miles west of the eastbound Blue Earth Rest area | $5,940,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay westbound lanes from Jackson County Road 5 bridge to Hwy 15 | $10,260,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay westbound lanes from Hwy 86 to Jackson County Road 5 bridge | $6,380,000 | Not Selected | NA |
33 | I90 | Minor CPR eastbound lanes from Jackson County Road 5 to Hwy 86 | $2,330,000 | Not Selected | NA |
29 | Hwy 23 | Thin mill and overlay from south I-90 ramps to Railroad Crossing in Jasper | $50,000 | Not Selected | NA |
29 | Hwy 60 | Hwy 60 from 1.2 miles west of Hwy 4 to .4 miles west of west Hwy 15 bridge | $16,220,000 | Not Selected | NA |
26 | Hwy 15 | Medium mill and overlay from Minnesota Prairie Line Railroad to Hwy 19 | $160,000 | Not Selected | NA |
25 | I90 | Medium mill and overlay eastbound lanes from Hwy 22 to west of Hwy 109 | $2,050,000 | Not Selected | NA |
25 | I90 | Medium mill and overlay westbound lanes from Hwy 109 to Hwy 22 | $2,050,000 | Not Selected | NA |
19 | Hwy 23 | Medium mill and overlay from Railroad Crossing to Rock/Pipestone County Line in Jasper | $8,810,000 | Not Selected | NA |
19 | US Hwy 169 | Thin mill and overlay from Iowa border to Faribault County Road 52 | $3,050,000 | Not Selected | NA |
18 | US Hwy 169 | Reconstruction from Hwy 99 to South Minnesota Avenue frontage Road in St. Peter | $3,260,000 | Not Selected | Addressing pavements with intersection reconfiguration as part of safety and mobility project |
15 | US Hwy 14 | Medium mill and overlay from Springfield City Limits to Railroad crossing on the east side of Sleepy Eye | $1,700,000 | Not Selected | NA |
15 | US Hwy 71 | Thin mill and overlay from 120th St (Sanborn City Limit) to US Hwy 14 | $350,000 | Not Selected | NA |
14 | Hwy 15 | Medium mill and overlay from Watonwan/Brown County Line to 1.2 miles south of Brown County Road 34 | $2,400,000 | Not Selected | NA |
14 | Hwy 60 | Medium mill and overlay from Caldwell Ave near Windom to east of Caldwell Ave | $100,000 | Not Selected | NA |
14 | Hwy 60 | Minor CPR and diamond grinding from Watonwan County Road 5 in Butterfield to 690th Lane | $50,000 | Not Selected | NA |
9 | US Hwy 169 | Thin mill and overlay from County Road 52 to 10th St in Blue Earth | $260,000 | Not Selected | NA |
View more detailed scores (Excel).
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
94 | I90 | Medium mill and overlay westbound lanes from 1.4 miles east of Hwy 60 to 1.4 miles east of Nobles County Road 13 | $6,060,000 | 2029 | |
94 | I90 | Major CPR and diamond grinding westbound lanes from Rock River to Rock County Road 4 near Beaver Creek | $8,130,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
94 | I90 | Medium mill and overlay eastbound lanes from Rock County Road 4 to Rock River | $4,580,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
93 | I90 | Thick overlay from 2 miles west of US 169 to Hwy 22 | $28,400,000 | 2026 | 2280-143 |
92 | I90 | Cold in place recycling and medium overlay westbound lanes from Jackson County Road 5 bridge to 1.54 miles east of Hwy 60 | $3,650,000 | 2029 | |
86 | US Hwy 14 | Major CPR and diamond grinding from west of Hwy 22 to .15 miles east of the eastern junction with Hwy 60 | $9,800,000 | 2026 | 0702-128 |
85 | US Hwy 169 | Major CPR and diamond grinding from Commerce St to Le Sueur County Road 28 in Le Sueur | $3,600,000 | 2030 | NA |
84 | I90 | Thick overlay from South Dakota Border to County Road 4 at Beaver Creek | $5,790,000 | 2022 | 6780-124 |
84 | I90 | Medium mill and overlay eastbound lanes from County Road 13 near Rushmore to 1 mile east of Hwy 60 | $5,400,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
83 | I90 | Cold in place recycling eastbound lanes from Hwy 4 to Hwy 15 | $4,900,000 | 2022 | 4680-132 |
83 | I90 | Medium mill and overlay westbound lanes from east of Nobles County Road 13 to Minnesota Southern Railroad Bridge | $3,670,000 | 2026 | 5380-154 |
83 | I90 | Medium mill and overlay westbound lanes from Hwy 15 to Hwy 4 | $7,320,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
83 | I90 | Medium mill and overlay westbound lanes from Hwy 60 to Jackson County Road 5 | $4,740,000 | 2029 | |
82 | US Hwy 169 | Medium mill and overlay northbound lanes from Le Sueur County Road 28 to Hwy 19 | $3,900,000 | Not Selected | |
82 | US Hwy 169 | Medium mill and overlay northbound lanes from Union St to Hwy 93 | $1,820,000 | Not Selected | |
82 | Hwy 60 | Cold in place recycling and medium overlay from north of I-90 to southwest of Nobles County Road 24 | $1,500,000 | 2029 | NA |
81 | US Hwy 169 | Unbonded overlay from west junction of Hwy 60/US Hwy 169 to north end of Minnesota River (North Star) Bridge | $19,880,000 | Not Selected | |
80 | US Hwy 14 | Unbonded overlay from west of Lookout Bridge to west of Hwy 22 | $19,540,000 | Not Selected | |
80 | US Hwy 14 | Medium mill and overlay from County Road 37 at Smith's Mill to Waseca County Road 2 overpass | $11,900,000 | Not Selected | NA |
80 | Hwy 60 | Medium mill and overlay from east of Laclaire St to 2 miles west of US Hwy 169 (Cray Corner) | $3,090,000 | 2030 | NA |
