MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. MnDOT scores and prioritizes urban non-freeway/non-expressway pavement projects separately from the normal pavement scoring process, because of their complexity, utilities and other infrastructure and level of required local coordination and public involvement. In many instances, these roads function both as state highways and as city streets. These pavement projects can be on either National Highway System or non-NHS.
Freeways have full access control (no driveways, signals or at-grade intersections). Expressways have partial access control (limited or no driveways, few and widely spaced intersections, and may include some grade separated crossings). Both are high speed roads designed to facilitate longer trips.
For the purposes of this scoring category, MnDOT uses a flexible, context-based definition of urban. This includes areas with medium-to-high density adjacent development with small to medium setbacks, and in some instances no setback. This includes both residential, industrial and commercial areas. In some instances, the urban context may cover less than a quarter mile.
Urban pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.
What was selected
Related links
- District 7 project selection
- District 7 National Highway System pavement projects
- District 7 Non-National Highway System pavement projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed.
Last updated September 2025
Score | Route | Community | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
91 | MN13 | Waseca | Reconstruct Hwy 13 from 5th St SE to 3rd Ave NW in Waseca | $13,000,000 | 2035 | 8101-1101722 |
89 | MN60 | Windom | Reconstruct in Windom | $30,000,000 | 2032 | 1703-83 |
85 | MN93 | Henderson | Medium mill and overlay from Elm St to MN19 | $200,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
65 | MN19 | Winthrop | Reconstruct from Hwy 15 to the east city limit of Winthrop | $7,700,000 | 2035 | 7205-0000059 |
83 | US75 | Luverne | Reconstruction from I-90 to James St in Luverne | $13,100,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
82 | MN30 | Darfur | Medium mill and overlay from 2nd St to 1st St in Darfur | $100,000 | Not Selected | Will be tied to a rural Hwy 30 pavement project |
82 | US71 | Jackson | Resurface from the Des Moines River Trail crossing to Springfield Parkway in Jackson; pedestrian improvements | $2,500,000 | Not Selected | |
79 | MN15 | New Ulm | Thick mill and overlay from 20th St to Center St in New Ulm | $3,300,000 | Not Selected | Waiting to coordinate with another project |
79 | MN4 | Trimont | Medium mill and overlay from Chestnut St to Beech St in Trimont | $200,000 | Not Selected | Part of Hwy 4 Sherburn to St. James project |
78 | MN19 | Gaylord | Thick mill and overlay from Spring St to 90' NE of Spring St in Gaylord | $100,000 | Not Selected | Very small segment that will be included with the Hwy 19 from Hwy 15 to Gaylord project |
78 | US75 | Luverne | Reconstruct Hwy 75 from Main St to Veterans Dr in Luverne; improve pedestrian crossings | $11,400,000 | 2026, 2027 | 6705-50 |
77 | MN270 | Hills | Resurface from Hills to Hwy 75 | $5,800,000 | 2032 | 6706-1071303 |
74 | MN13 | Waseca | Reclaim and overlay from 3rd Ave NW to Waseca City limits | $1,400,000 | Not Selected | Waiting to coordinate with another project |
73 | MN5 | Arlington | Medium mill and overlay from Baker St to Sheila Dr/2nd Ave NW intersection in Arlington | $400,000 | Not Selected | Will be part of a future Hwy 5 project |
71 | MN22/MN109 | Wells | Reconstruct Hwy 22 and Hwy 109 in Wells | $15,700,000 | 2026, 2027 | 2204-26 |
71 | MN264 | Round Lake | Medium mill and overlay from 2nd Ave to north end of Main St in Round Lake | $100,000 | 2029 | 5310-13 (Part of the Hwy 264 project) |