79 | Hwy 60 | Medium mill and overlay westbound lanes from County Road 47 to I-90 | $3,670,000 | Not Selected | NA |
79 | US Hwy 71 | Medium mill and overlay from Iowa Border to Riverside Dr in Jackson | $3,990,000 | 2030 | 3205-36 |
78 | Hwy 15 | Cold in place recycling and medium overlay from Cottonwood St to 20th St S in New Ulm | $870,000 | Not Selected | |
78 | Hwy 60 | Minor CPR and diamond grinding from west of Cottonwood County Road 47 to Watonwan County Road 5 near Butterfield. | $2,510,000 | Not Selected | |
78 | I90 | Cold in place recycling and medium overlay westbound lanes from Hwy 4 to 2.5 miles east of Hwy 86 | $9,750,000 | 2031 | NA |
78 | I90 | Cold in place recycling and medium overlay eastbound lanes from Hwy 86 to east of Hwy 4 | $10,500,000 | Not Selected | NA |
77 | Hwy 60 | Cold in place recycling and medium overlay eastbound lanes from Jackson County Road 24 to Alder St in Wilder | $2,430,000 | 2030 | NA |
77 | I90 | Medium mill and overlay eastbound lanes from Rock/Nobles County line to Nobles County Road 35/Minnesota Southern Railroad Bridge | $2,600,000 | Not Selected | NA |
76 | US Hwy 14 | Medium mill and overlay from 2 miles west of Hwy 111 to Lookout Dr | $8,140,000 | Not Selected | NA |
75 | US Hwy 14 | Rural reconstruction from Hwy 15 to 2 miles west of Hwy 111 | $39,800,000 | 2022 | Four-lane expansion project |
75 | Hwy 60 | Unbonded overlay westbound lanes from 1.6 miles east of Blue Earth County Road 109 to Hwy 15 bridge. | $14,800,000 | Not Selected | NA |
75 | Hwy 60 | Medium mill and overlay from 16th St to John Caldwell Dr/490th Ave | $5,120,000 | 2031 | Windom reconstruct |
74 | Hwy 60 | White top overlay westbound lanes from .4 miles east of Cottonwood County Road 47 to .3 miles west of Cottonwood County Road 47 near Mountain Lake | $480,000 | 2028 | NA |
74 | Hwy 60 | Reconstruction from Blue Earth County Road 20 to northeast of Laclaire St in Lake Crystal | $15,580,000 | 2024 | 0708-47 |
74 | Hwy 60 | Unbonded overlay from Blue Earth County Road 115 connecting with US Hwy 169 and extending north to the Minnesota River Bridge | $7,310,000 | Not Selected | NA |
74 | Hwy 60 | Medium mill and overlay from Nobles County Road 4 to north of I-90 | $12,400,000 | Not Selected | NA |
73 | US Hwy 14 | Medium mill and overlay from Waseca County Road 2 overpass to Steel County Line | $10,070,000 | Not Selected | NA |
73 | US Hwy 169 | Unbonded overlay from Minnesota River to US Hwy 14 | $8,680,000 | 2027 | 0713-81 |
73 | US Hwy 169 | Medium overlay from 1 mile north of I-90 to Hwy 109 in Winnebago | $4,280,000 | Not Selected | NA |
73 | US Hwy 169 | Medium mill and overlay from Blue Earth County Road 13 to Hwy 60 | $4,660,000 | Not Selected | NA |
73 | US Hwy 71 | Medium mill and overlay from Hwy 30 to 120th St (Sanborn City limits) | $6,140,000 | Not Selected | NA |
71 | US59 | Thick overlay from 27th St north to Hwy 62 | $10,990,000 | Not Selected | NA |
71 | Hwy 60 | Thin mill and overlay eastbound from Cottonwood County Road 27 to Watonwan County Road 5 | $1,090,000 | Not Selected | NA |
71 | Hwy 60 | Medium mill and overlay from .3 miles south of Jackson County Road 24 to .5 miles north of Jackson County Road 24 near Heron Lake | $1,590,000 | Not Selected | NA |
71 | Hwy 60 | Medium mill and overlay from Iowa Border to Nobles County Road 4 | $2,980,000 | Not Selected | NA |
70 | Hwy 15 | Medium mill and overlay from 1.2 miles south of Brown County Road 24 to Cottonwood St | $11,870,000 | Not Selected | NA |
70 | Hwy 22 | Reconstruction from Le Sueur County Road 102 to north end of Hwy River bridge | $7,880,000 | 2024 | 0714-35 |
69 | Hwy 15 | Medium mill and overlay from 4th St to Goemann Rd | $260,000 | Not Selected | NA |
68 | US Hwy 14 | Unbonded overlay eastbound lanes from 1 mile east of Hwy 111 to 520th St cul-de-sac. | $10,780,000 | Not Selected | NA |
67 | US Hwy 14 | Medium mill and overlay from Hwy 60 to eastern junction of Blue Earth County Road 37 at Smith's Mill | $3,190,000 | Not Selected | NA |
67 | US Hwy 169 | Medium mill and overlay from Faribault County Road 52 to .17 miles north of Faribault County Road 52 | $60,000 | Not Selected | NA |
66 | US Hwy 14 | Medium mill and overlay from Brown County Road 27 to Palmer Ave Roundabout in New Ulm | $4,910,000 | Not Selected | NA |
65 | US Hwy 169 | Thick overlay from Faribault County Road 12 to Blue Earth County Road 13 | $4,540,000 | 2022 | 0712-113; Concrete expected to deteriorate at the joints at an accelerated rate |
63 | Hwy 15 | Medium mill and overlay from Goemann Rd to Brown/Watonwan County line | $5,790,000 | Not Selected | NA |
62 | US Hwy 169 | Medium overlay from Hwy 30 to Blue Earth County Road 13 | $3,890,000 | 2022 | 0712-113; Concrete expected to deteriorate at the joints at an accelerated rate. Northern project limits are at southern city limits of Vernon Center |
62 | Hwy 60 | Unbonded overlay from Watonwan County Road 5 to 1.4 miles west of junction with Hwy 4 | $8,890,000 | 2028 | Westbound lanes only. |
61 | Hwy 15 | Cold in place recycling and medium overlay from Martin/Watonwan County line to 360th St | $2,900,000 | 2023 | 8303-48; Aligning with bridge needs |
61 | US59 | Minor CPR and diamond grinding from Prairie Dr to 27th St N in Worthington | $90,000 | Not Selected | NA |
61 | US Hwy 71 | Thick mill and overlay from Riverside Dr to Prospect St in Jackson | $580,000 | 2030 | 3205-36; Pairing with adjacent project |
60 | Hwy 22 | Reconstruction from Riverfront Dr to north end of Railroad Bridge | $3,350,000 | 2024 | 0714-35; Pairing with adjacent project |
58 | Hwy 22 | Unbonded overlay from US Hwy 14 to Blue Earth County Road 26 in Mankato | $4,830,000 | Not Selected | NA |
58 | US59 | Major CPR and diamond grinding from I-90 to Prairie Dr in Worthington | $420,000 | 2027 | NA |
58 | I90 | Thin mill and overlay from Rock River to Rock/Nobles County Line | $2,450,000 | Not Selected | NA |
54 | Hwy 60 | Diamond grinding from Nobles County Road 24 near Heron Lake to Jackson County Road 47 near Brewster | $2,130,000 | 2029 | Address this pavement with adjacent work |
54 | I90 | Medium mill and overlay westbound lanes from County Road 35/Minnesota Southern Railroad bridge to Rock/Nobles County Line | $6,510,000 | Not Selected | NA |
53 | US Hwy 169 | Medium mill and overlay southbound lanes from Hwy 93 to Jackson County Road 5 | $9,660,000 | Not Selected | NA |
76 | Hwy 15 | Unbonded overlay from west junction of Hwy 60 to east junction of Hwy 60 in Madelia | $17,460,000 | 2022 | 8304-118 |
48 | US Hwy 169 | Medium mill and overlay from US Hwy 14 to Hwy 99 | $8,900,000 | Not Selected | NA |
45 | Hwy 60 | Minor CPR and Diamond Grinding from Alder St to Hwy 62 | $2,940,000 | Not Selected | NA |
44 | Hwy 60 | Unbonded overlay 0.7 miles east of Caldwell Drive near Windom to 0.6 miles east of Cottonwood CR 8 east of Mountain Lake | $18,820,000 | Not Selected | NA |
42 | US Hwy 14 | Cold in place recycling and Medium overlay from US 71 to Springfield City limits | $4,640,000 | 2022 | NA |
40 | US Hwy 14 | Thin mill and overlay from Palmer Ave to Garden St in New Ulm | $1,720,000 | Not Selected | NA |
35 | US Hwy 169 | Thin mill and overlay from Leland Parkway/Blue Earth County Road 16 to north of I-90 | $770,000 | Not Selected | NA |
35 | Hwy 22 | Reconstruction from Railroad bridge to south of Blue Earth County Road 102 | $9,260,000 | 2022 | Project originally selected prior to project selection policy (in 2019-2022 STIP) Coordinating with another MnDOT project. |
34 | US Hwy 169 | Thin mill and overlay from .7 miles north of I-90 to 1 mile north of I-90 | $350,000 | Not Selected | NA |
34 | Hwy 22 | Reclaim and overlay from Blue Earth County Road 26 to South of Riverfront Dr (Blue Earth County Road 57) | $1,370,000 | 2024 | NA |
33 | I90 | Minor CPR eastbound lanes from Jackson County Road 5 to Hwy 86 | $2,330,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay southbound lanes from Hwy 5 to 1.25 miles west of the eastbound Blue Earth Rest area | $5,940,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay westbound lanes from Jackson County Road 5 bridge to Hwy 15 | $10,260,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay westbound lanes from Hwy 86 to Jackson County Road 5 bridge | $6,380,000 | Not Selected | NA |
33 | I90 | Medium mill and overlay eastbound lanes from County Road 35/Hwy Southern Railroad Bridge to 1.1 miles east of Nobles County Road 13 | $4,510,000 | Not Selected | NA |
29 | Hwy 23 | Thin mill and overlay from south I-90 ramps to Railroad Crossing in Jasper | $50,000 | Not Selected | NA |
29 | Hwy 60 | Hwy 60 from 1.2 miles west of Hwy 4 to .4 miles west of west Hwy 15 bridge | $16,220,000 | Not Selected | NA |
26 | Hwy 15 | Medium mill and overlay from Minnesota Prairie Line Railroad to Hwy 19 | $160,000 | Not Selected | NA |
25 | I90 | Medium mill and overlay eastbound lanes from Hwy 22 to west of Hwy 109 | $2,050,000 | Not Selected | NA |
25 | I90 | Medium mill and overlay westbound lanes from Hwy 109 to Hwy 22 | $2,050,000 | Not Selected | NA |
19 | US Hwy 169 | Thin mill and overlay from Iowa border to Faribault County Road 52 | $3,050,000 | Not Selected | NA |
19 | Hwy 23 | Medium mill and overlay from Railroad Crossing to Rock/Pipestone County Line in Jasper | $8,810,000 | Not Selected | NA |
18 | US Hwy 169 | Reconstruction from Hwy 99 to South Minnesota Avenue frontage Road in St. Peter | $3,260,000 | 2023 | Addressing pavements with intersection reconfiguration as part of safety and mobility project |
15 | US Hwy 14 | Medium mill and overlay from Springfield City Limits to Railroad crossing on the east side of Sleepy Eye | $1,700,000 | Not Selected | NA |
15 | US Hwy 71 | Thin mill and overlay from 120th St (Sanborn City Limit) to US Hwy 14 | $350,000 | Not Selected | NA |
14 | Hwy 15 | Medium mill and overlay from Watonwan/Brown County Line to 1.2 miles south of Brown County Road 34 | $2,400,000 | Not Selected | NA |
14 | Hwy 60 | Minor CPR and diamond grinding from Watonwan County Road 5 in Butterfield to 690th Lane | $50,000 | Not Selected | NA |
14 | Hwy 60 | Medium mill and overlay from Caldwell Ave near Windom to east of Caldwell Ave | $100,000 | Not Selected | NA |
9 | US Hwy 169 | Thin mill and overlay from County Road 52 to 10th St in Blue Earth | $260,000 | Not Selected | NA |
View more detailed scores (Excel).