71 | US169 | Elmore | Reconstruct Hwy 169 from Iowa to Polton St in Elmore; pedestrian improvements | $5,230,000 | 2028 | 2207-121 |
70 | MN22 | Mankato | Reconstruction from 200' north of Hwy 83 to 585' north of Bassett Dr in Mankato | $16,500,000 | 2032 | 0704-109 |
70 | MN30 | New Richland | Medium mill and overlay from Elm Ave to MN13 in New Richmond | $400,000 | Not Selected | |
70 | MN30 | Amboy | Medium mill and overlay from Stevens St to 4th Ave in Amboy | $600,000 | Not Selected | Waiting to coordinate with a future Hwy 30 from Hwy 169 to Mapleton project |
70 | MN91 | Ellsworth | Medium mill and overlay from 7th Ave to North Ave in Ellsworth | $500,000 | Not Selected | Waiting to coordinate with a future Hwy 91 project |
69 | MN19 | New Prague | Thick mill and overlay from 6th Ave to 4th Ave in New Prague | $300,000 | Not Selected | Reconstructed in 2020 |
69 | MN5 | Gaylord | Medium mill and overlay from 1st St to the Division St intersection in Gaylord | $100,000 | Not Selected | Waiting to coordinate this very small segment with a future Hwy 5 project |
65 | MN109 | Winnebago | Medium mill and overlay from US169 to 4th St in Winnebago | $200,000 | Not Selected | Will be part of a future Hwy 109 project |
65 | MN15 | Fairmont | Resurface Hwy 15 in Fairmont and rehabilitate Bridge 46002 | $15,000,000 | 2033 | 4603-1112072 |
65 | MN99 | Nicollet | Medium mill and overlay from Heideman Ave to Birch St in Nicollet | $200,000 | Not Selected | |
64 | MN22 | New Auburn | Thick mill and overlay from 1st St to 5th St in new Auburn | $400,000 | Not Selected | Will be part of a future Hwy 22 project |
63 | MN19 | New Prague | Medium mill and overlay from 7th Ave SE to Alton Ave in New Prague | $800,000 | Not Selected | Reconstructed in 2020 |
60 | MN22 | St Peter | Resurface from Hwy 169 to CR 20 in Saint Peter; pedestrian improvements | $14,200,000 | 2031 | 5205-115 |
60 | MN99 | Le Center | Reconstruct in Le Center | $4,430,000 | 2029 | 4009-114 |
58 | MN22 | Mapleton | Medium mill and overlay from Borchert St to Blue Earth County Road 7 in Mapleton | $1,000,000 | Not Selected | |
57 | MN15 | Truman | Medium mill and overlay from 2nd St S to 2nd St N in Truman | $200,000 | Not Selected | |
57 | US169 | Blue Earth | Medium mill and overlay from 10th St N to Leland Pkwy roundabout in Blue Earth | $800,000 | Not Selected | |
52 | MN19 | Henderson | Medium mill and overlay from Fort Rd to Trail on west side of levee in Henderson | $200,000 | Not Selected | |
50 | US169 | St Peter | Minor CPR and diamond grinding from Jefferson Ave to Chestnut St in St. Peter | $1,000,000 | Not Selected | |
50 | US169 | Winnebago | Thin overlay from MN109 to 2nd Ave in Winnebago | $200,000 | Not Selected | Last rehabilitated in 2018 |
49 | US14 | New Ulm | Medium mill and overlay from Garden St to 7th N Street | $1,600,000 | Not Selected | |
48 | MN60 | Worthington | Minor CPR and diamond grinding from Nobles St to I-90 roundabout in Worthington | $1,200,000 | Not Selected | |
47 | US169 | Vernon Center | Thick overlay from Kendall St to 1st St in Vernon Center | $200,000 | Not Selected | |
46 | MN30 | Mapleton | Medium mill and overlay from 3rd Ave to MN22 in Mapleton | $500,000 | Not Selected | |
46 | MN62 | Windom | Thin mill and overlay from Plum Ave to MN60 in Windom | $300,000 | Not Selected | |
46 | US169 | St Peter | Reconstruct from Broadway Ave to Union St in St Peter; pedestrian improvements | $5,310,000 | 2027 | 5209-81 Temporary pavement treatment used in 2019 to allow for a larger project to be developed. |
46 | US59 | Worthington | Reconstruct Hwy 59 from Hwy 60 to 27th N Street in Worthington and Hwy 35 from Smith Ave to Humiston Ave; construct roundabout; pedestrian improvements | $28,200,000 | 2027 | 5304-41 |
45 | MN111 | Nicollet | Thin mill and overlay from Hillview to 1st St in Nicollet | $200,000 | Not Selected | |
45 | MN13 | New Prague | Major CPR and diamond grinding from 5th St SW to MN19 in New Prague | $400,000 | 2034 | Part of 4002-1071423 (Montgomery to Hwy 19) |
43 | MN4 | Sleepy Eye | Repair from Ellsworth St to 3rd Ave in Sleepy Eye | $2,100,000 | 2031 | 0802-47 |
41 | MN93 | Le Sueur | Major CPR and diamond grinding from Main St to west end of Minnesota River Bridge | $200,000 | Not Selected | |
40 | MN22 | Mankato | Reconstruction from Adams St roundabout to US14 | $5,000,000 | Not Selected | |
35 | MN22 | Gaylord | Thin mill and overlay from Southview Ave to Commercial Ave in Gaylord | $200,000 | Not Selected | |
28 | MN4 | St James | Minor CPR and diamond grinding from 9th St S to 11th Ave North in Saint James | $800,000 | Not Selected | Last rehabilitated in 2017 |
26 | MN19 | Gibbon | Reconstruct in Gibbon | $7,500,000 | 2031 | 7204-22 |
26 | MN19 | New Prague | Reconstruction from 4th Ave to 7th Ave SE in New Prague | $6,500,000 | Not Selected | |
25 | MN22 | Mankato | Minor CPR and diamond grinding from Adams St through Bassett Dr in Mankato | $400,000 | Not Selected | |
21 | MN22 | Gaylord | Thin mill and overlay from High Ave to Linden Ave in Gaylord | $400,000 | Not Selected | |
20 | MN5/MN22/MN19 | Gaylord | Minor CPR at MN5/MN22 and MN19 in Gaylord | $300,000 | Not Selected | Last rehabilitated in 2015 |
12 | MN99 | St Peter | Diamond Grinding from Front St to west end of Minnesota River bridge in St. Peter | $100,000 | Not Selected |
Score | Route | Community | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
91 | Hwy 13 | Waseca | Reconstruct Hwy 13 from 5th St SE to 3rd Ave NW in Waseca | $13,000,000 | 2034 | 8101-1101722 |
89 | Hwy 60 | Windom | Reconstruct in Windom | $30,000,000 | 2032 | 1703-83 |
85 | Hwy 93 | Henderson | Medium mill and overlay from Elm St to Hwy 19 | $200,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
83 | Hwy 19 | Winthrop | Thick mill and overlay from Brown St to Pleasant Ave in Winthrop | $400,000 | Not Selected | Part of the Hwy 19 from Hwy 15 to Gaylord project |
83 | US Hwy 75 | Luverne | Reconstruction from I-90 to James St in Luverne | $13,100,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
82 | Hwy 30 | Darfur | Medium mill and overlay from 2nd St to 1st St in Darfur | $100,000 | Not Selected | Will be tied to a rural Hwy 30 pavement project |
81 | Hwy 13 | Waseca | Reconstruction from Railroad crossing to 4th Ave SE in Waseca | $1,900,000 | Not Selected | Will coordinate with other Waseca pavements |
79 | Hwy 15 | New Ulm | Thick mill and overlay from 20th St to Center St in New Ulm | $3,300,000 | Not Selected | Waiting to coordinate with another project |
79 | Hwy 4 | Trimont | Medium mill and overlay from Chestnut St to Beech St in Trimont | $200,000 | Not Selected | Part of Hwy 4 Sherburn to St. James project |
78 | Hwy 19 | Gaylord | Thick mill and overlay from Spring St to 90' NE of Spring St in Gaylord | $100,000 | Not Selected | Very small segment that will be included with the Hwy 19 from Hwy 15 to Gaylord project |
78 | US Hwy 75 | Luverne | Reconstruct Hwy 75 from Main St to Veterans Dr in Luverne; improve pedestrian crossings | $9,100,000 | 2026, 2027 | 6705-50 |
77 | Hwy 270 | Hills | Resurface from Hills to Hwy 75 | $5,800,000 | 2031 | 6706-1071303 |
74 | Hwy 13 | Waseca | Reclaim and overlay from 4th Ave NE to Waseca City limits | $1,400,000 | Not Selected | Waiting to coordinate with another project |
73 | Hwy 5 | Arlington | Medium mill and overlay from Baker St to Sheila Dr/2nd Ave NW intersection in Arlington | $400,000 | Not Selected | Will be part of a future Hwy 5 project |
71 | Hwy 22/Hwy 109 | Wells | Reconstruct Hwy 22 and Hwy 109 in Wells | $15,900,000 | 2026, 2027 | 2204-26 |