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
94 | I90 | Concrete overlay westbound lanes from Railroad/Rock County Road 4 at Beaver Creek to Rock River | $5,800,000 | 2021 | |
94 | I90 | Medium mill and overlay eastbound lanes from Railroad/Rock Count Road 4 at Beaver Creek to Rock River | $4,800,000 | 2030 | |
93 | I90 | Thick overlay from 2 miles east of Hwy 169 to Hwy 22 | $24,000,000 | 2025 | |
93 | I90 | Medium mill and overlay from east of Hwy 4 to Hwy 15 | $6,500,000 | 2022 | |
92 | I90 | Medium mill and overlay from Jackson County Road 5 Bridge to 1.4 miles east of Hwy 60 | $5,300,000 | 2029 | |
90 | US 169 | Concrete pavement repair from Hwy 93 to north of rest area access in Le Sueur | $4,000,000 | 2030 | |
90 | Hwy 60 | Concrete pavement repair and overlay from I-90 to Jackson County Hwy 24 | $27,600,000 | 2029 | |
88 | Hwy 60 | Reconstruction from 0.4 miles west of Blue Earth County Road 20 to Laclaire St in Lake Crystal | $6,800,000 | 2024 | |
88 | I90 | Medium mill and overlay eastbound lanes from east of Hwy 4 to 2.5 miles east of Hwy 86 | $10,000,000 | 2030 | |
87 | I90 | Mill and overlay eastbound lanes from Rock/Nobles county line to Nobles County Road 35 | $8,500,000 | 2029 | |
86 | US 14 | Minor resurfacing from 2 miles west of Hwy 111 to east of Lookout Dr | $3,500,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance. |
85 | US 14 | Minor resurfacing from Blue Earth County road 37 to Waseca County Road 2 overpass | $5,100,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance. |
84 | I90 | Resurfacing westbound lanes from Rock County Road 35 to Rock/Nobles County Line | $11,100,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance. |
84 | I90 | Medium overlay westbound lanes from Hwy 60 to Cottonwood County Road 13 | $5,900,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance. |
83 | I90 | Thick overlay from South Dakota State Line to Rock County Road 4 at Beaver Creek | $4,500,000 | 2028 | Project originally selected prior to project selection policy. (In 2019-2022 STIP) |
83 | I90 | Mill and overlay westbound lanes from east of Nobles County Road 13 to bridge over Nobles County Road 35 | $6,500,000 | 2026 | Project originally selected prior to project selection policy. |
83 | I90 | Medium overlay westbound lanes from Hwy 15 to Hwy 14 | $7,100,000 | Not Selected | |
83 | I90 | Medium mill and overlay eastbound lanes from Rock River to Rock/Nobles County Line | $8,500,000 | 2029 | |
81 | Hwy 60 | Unbonded overlay from Blue Earth County Road 114 to north end of Minnesota River Bridge | $25,800,000 | Not Selected | Spacing large Mankato-North Mankato area projects between years |
80 | US 14 | Unbonded overlay from west of Lookout Dr Bridge to Hwy 22 | $19,600,000 | Not Selected | Spacing large Mankato-North Mankato area projects between years |
80 | US 14 | Concrete pavement repair from Hwy 22 to east junction Hwy 60 | $5,800,000 | 2027 | Project originally selected prior to project selection policy (in 2019-2028 CHIP). |
80 | US 14 | Medium mill and overlay from Hwy 71 to Springfield City Limits | $5,300,000 | 2022 | Project originally selected prior to project selection policy in 2019-2022 STIP). |
80 | Hwy 60 | Mill and overlay from east of Laclaire st to 2 miles west of Hwy 169 | $6,900,000 | 2030 | |
79 | US 169 | Medium mill and overlay from Iowa/Minnesota border to Blue Earth County Road 52 | $5,100,000 | 2022 | Project originally selected prior to project selection policy in 2019-2022 STIP). |
79 | Hwy 15 | Medium overlay from Cottonwood St to 12th St South in New Ulm | $900,000 | Not Selected | |
79 | US 71 | Medium mill and overlay from Iowa/Minnesota border to Riverside Dr in Jackson | $6,500,000 | 2028 | Project originally selected prior to project selection policy (in 2019-2028 CHIP). |
78 | US 14 | Minor resurfacing from Waseca County Road 2 overpass to Waseca/Steele County Line | $4,200,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance. |
78 | Hwy 60 | Concrete pavement repair and overlay westbound lanes from Nobles County road 47 near Brewster to north of I-90 | $6,100,000 | 2029 | |
78 | I90 | Medium mill and overlay westbound lanes from Hwy 4 to Hwy 86 | $10,000,000 | 2030 | |
77 | Hwy 60 | Unbonded overlay from Watonwan County Road 5 near Butterfield to 1.2 miles west of Hwy 4 | $10,300,000 | 2028 | Project originally selected prior to project selection policy (in 2019-2028 CHIP) |
76 | Hwy 60 | Unbonded overlay eastbound lanes from east of Hwy 15 to Blue Earth County Road 20 | $3,100,000 | 2021 | Project originally selected prior to project selection policy (in 2019-2022 STIP). |
75 | US 71 | Mill and overlay from I-90 to north of Jackson County Road 24 | $800,000 | Not Selected | |
74 | US 169 | Concrete pavement repair and overlay from northern limits of Winnebago to southern limits of Vernon Center | $4,000,000 | 2022 | Project originally selected prior to project selection policy (in 2019-2022 STIP). |
74 | US 14 | Reconstruction from eastern junction of Hwy 15 to 2 miles west of Hwy 111 | $74,000,000 | 2022 | Part of Hwy 14 expansion project |
74 | Hwy 60 | Resurfacing from Cottonwood County Road 47 to .4 miles east of Cottonwood County Road 47 | $400,000 | Not Selected | Shoulder paving and dip correction. No alterations are planned to the driving lanes. |
74 | Hwy 60 | Major resurfacing eastbound lanes from SW of Jackson County Road 24 south of Heron Lake to north of County Road 24 north of Heron Lake; westbound lanes from Willder to Jackson County Road 24. | $9,400,000 | 2029 | Coordinating with another MnDOT project. |
74 | Hwy 60 | Minor resurfacing from Iowa border to north of Nobles County Road 4 in Bigelow | $1,200,000 | Not Selected | |
73 | US 169 | Unbonded overlay from north end of Minnesota River bridge to Lake St | $9,300,000 | 2027 | Project originally selected prior to project selection policy (in 2019-2028 CHIP); Coordinating with another MnDOT project. |