71 | Hwy 264 | Round Lake | Medium mill and overlay from 2nd Ave to north end of Main St in Round Lake | $100,000 | Not Selected | Part of the Hwy 264 project |
71 | US Hwy 14 | Courtland | Thick Mill and overlay from Red Shoe Dr to Fiemeyer Dr in Courtland | $300,000 | Not Selected | |
71 | US Hwy 169 | Elmore | Reconstruct Hwy 169 from Iowa to Polton St in Elmore; pedestrian improvements | $5,230,000 | 2028, Future | 2207-121 |
71 | US Hwy 169 | Vernon Center | Resurface Hwy 169 from Vernon Center to Garden City | $6,000,000 | Not Selected | 0712-1111983 |
70 | Hwy 22 | St Peter | Medium mill and overlay from North 3rd St through North Sunrise Dr in St. Peter | $500,000 | Not Selected | Urban section removed from rural Hwy 22 segment (2024) for additional evaluation. |
70 | Hwy 22 | Mankato | Reconstruction from 120' south of Bassett Dr to 585' north of Bassett Dr in Mankato | $1,200,000 | Not Selected | Small segment that will be part of Hwy 22 project between Hwy 83 and Madison Avenue in Mankato |
70 | Hwy 30 | New Richland | Medium mill and overlay from Elm Ave to Hwy 13 in New Richmond | $400,000 | Not Selected | |
70 | Hwy 30 | Amboy | Medium mill and overlay from Stevens St to 4th Ave in Amboy | $600,000 | Not Selected | Waiting to coordinate with a future Hwy 30 from Hwy 169 to Mapleton project |
70 | Hwy 91 | Ellsworth | Medium mill and overlay from 7th Ave to North Ave in Ellsworth | $500,000 | Not Selected | Waiting to coordinate with a future Hwy 91 project |
69 | Hwy 19 | New Prague | Thick mill and overlay from 6th Ave to 4th Ave in New Prague | $300,000 | Not Selected | Will be addressed as part of the Hwy 19 project that extends from Hwy 169 to the east junction of Hwy 13 |
69 | Hwy 5 | Gaylord | Medium mill and overlay from 1st St to the Division St intersection in Gaylord | $100,000 | Not Selected | |
65 | Hwy 109 | Winnebago | Medium mill and overlay from US Hwy 169 to 4th St in Winnebago | $200,000 | Not Selected | Will be part of a future Hwy 109 project |
65 | Hwy 15 | Fairmont | Resurface Hwy 15 in Fairmont | $15,000,000 | 2033 | 4603-1112072 |
65 | Hwy 99 | Nicollet | Medium mill and overlay from Heideman Ave to Birch St in Nicollet | $200,000 | Not Selected | |
64 | Hwy 22 | New Auburn | Thick mill and overlay from 1st St to 5th St in new Auburn | $400,000 | Not Selected | Will be part of a future Hwy 22 project |
63 | Hwy 19 | New Prague | Medium mill and overlay from 7th Ave SE to Alton Ave in New Prague | $800,000 | Not Selected | Part of Hwy 19 project from Hwy 169 to east junction of Hwy 13 |
61 | Hwy 263 | Ceylon | Reconstruction from Clark St to Railroad St in Ceylon | $1,000,000 | Not Selected | Part of Hwy 263 project |
60 | Hwy 22 | St Peter | Resurface from Hwy 169 to CR 20 in Saint Peter | $14,200,000 | 2030 | 5205-115 |
60 | Hwy 99 | Le Center | Reconstruct in Le Center | $4,430,000 | 2029 | 4009-114 |
58 | Hwy 22 | Mapleton | Medium mill and overlay from Borchert St to Blue Earth County Road 7 in Mapleton | $1,000,000 | Not Selected | |
57 | Hwy 15 | Truman | Medium mill and overlay from 2nd St S to 2nd St N in Truman | $200,000 | Not Selected | |
57 | US Hwy 169 | Blue Earth | Medium mill and overlay from 10th St N to Leland Pkwy roundabout in Blue Earth | $800,000 | Not Selected | |
52 | Hwy 19 | Henderson | Medium mill and overlay from Fort Rd to Trail on west side of levee in Henderson | $200,000 | Not Selected | Part of Hwy 19 project from Gaylord to Hwy 169 |
50 | US Hwy 169 | St Peter | Medium mill and overlay from Jefferson Ave to Chestnut St in St. Peter | $1,000,000 | Not Selected | |
50 | US Hwy 169 | Winnebago | Thin overlay from Hwy 109 to 2nd Ave in Winnebago | $200,000 | Not Selected | |
49 | US Hwy 14 | New Ulm | Medium mill and overlay from Garden St to Hwy 15 | $1,600,000 | Not Selected | |
48 | Hwy 60 | Worthington | Minor CPR and diamond grinding from Nobles St to I-90 roundabout in Worthington | $1,200,000 | Not Selected | |
47 | US Hwy 169 | Vernon Center | Thick overlay from Kendall St to 1st St in Vernon Center | $200,000 | Not Selected | |
46 | Hwy 30 | Mapleton | Medium mill and overlay from 3rd Ave to Hwy 22 in Mapleton | $500,000 | Not Selected | |
46 | Hwy 62 | Windom | Thin mill and overlay from Plum Ave to Hwy 60 in Windom | $300,000 | Not Selected | |
46 | US Hwy 169 | St Peter | Reconstruct from Broadway Ave to Union St in St Peter; pedestrian improvements | $4,680,000 | 2027 | 5209-81 Temporary pavement treatment used in 2019 to allow for a larger project to be developed. |
46 | US Hwy 59 | Worthington | Reconstruct Hwy 59 from Hwy 60 to 27th N Street in Worthington and Hwy 35 from Smith Ave to Humiston Ave; construct roundabout; pedestrian improvements | $25,900,000 | 2027, 2028 | 5304-41 |
45 | Hwy 111 | Nicollet | Thin mill and overlay from Hillview to 1st St in Nicollet | $200,000 | Not Selected | |
45 | Hwy 13 | New Prague | Major CPR and diamond grinding from 5th St SW to Hwy 19 in New Prague | $400,000 | Not Selected | Part of the Montgomery to Hwy 19 project |
43 | Hwy 4 | Repair from Ellsworth St to 3rd Ave in Sleepy Eye | $2,100,000 | 2031 | 0802-47 | |
41 | Hwy 93 | Le Sueur | Major CPR and diamond grinding from Main St to west end of Minnesota River Bridge | $200,000 | Not Selected | |
40 | Hwy 22 | Mankato | Reconstruction from Adams St roundabout to US Hwy 14 | $5,000,000 | Not Selected | |
35 | Hwy 22 | Gaylord | Minor CPR and diamond grinding from Southview Dr to Commercial Ave in Gaylord | $200,000 | Not Selected | |
28 | Hwy 4 | St James | Minor CPR and diamond grinding from 9th St S to 11th St North in Saint James | $500,000 | Not Selected | |
26 | Hwy 19 | Gibbon | Reconstruct in Gibbon | $7,500,000 | 2030 | 7204-22 |
26 | Hwy 19 | New Prague | Reconstruction from 4th Ave to 7th Ave SE om New Prague | $6,500,000 | Not Selected | |
25 | Hwy 22 | Mankato | Minor CPR and diamond grinding from Adams St through Bassett Dr in Mankato | $400,000 | Not Selected | |
21 | Hwy 22 | Gaylord | Thin mill and overlay from High St to Linden Ave in Gaylord | $400,000 | Not Selected | |
20 | Hwy 5/Hwy 22/Hwy 19 | Gaylord | Minor CPR at Hwy 5/Hwy 22 and Hwy 19 in Gaylord | $300,000 | Not Selected | |
12 | Hwy 99 | St Peter | Diamond Grinding from Front St to west end of Minnesota River bridge in St. Peter | $100,000 | Not Selected |
Score | Route | Community | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
89 | Hwy 60 | Windom | Reconstruct in Windom | $16,000,000 | 2031 | 1703-83 |
85 | Hwy 93 | Henderson | Medium mill and overlay from Elm St to Hwy 19 | $200,000 | Not Selected | |
83 | Hwy 19 | Winthrop | Thick mill and overlay from Brown St to Pleasant Ave in Winthrop | $400,000 | Not Selected | Part of the Hwy 19 from Hwy 15 to Gaylord project |
83 | US Hwy 75 | Luverne | Reconstruction from I-90 to James St in Luverne | $13,100,000 | Not Selected | |
82 | Hwy 30 | Darfur | Medium mill and overlay from 2nd St to 1st St in Darfur | $100,000 | Not Selected | Will be tied to a rural Hwy 30 pavement project |
81 | Hwy 13 | Waseca | Reconstruction from Railroad crossing to 4th Ave SE in Waseca | $1,900,000 | Not Selected | Will coordinate with other Waseca pavements |
80 | Hwy 15 | Fairmont | Resurface Hwy 15 in Fairmont | $9,000,000 | 2033 | 4603-1112072 |
79 | Hwy 15 | New Ulm | Thick mill and overlay from 20th St to Center St in New Ulm | $3,300,000 | Not Selected | Waiting to coordinate with another project |
79 | Hwy 4 | Trimont | Medium mill and overlay from Chestnut St to Beech St in Trimont | $200,000 | Not Selected | Part of Hwy 4 Sherburn to St. James project |
78 | Hwy 19 | Gaylord | Thick mill and overlay from Spring St to 90' NE of Spring St in Gaylord | $100,000 | Not Selected | Very small segment that will be included with the Hwy 19 from Hwy 15 to Gaylord project |