73 | Hwy 60 | Minor resurfacing from north of Nobles County Road 4 in Bigelow to north of I-90 | $3,600,000 | Not Selected | |
73 | US 71 | Thick overlay from Hwy 30 to 120th St in Sanborn | $5,000,000 | Not Selected | |
71 | US 14 | Minor resurfacing from Hwy 60 to Blue Earth County Road 37 near Smith's Mill | $1,400,000 | Not Selected | |
71 | US 14 | Reconstruction from German St to East junction of Hwy 15 | $2,600,000 | Not Selected | Received a new wearing course in 2018 |
71 | Hwy 15 | Concrete pavement replacement from southern junction of Hwy 60 to northern junction Hwy 60 at Madelia | $18,100,000 | 2022 | Project originally selected prior to project selection policy. (In 2019-2022 STIP) |
71 | Hwy 15 | Medium mill and overlay from Martin/Watonwan County line to north of 360th St | $5,900,000 | 2023 | |
71 | Hwy 60 | Thin mill and overlay eastbound lanes from .69 miles east of Watonwan County 27 to Watonwan County Road 5 near Butterfield | $1,200,000 | Not Selected | Shoulder paving and dip correction near Mountain Lake. No alterations are planned to the driving lanes. |
70 | US 169 | Concrete repair from Blue Earth County road 13 to Hwy 60 | $2,300,000 | Not Selected | |
70 | Hwy 15 | Medium overlay from 1.2 miles south of Brown County road 24 to Cottonwood St in New Ulm | $5,300,000 | Not Selected | |
70 | US 59 | Thick overlay from 27th St in Worthington to Hwy 62 in Fulda | $16,900,000 | 2029 | Project originally selected prior to project selection policy (in 2019-2028 CHIP); Coordinating with another MnDOT project. |
69 | Hwy 23 | Mill and overlay from Railroad Crossing to Rock/Pipestone County Line in Jasper | $4,500,000 | Not Selected | |
69 | Hwy 60 | Unbonded overlay from Caldwell Drive to east of Cottonwood County Road 8 east of Mountain Lake | $12,600,000 | Not Selected | |
68 | US 14 | Unbonded overlay eastbound lanes from Hwy 111 to 510th St cul-de-sac | $10,800,000 | Not Selected | |
68 | US 14 | Medium overlay from Railroad Crossing to 8th Ave in Sleepy Eye | $200,000 | Not Selected | |
68 | Hwy 15 | Mill and overlay from I-90 to north of Goemann Rd | $300,000 | Not Selected | |
68 | Hwy 22 | Reconstruction from Le Sueur County Road 102 to Minnesota River Bridge | $3,000,000 | 2024 | Project originally selected prior to project selection policy (in 2019-2028 CHIP); Coordinating with another MnDOT project. |
68 | US 59 | Thick overlay from I-90 to Prairie Dr | $400,000 | 2029 | Project originally selected prior to project selection policy (in 2019-2028 CHIP); Coordinating with another MnDOT project. |
67 | US 169 | Mill and overlay from Faribault County road 52 to .17 miles north of Faribault County Road 52 in Blue Earth | $100,000 | 2022 | Completing as part of the Elmore to Blue Earth project. |
67 | US 14 | Medium mill and overlay from west of the CP overpass to west of the western junction of Brown County Road 7 near Cobden | $400,000 | Not Selected | |
67 | Hwy 22 | Medium Mill and overlay from Minnesota River Bridge to Hwy 169 | $100,000 | Not Selected | |
66 | US 14 | Mill and overlay from north of County Road 27 to Palmer Ave Roundabout | $2,600,000 | Not Selected | |
65 | US 71 | Mill and overlay from Prospect St to I-90 in Jackson | $400,000 | Not Selected | |
63 | US 169 | Medium overlay from 1 mile north of I-90 to Hwy 109 in Winnebago | $2,200,000 | Not Selected | |
63 | Hwy 15 | Medium overlay from north of Goemann Rd to Brown/Wantonwan county line | $2,800,000 | Not Selected | |
63 | Hwy 15 | Medium overlay from Brown/Watonwan County line to 1.2 miles south of Brown County Road 24 near Searles | $1,800,000 | Not Selected | |
62 | US 59 | Thick overlay from Prairie Dr to 27th St in Worthington | $100,000 | 2029 | Project originally selected prior to project selection policy (in 2019-2028 CHIP); Coordinating with another MnDOT project. |
61 | US 71 | Mill and overlay from Riverside Dr to Prospect St in Jackson | $500,000 | 2028 | Completing as part of the Iowa to I-90 US 71 project. |
59 | US 169 | Medium mill and overlay from Hwy 30 to Blue Earth County Road 13 near Garden City | $2,100,000 | 2022 | Project originally selected prior to project selection policy. (In 2019-2022 STIP) Secton from Amboy to Vernon Center will be completed in 2022 |
59 | US 169 | Thin mill and overlay southbound lanes from north of Hwy 93 to Union St In St. Peter | $3,200,000 | Not Selected | |
59 | US 169 | Medium overlay from north of Faribault County Road 52 to 10th st in Blue Earth | $200,000 | Not Selected | |
58 | US 169 | Resurfacing from north of Hwy 14 to south of Hwy 99 | $2,900,000 | Not Selected | |
58 | Hwy 22 | Reconstruction from Railroad bridge to Le Sueur County Road 102 | $4,900,000 | 2024 | Project originally selected prior to project selection policy; Coordinating with another MnDOT project. |
58 | I90 | Resurface eastbound lanes from Jackson County Road 5 bridge to Hwy 86 | $11,300,000 | 2021 | Project originally selected prior to project selection policy (in 2019-2022 STIP) |
57 | Hwy 22 | Reclaim and overlay from Blue Earth County Road 26 to Riverfront Dr | $1,500,000 | Not Selected | |
57 | Hwy 22 | Reconstruction from Riverfront Dr to North end of Railroad bridge | $1,800,000 | 2024 | Project originally selected prior to project selection policy (in 2019-2028 CHIP); Coordinating with another MnDOT project. |
56 | Hwy 15 | Mill and overlay from Prairie Line Railroad to Hwy 19 | $500,000 | Not Selected | |
56 | Hwy 22 | Unbonded overlay from Hwy 14 to Blue Earth County Road 12 | $5,000,000 | Not Selected | |
54 | I90 | Unbonded overlay eastbound lanes from Cottonwood County Road 13 to Hwy 60 | $18,400,000 | Not Selected | |
53 | US 169 | Unbonded overlay from Union St in St. Peter to Hwy 93 | $22,900,000 | Not Selected | |
53 | I90 | Unbonded overlay from Hwy 60 to Jackson County Road 5 bridge | $16,100,000 | Not Selected | |
52 | US 169 | Unbonded overlay from Le Sueur County road 28 to Hwy 19 | $13,300,000 | Not Selected | |
52 | I90 | Resurface westbound lanes from west of Hwy 109 to Hwy 22 | $1,600,000 | Not Selected | |
52 | I90 | Resurface eastbound lanes from Hwy 22 to west of Hwy 109 | $1,600,000 | Not Selected | |
48 | Hwy 60 | Resurface westbound lanes from Jackson County Road 24 to .5 miles north of Brewster | $900,000 | 2029 | Coordinating with another MnDOT project. |
48 | Hwy 60 | Resurface westbound lanes from Watonwan County Road 5 to Cottonwood County Road 47 | $2,600,000 | Not Selected | |
46 | US 71 | Medium overlay from Jackson County Road 34 to Hwy 60 | $4,200,000 | Not Selected | |
45 | Hwy 60 | Resurfacing from Alder St in Wilder to 7th st in Windom | $3,000,000 | Not Selected | |
42 | Hwy 60 | Medium overlay eastbound lanes from Jackson County Road 24 to Alder St in Wilder | $2,400,000 | 2029 | Combining with another MnDOT project. |
40 | US 169 | Thin mill and overlay from Leland Pkwy in Blue Earth to I-90 | $800,000 | Not Selected | |
40 | US 14 | Thin mill and overlay from the Palmer Ave roundabout to Garden st in New Ulm | $1,800,000 | Not Selected | |
40 | US 71 | Thin mill and overlay from Sanborn City limits to Hwy 14 | $200,000 | Not Selected | |
36 | Hwy 60 | Thick overlay from 16th St to John Caldwell Dr/490th Ave | $2,000,000 | Not Selected | |
34 | US 169 | Thin mill and overlay from.7 miles north of I-90 to 1 mile north of I-90 | $400,000 | Not Selected | |
33 | I90 | Unbonded overlay westbound lanes from Hwy 86 to Jackson County Road 5 bridge | $21,600,000 | Not Selected | |
33 | I90 | Unbonded overlay westbound lanes from 2.1 miles east of Faribault County Road 5 Bridge | $27,300,000 | Not Selected | |
33 | I90 | Reconstruction eastbound lanes from Nobles county road 35 to Nobles county road 13 | $7,700,000 | Not Selected | |
30 | Hwy 60 | Unbonded overlay westbound lanes from east of Hwy 15 to Blue Earth County Road 20 | $10,800,000 | Not Selected | |
29 | Hwy 23 | Thin mill and overlay from Railroad crossing south of Jasper to Hwy 269 | $100,000 | Not Selected | |
29 | Hwy 60 | Unbonded overlay from 1.2 miles west of Hwy 4 to Hwy 15 bridge | $54,100,000 | Not Selected | |
23 | Hwy 60 | Reconstruction from John Caldwell Dr in Windom to 1.7 miles west of Cottonwood Count Road 9 near Mountain Lake | $18,800,000 | Not Selected | |
18 | US 169 | Reconstruction from Hwy 99 to Minnesota Ave/Frontage road in St. Peter | $2,600,000 | 2023 | Coordinating with another MnDOT HSIP project. |
16 | US 14 | Mill and overlay from Springfield City limits to Railroad Crossing near Sleepy eye | $2,900,000 | Not Selected | |
14 | Hwy 60 | Reconstruction from John Caldwell Dr in Windom to 1.7 miles west of Cottonwood Count Road 9 near Mountain Lake | $100,000 | 2028 | Small segment coordinating with larger westbound lanes project. |
9 | Hwy 15 | Chip seal from east junction Hwy 14 to .6 miles north of Hwy 14 | $200,000 | Not Selected | |
8 | Hwy 15 | Mill and overlay from Hwy 60 to Brown County Line | $3,200,000 | 2022 | Project originally selected prior to project selection policy (in 2019-2022 STIP) |
View more detailed scores (Excel).
Score | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
98 | US169 | Medium mill and overlay from Minnesota River to north of Highway 14 | $5,700,000 | 2027 | |
96 | US169 | Unbonded overlay from Blue Earth County Road 115 combining with Highway 169, and extending to the Riverfront Drive bridge | $26,500,000 | 2029 | NA |
94 | I-90 | Major concrete rehabilitation from South Dakota border to Rock River | $11,400,000 | 2022 | NA |
93 | I-90 | Medium overlay eastbound from east of Highway 4 to Highway 15 | $5,400,000 | 2022 | NA |
93 | I-90 | Medium overlay eastbound from the Rock River to Rock/Nobles county line | $3,600,000 | 2029 | NA |
92 | I-90 | Medium overlay westbound lanes from Jackson Couty Road 5 bridge to Highway 60 | $4,000,000 | 2029 | NA |
90 | MN15/MN60 | Unbonded overlay from western junction of Highway 60 to eastern junction of Highway 60 in Madelia | $16,000,000 | 2024 | NA |
89 | US14 | Thick mill and overlay Highway 15 to west of Highway 111 | $12,000,000 | 2021 | NA |
89 | MN60 | Medium mill and overlay eastbound lanes from east of Highway 15 bridge to east of Blue Earth County Road 109 | $3,200,000 | 2022 | NA |
89 | MN60 | Unbonded overlay from Laclaire Street to Blue Earth County Road 115 west of Highway 169 intersection (Cray Corner) | $11,000,000 | 2029 | Coordinated with adjacent Highway 169 segment into Mankato |
89 | MN60 | Major concrete repair eastbound lanes from I-90 to Jackson County Road 24 | $7,500,000 | 2029 | NA |
88 | MN60 | Medium mill and overlay westbound lanes from Nobles County Road 47 to north of I-90 | $6,300,000 | 2029 | NA |
87 | I-90 | Medium overlay eastbound lanes from Rock/Nobles county line to Nobles County Road 35 | $2,700,000 | 2029 | NA |
87 | US169 | Minor concrete rehabilitation from Highway 14 to Highway 99 | $3,800,000 | Not Selected | Will continue to monitor for an increased rate of deterioration of the pavement |
85 | US14 | Unbonded overlay from Lookout Bridge to Highway 22 | $20,000,000 | Not Selected | Project is being developed for potential future funding, which may include bridge and interchange improvements |
85 | US14 | Minor concrete rehabilitation from 2 miles west of Highway 111 to Lookout Drive | $2,500,000 | Not Selected | Will continue to monitor for an increased rate of deterioration of the pavement |
83 | I-90 | Medium overlay eastbound lanes from Rock County Highway 4 to the Rock River | $3,500,000 | 2022 | |
83 | I-90 | Medium overlay westbound lanes from railroad bridge near Rushmore to Nobles County Road 35 | $3,700,000 | 2025 | Aligns with Nobles County bridge projects |
83 | I-90 | Medium overlay westbound lanes from east of Highway 60 to east of Nobles County Road 13 | $5,900,000 | Not Selected | Waiting to coordinate with another project. |