78 | Hwy 22/Hwy 109 | Wells | Reconstruct Hwy 22 and Hwy 109 in Wells | $13,300,000 | 2026, 2027 | 2204-26 |
76 | Hwy 13 | Waseca | Reconstruct Hwy 13 from 5th St SE to 3rd Ave NW in Waseca | $13,000,000 | 2033 | 8101-1101722 |
74 | Hwy 13 | Waseca | Reclaim and overlay from 4th Ave NE to Waseca City limits | $1,400,000 | Not Selected | Waiting to coordinate with another project |
73 | Hwy 5 | Arlington | Medium mill and overlay from Baker St to Sheila Dr/2nd Ave NW intersection in Arlington | $400,000 | Not Selected | Will be part of a future Hwy 5 project |
71 | Hwy 264 | Round Lake | Medium mill and overlay from 2nd Ave to north end of Main St in Round Lake | $100,000 | Not Selected | Part of the Hwy 264 project |
71 | US Hwy 14 | Courtland | Thick Mill and overlay from Red Shoe Dr to Fiemeyer Dr in Courtland | $300,000 | Not Selected | |
71 | US Hwy 169 | Vernon Center | Resurface Hwy 169 from Vernon Center to Garden City | $6,000,000 | 2033 | 0712-1111983 |
71 | US Hwy 169 | Elmore | Reconstruct Hwy 169 in Elmore | $6,000,000 | 2033 | 2207-121 |
70 | Hwy 22 | St Peter | Resurface from Hwy 169 to CR 20 in Saint Peter | $12,000,000 | 2028 | 5205-115 |
70 | Hwy 22 | Mankato | Reconstruction from 120' south of Bassett Dr to 585' north of Bassett Dr in Mankato | $1,200,000 | Not Selected | Small segment that will be part of Hwy 22 project between Hwy 83 and Madison Avenue in Mankato |
70 | Hwy 22 | St Peter | Medium mill and overlay from North 3rd St through North Sunrise Dr in St. Peter | $500,000 | Not Selected | Urban section removed from rural Hwy 22 segment (2024) for additional evaluation. |
70 | Hwy 30 | Amboy | Medium mill and overlay from Stevens St to 4th Ave in Amboy | $600,000 | Not Selected | Waiting to coordinate with a future Hwy 30 from Hwy 169 to Mapleton project |
70 | Hwy 30 | New Richland | Medium mill and overlay from Elm Ave to Hwy 13 in New Richmond | $400,000 | Not Selected | |
70 | Hwy 91 | Ellsworth | Medium mill and overlay from 7th Ave to North Ave in Ellsworth | $500,000 | Not Selected | Waiting to coordinate with a future Hwy 91 project |
70 | US Hwy 59 | Worthington | Reconstruct in Worthington | $13,600,000 | 2027, Future | 5304-41 |
69 | Hwy 19 | New Prague | Thick mill and overlay from 6th Ave to 4th Ave in New Prague | $300,000 | Not Selected | Will be addressed as part of the Hwy 19 project that extends from Hwy 169 to the east junction of Hwy 13 |
69 | Hwy 5 | Gaylord | Medium mill and overlay from 1st St to the Division St intersection in Gaylord | $100,000 | Not Selected | |
69 | US Hwy 75 | Luverne | Resurface Hwy 75 from Main St to Veterans Dr in Luverne; improve pedestrian crossings | $4,800,000 | 2025 | 6705-50 Local utility needs are being addressed prior to the project. |
65 | Hwy 109 | Winnebago | Medium mill and overlay from US Hwy 169 to 4th St in Winnebago | $200,000 | Not Selected | Will be part of a future Hwy 109 project |
65 | Hwy 99 | Nicollet | Medium mill and overlay from Heideman Ave to Birch St in Nicollet | $200,000 | Not Selected | |
64 | Hwy 22 | New Auburn | Thick mill and overlay from 1st St to 5th St in new Auburn | $400,000 | Not Selected | Will be part of a future Hwy 22 project |
63 | Hwy 19 | New Prague | Medium mill and overlay from 7th Ave SE to Alton Ave in New Prague | $800,000 | Not Selected | Part of Hwy 19 project from Hwy 169 to east junction of Hwy 13 |
61 | Hwy 263 | Ceylon | Reconstruction from Clark St to Railroad St in Ceylon | $1,000,000 | Not Selected | Part of Hwy 263 project |
58 | Hwy 22 | Mapleton | Medium mill and overlay from Borchert St to Blue Earth County Road 7 in Mapleton | $1,000,000 | Not Selected | |
57 | Hwy 15 | Truman | Medium mill and overlay from 2nd St S to 2nd St N in Truman | $200,000 | Not Selected | |
57 | US Hwy 169 | Blue Earth | Medium mill and overlay from 10th St N to Leland Pkwy roundabout in Blue Earth | $800,000 | Not Selected | |
56 | US Hwy 169 | St Peter | Reconstruct from Broadway Ave to Union St in St Peter | $4,300,000 | 2027 | 5209-81 RQI not reflective of pavement needs |
52 | Hwy 19 | Henderson | Medium mill and overlay from Fort Rd to Trail on west side of levee in Henderson | $200,000 | Not Selected | Part of Hwy 19 project from Gaylord to Hwy 169 |
50 | US Hwy 169 | St Peter | Medium mill and overlay from Jefferson Ave to Chestnut St in St. Peter | $1,000,000 | Not Selected | |
50 | US Hwy 169 | Winnebago | Thin overlay from Hwy 109 to 2nd Ave in Winnebago | $200,000 | Not Selected | |
49 | US Hwy 14 | New Ulm | Medium mill and overlay from Garden St to Hwy 15 | $1,600,000 | Not Selected | |
48 | Hwy 60 | Worthington | Minor CPR and diamond grinding from Nobles St to I-90 roundabout in Worthington | $1,200,000 | Not Selected | |
47 | US Hwy 169 | Vernon Center | Thick overlay from Kendall St to 1st St in Vernon Center | $200,000 | Not Selected | |
46 | Hwy 30 | Mapleton | Medium mill and overlay from 3rd Ave to Hwy 22 in Mapleton | $500,000 | Not Selected | |
46 | Hwy 62 | Windom | Thin mill and overlay from Plum Ave to Hwy 60 in Windom | $300,000 | Not Selected | |
45 | Hwy 111 | Nicollet | Thin mill and overlay from Hillview to 1st St in Nicollet | $200,000 | Not Selected | |
45 | Hwy 13 | New Prague | Major CPR and diamond grinding from 5th St SW to Hwy 19 in New Prague | $400,000 | Not Selected | Part of the Montgomery to Hwy 19 project |
43 | Hwy 19 | Gibbon | Reconstruct in Gibbon | $3,000,000 | 2029 | 7204-1111863 |
41 | Hwy 93 | Le Sueur | Major CPR and diamond grinding from Main St to west end of Minnesota River Bridge | $200,000 | Not Selected | |
40 | Hwy 22 | Mankato | Reconstruction from Adams St roundabout to US Hwy 14 | $5,000,000 | Not Selected | |
35 | Hwy 22 | Gaylord | Minor CPR and diamond grinding from Southview Dr to Commercial Ave in Gaylord | $200,000 | Not Selected | |
28 | Hwy 4 | St James | Minor CPR and diamond grinding from 9th St S to 11th St North in Saint James | $500,000 | Not Selected | |
26 | Hwy 19 | New Prague | Reconstruction from 4th Ave to 7th Ave SE om New Prague | $6,500,000 | Not Selected | |
25 | Hwy 22 | Mankato | Minor CPR and diamond grinding from Adams St through Bassett Dr in Mankato | $400,000 | Not Selected | |
25 | Hwy 4 | Sleepy Eye | Repair from Ellsworth St to 3rd Ave in Sleepy Eye | $2,100,000 | 2032 | 0802-47 |
21 | Hwy 22 | Gaylord | Thin mill and overlay from High St to Linden Ave in Gaylord | $400,000 | Not Selected | |
20 | Hwy 5/Hwy 22/Hwy 19 | Gaylord | Minor CPR at Hwy 5/Hwy 22 and Hwy 19 in Gaylord | $300,000 | Not Selected | |
12 | Hwy 99 | St Peter | Diamond Grinding from Front St to west end of Minnesota River bridge in St. Peter | $100,000 | Not Selected | |
NA | Hwy 257 | Hanska | Resurface Hwy 257 from Hanska to Hwy 15 | $2,000,000 | 2024 | 0808-09 |
NA | US Hwy 75 | Luverne | Replace Pavement on Hwy 75 in Luverne after city utility work | $142,560 | 2024 | 6704-119 |
Score | Route | Community | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
89 | Hwy 60 | Windom | Reconstruct in Windom | $16,000,000 | 2031 | 1703-83 |
85 | Hwy 93 | Henderson | Medium mill and overlay from Elm St to Hwy 19 | $200,000 | Not Selected | |
83 | Hwy 19 | Winthrop | Thick mill and overlay from Brown St to Pleasant Ave in Winthrop | $400,000 | Not Selected | Part of the Hwy 19 from Hwy 15 to Gaylord project |
82 | Hwy 30 | Darfur | Medium mill and overlay from 2nd St to 1st St in Darfur | $100,000 | Not Selected | Will be tied to a rural Hwy 30 pavement project |