83 | I-90 | Medium overlay westbound lanes from Highway 15 to east of Highway 4 | $7,100,000 | Not Selected | Waiting to coordinate with another project. |
83 | I-90 | Thick overlay westbound lanes from the Rock/Nobles County line to the Rock River | $6,100,000 | Not Selected | Waiting to coordinate with another project. |
83 | MN60 | Unbonded overlay from west of Cottonwood County Road 47 to Watonwan County Road 5 near Butterfield | $17,500,000 | Not Selected | Waiting to coordinate with another project. Already extensive work on Highway 60 planned in the southwest portion of the district |
82 | US14 | Minor concrete rehabilitation from Blue Earth County Road 37 at Smith's Mill to Waseca County Road 2 overpass | $5,000,000 | Not Selected | Waiting to coordinate with another project. Can potentially be fixed through an IDIQ contract |
81 | US14 | Medium overlay from Highway 71 to east Springfield city limits | $5,900,000 | 2022 | |
81 | US71 | Medium overlay from Iowa border to Riverside Drive in Jackson | $4,300,000 | 2028 | |
80 | US169 | Thick mill and overlay from Ramsey Street to Union Street in St. Peter | $600,000 | 2022 | |
80 | US14 | Major concrete rehabilitation from Highway 22 to Highway 60 | $10,700,000 | 2026 | |
80 | MN60 | Major concrete rehabilitation eastbound and westbound lanes of the Heron Lake bypass and westbound lanes between Alder Street in Wilder and the Heron Lake bypass. | $9,700,000 | 2029 | |
80 | MN60 | Minor concrete rehabilitation from Nobles County Road 4 to I-90 | $2,100,000 | Not Selected | District anticipates pavement conditions will not deteriorate as fast as the model predicts |
79 | US169 | Medium overlay Iowa border to Faribault County Road 52 | $7,100,000 | 2023 | |
79 | MN60 | Major Concrete rehabilitation westbound lanes from Jackson County Road 24 to Nobles County Road 47 | $7,200,000 | 2029 | |
78 | US71 | Thin mill and overlay from Highway 60 to Highway 30 | $2,900,000 | 2020 | |
78 | I-90 | Unbonded overlay eastbound lanes from Jackson County Road 5 bridge to Highway 86 | $14,000,000 | 2021 | |
78 | MN60 | Medium mill and overlay from Blue Earth County Road 20 to Laclaire Street | $3,500,000 | 2024 | |
78 | I-90 | Medium overlay eastbound lanes from Highway 86 to Highway 4 | $11,000,000 | Not Selected | District anticipates pavement conditions will not deteriorate as fast as the model predicts |
77 | US169 | Major concrete rehabilitation from Winnebago to Vernon Center | $15,000,000 | 2027 | |
77 | I-90 | Major concrete rehabilitation Jackson County Road 35/Minnesota Southern railroad bridge to Rock/Nobles County line | $4,800,000 | Not Selected | Waiting to coordinate with another project--potentially with another I-90 project in 2025 |
77 | MN22 | Thick overlay from south ramps of Highway 14 to Blue Earth County Road 26 | $2,900,000 | Not Selected | Waiting to coordinate with a larger Highway 22 project in Mankato |
76 | US14 | Minor concrete rehabilitation from Waseca County Road 2 overpass to Steele County line | $6,000,000 | Not Selected | Removed from CHIP due to projects with higher scores and this project could be potentially addressed with an IDIQ contract |
76 | MN60 | Major concrete rehabilitation from Alder Street to Highway 62 | $17,000,000 | Not Selected | Already extensive work on Highway 60 in the southwest portion of the district, and adjacent to future Windom project |
76 | US169 | Medium mill and overlay from Leland Parkway to I-90 | $1,600,000 | Not Selected | Waiting to Coordinate with pavement work in Blue Earth County |
75 | US71 | Medium overlay from 120th Street (Sanborn north city limits) to Highway 14 | $600,000 | Not Selected | Small segment that should be wrapped up into larger adjacent projects. Coordinating with District 8. |
75 | US169 | Unbonded overlay from Commerce Street (former Highway 112) to Nicollet County Road 28 | $5,800,000 | Not Selected | District anticipates pavement conditions will not deteriorate as fast as the model predicts |
74 | MN60 | Unbonded overlay from Watonwan County Road 5 near Butterfield to Highway 4 | $8,400,000 | 2028 | Selected prior to policy (In 2019-2028 CHIP) |
74 | US14 | Medium mill and overlay from Palmer Avenue roundabout to Garden Street in New Ulm | $2,800,000 | Not Selected | |
74 | MN60 | Minor Concrete rehabilitation from Iowa border to Nobles County Road 4 | $700,000 | Not Selected | |
73 | US71 | Medium mill and overlay from I-90 to Jackson County Road 34 | $500,000 | 2020 | Selected prior to policy (In 2019-2022 STIP) |
73 | MN60 | Unbonded overlay westbound lanes from 0.4 miles east of Cottonwood County Road 47 to 0.3 miles west of Cottonwood County Road 47 west of Mountain Lake | $1,100,000 | 2023 | Selected prior to policy (In 2019-2022 STIP) |
73 | MN22 | Reconstruction from Riverfront Drive to north end of railroad bridge | $4,900,000 | 2024 | Selected prior to policy (In 2019-2028 CHIP) |
73 | MN60 | Unbonded overlay eastbound lanes from Jackson County Road 24 to Alder Street in Wilder | $8,600,000 | 2029 | Project previously identified in the 2019-2028 CHIP and aligns with higher-scoring Highway 60 project between Heron Lake and Worthington. |
73 | US169 | Major concrete rehabilitation from Blue Earth County 13 to Highway 60 | $8,400,000 | Not Selected | |
72 | US71 | Thick overlay from Highway 30 to 120th Street (Sanborn north city limits) | $10,000,000 | Not Selected | |
72 | US14 | Minor concrete rehabilitation from Highway 60 eastern junction to Blue Earth County Road 37 at Smith's Mill | $1,400,000 | Not Selected | |
72 | MN22 | Medium mill and overlay Blue Earth County Road 26 to Riverfront Drive | $1,300,000 | Not Selected | Project previously identified in the 2019-2028 CHIP, but was removed to align with a future Highway 22 project in Mankato |
71 | US59 | Thick overlay from 27th Street N to Highway 62 | $12,000,000 | 2027 | Selected prior to policy (In 2020-2029 CHIP) |
71 | US71 | Medium mill and overlay from Riverside Drive to Prospect Street in Jackson | $500,000 | Not Selected | |
70 | US71 | Medium overlay from Jackson County Road 34 to Highway 60 | $5,800,000 | 2020 | Selected prior to policy (In 2019-2022 STIP) |
70 | US169 | Medium mill and overlay from 0.7 miles north of I-90 to 1 mile north of I-90 | $600,000 | Not Selected | |
69 | MN60 | Thin mill and overlay eastbound lanes from Watonwan County Road 5 to 690th Lane | $1,700,000 | Not Selected | |
68 | MN15 | Medium mill and overlay from Highway 60 to Brown/Watonwan County line | $1,300,000 | 2023 | Selected prior to policy (In 2019-2022 STIP). |
68 | MN22 | Reconstruction from Le Sueur County Road 102 to north end of the Minnesota River bridge | $7,600,000 | 2024 | Selected prior to policy (In 2019-2028 CHIP) |
68 | MN15 | Medium mill and overlay from 4th Street to Goemann Road | $400,000 | Not Selected | |
68 | MN60 | Thin mill and overlay eastbound lanes from Watonwan County Road 27 to Watonwan County Road 5 in Butterfield | $1,500,000 | Not Selected | |
67 | MN15 | Medium mill and overlay from east Highway 60 interchange to 1 mile north of Highway 60 | $500,000 | 2023 | Selected prior to policy (In 2019-2022 STIP), coordinating with another project |
67 | MN15 | Thin overlay from northeast of Highway 14 to Minnesota Prairie Line railroad west of Winthrop | $3,300,000 | Not Selected | |
67 | MN22 | Medium mill and overlay from the north end of the Minnesota River bridge to Highway 169 in St. Peter | $300,000 | Not Selected | |
66 | US59 | Major concrete pavement repair/diamond grinding from I-90 to north of Prairie Drive in Worthington | $400,000 | 2027 | Selected prior to policy (In 2019-2028 CHIP) |
66 | US59 | Major concrete pavement repair/diamond grinding from north of Prairie Drive to 27th Street N in Worthington | $400,000 | 2027 | Selected prior to policy (In 2019-2028 CHIP) |
65 | US14 | Medium mill and overlay from northeast of Brown County Road 27 to east of the Palmer Avenue roundabout in New Ulm | $5,100,000 | Not Selected | NA |
64 | MN15 | Medium overlay from Brown County Road 24 to Cottonwood Street in New Ulm | $3,000,000 | Not Selected | NA |
64 | MN23 | Medium mill and overlay from railroad crossing to Rock/Pipestone county line in Jasper | $100,000 | Not Selected | NA |
63 | MN15 | Medium mill and overlay from Goemann Road to Watonwan county line | $22,000,000 | Not Selected | NA |
63 | MN15 | Medium overlay from Watonwan/Brown County line to Brown County Road 24 | $3,500,000 | Not Selected | NA |
62 | MN15 | Medium overlay from Martin/Watonwan County line to north of 360th Street | $3,200,000 | 2023 | Selected prior to policy (In 2019-2028 CHIP) |
60 | US14 | Medium mill and overlay from 7th Avenue NE to northeast of Brown County Road 27 | $400,000 | Not Selected | NA |
59 | MN22 | Reconstruction from north end of railroad bridge to south of Le Sueur County Road 102 | $15,000,000 | 2024 | Selected prior to policy (In 2019-2028 CHIP) |
59 | US169 | Medium mill and overlay from Faribault County Road 52 to 10th Street in Blue Earth | $500,000 | Not Selected | |
58 | I-90 | Medium overlay from west of Highway 169 to Highway 22 | $20,000,000 | 2028 | Selected prior to policy (In 2019-2028 CHIP) |
58 | I-90 | Minor concrete rehabilitation westbound lanes from Highway 86 to Jackson County Road 5 bridge | $2,700,000 | Not Selected | NA |
57 | US14 | Medium mill and overlay from west of the CP railroad overpass to western junction with Brown County Road 7 | $700,000 | Not Selected | NA |
57 | US14 | Medium mill and overlay from the railroad crossing to 8th Avenue SW in Sleepy Eye | $300,000 | Not Selected | NA |
56 | MN15 | Thick mill and overlay from Minnesota Prairie Line railroad to Highway 19 | $200,000 | 2023 | Selected prior to policy (In 2019-2022 STIP) |
53 | I-90 | Unbonded overlay eastbound lanes from east of Nobles County Road 13 near Rushmore to Highway 60 | $18,000,000 | Not Selected | NA |
53 | I-90 | Unbonded overlay eastbound lanes from Highway 60 to Jackson County Road 5 bridge in Jackson County | $16,000,000 | Not Selected | NA |
53 | US169 | Unbonded overlay southbound lanes from north Highway 93 intersection to Union Street in St. Peter | $19,000,000 | Not Selected | NA |
53 | US169 | Minor concrete rehabilitation from north Highway 93 intersection to Commerce Street (former Highway 112) in Le Sueur | $500,000 | Not Selected | NA |
52 | I-90 | Minor concrete rehabilitation westbound lanes from west of Highway 109 to Highway 22 | $1,600,000 | Not Selected | NA |
52 | I-90 | Minor concrete rehabilitation eastbound lanes from Highway 22 to west of Highway 109 | $1,600,000 | Not Selected | NA |
52 | US169 | Unbonded overlay from southwest of Le Sueur County Road 28 to Highway 19 | $13,300,000 | Not Selected | NA |
48 | I-90 | Unbonded overlay from westbound lanes from east of Highway 4 to east of Highway 86 | $36,000,000 | Not Selected | NA |
44 | MN23 | Minor concrete pavement repair from south I-90 ramps to railroad crossing in Jasper | $3,700,000 | Not Selected | NA |
42 | US14 | Minor concrete rehabilitation from east Springfield city limits to railroad crossing on the west side of Sleepy Eye | $2,400,000 | Not Selected | NA |
33 | I-90 | Major concrete rehabilitation eastbound lanes from Nobles County Road 35/Minnesota Southern railroad bridge to east of Nobles County Road 13 near Rushmore | $7,800,000 | Not Selected | NA |
29 | MN60 | Unbonded overlay Eastbound lanes from Blue Earth County 109 to Highway 15 bridge | $11,000,000 | 2022 | Selected prior to policy (In 2019-2022 STIP) |
25 | MN60 | Unbonded overlay from Highway 4 to Highway 15 bridge | $22,000,000 | 2020 | Selected prior to policy (In 2019-2022 STIP) |
25 | MN15 | Thin mill and overlay from Cottonwood Street to 20th Street S in New Ulm | $600,000 | Not Selected | NA |
17 | US169 | Reconstruction from south of Highway 99 to South Minnesota Avenue Frontage road in St. Peter | $2,700,000 | 2023 | Coordinating with another MnDOT project |