81 | Hwy 13 | Waseca | Reconstruction from Railroad crossing to 4th Ave SE in Waseca | $1,900,000 | Not Selected | Will coordinate with other Waseca pavements |
80 | Hwy 15 | Fairmont | Thick mill and overlay from School St to E 4th St in Fairmont | $1,000,000 | Not Selected | Monitoring performance of recent project |
79 | Hwy 15 | New Ulm | Thick mill and overlay from 20th St to Center St in New Ulm | $3,300,000 | Not Selected | Waiting to coordinate with another project |
79 | Hwy 4 | Trimont | Medium mill and overlay from Chestnut St to Beech St in Trimont | $200,000 | Part of Hwy 4 Sherburn to St. James project | |
78 | Hwy 19 | Gaylord | Thick mill and overlay from Spring St to 90' NE of Spring St in Gaylord | $100,000 | Not Selected | Very small segment that will be included with the Hwy 19 from Hwy 15 to Gaylord project |
78 | Hwy 22/Hwy 109 | Wells | Reconstruct Hwy 22 and Hwy 109 in Wells | $8,270,000 | 2026, Future | 2204-26 |
76 | Hwy 13 | Waseca | Reconstruct Hwy 13 from 5th St SE to 3rd Ave NW in Waseca | $13,000,000 | 2032 | 8101-1101722 |
74 | Hwy 13 | Waseca | Reclaim and overlay from 4th Ave NE to Waseca City limits | $1,400,000 | Not Selected | Waiting to coordinate with another project |
73 | Hwy 5 | Arlington | Medium mill and overlay from Baker St to Sheila Dr/2nd Ave NW intersection in Arlington | $400,000 | Not Selected | Will be part of a future Hwy 5 project |
71 | Hwy 264 | Round Lake | Medium mill and overlay from 2nd Ave to north end of Main St in Round Lake | $100,000 | Not Selected | Part of the Hwy 264 project |
71 | US Hwy 14 | Courtland | Thick Mill and overlay from Red Shoe Dr to Fiemeyer Dr in Courtland | $300,000 | Not Selected | |
71 | US Hwy 169 | Elmore | Medium mill and overlay from Jay St to Poulton St in Elmore | $300,000 | Not Selected | Removed from Iowa to Blue Earth project to accommodate city's interest in replacing underground utilities |
70 | Hwy 22 | St Peter | Medium mill and overlay from North 3rd St through North Sunrise Dr in St. Peter | $500,000 | Not Selected | Urban section removed from rural Hwy 22 segment (2024) for additional evaluation. |
70 | Hwy 22 | Mankato | Reconstruction from 120' south of Bassett Dr to 585' north of Bassett Dr in Mankato | $1,200,000 | Not Selected | Small segment that will be part of Hwy 22 project between Hwy 83 and Madison Avenue in Mankato |
70 | Hwy 22 | St Peter | Resurface from Hwy 169 to CR 20 in Saint Peter | $2,100,000 | 2028 | 5205-115 |
70 | Hwy 30 | Amboy | Medium mill and overlay from Stevens St to 4th Ave in Amboy | $600,000 | Not Selected | Waiting to coordinate with a future Hwy 30 from Hwy 169 to Mapleton project |
70 | Hwy 30 | New Richland | Medium mill and overlay from Elm Ave to Hwy 13 in New Richmond | $400,000 | Not Selected | |
70 | Hwy 91 | Ellsworth | Medium mill and overlay from 7th Ave to North Ave in Ellsworth | $500,000 | Not Selected | Waiting to coordinate with a future Hwy 91 project |
70 | US Hwy 59 | Worthington | Reconstruct in Worthington | $13,600,000 | 2027 | 5304-41 |
69 | Hwy 19 | New Prague | Thick mill and overlay from 6th Ave to 4th Ave in New Prague | $300,000 | Not Selected | Will be addressed as part of the Hwy 19 project that extends from Hwy 169 to the east junction of Hwy 13 |
69 | Hwy 5 | Gaylord | Medium mill and overlay from 1st St to the Division St intersection in Gaylord | $100,000 | Not Selected | |
69 | US Hwy 75 | Luverne | Resurface Hwy 75 from Main St to Veterans Dr in Luverne; improve pedestrian crossings | $4,400,000 | 2025 | 6705-50; Local utility needs are being addressed prior to the project. |
65 | Hwy 109 | Winnebago | Medium mill and overlay from US Hwy 169 to 4th St in Winnebago | $200,000 | Not Selected | Will be part of a future Hwy 109 project |
65 | Hwy 99 | Nicollet | Medium mill and overlay from Heideman Ave to Birch St in Nicollet | $200,000 | Not Selected | |
64 | Hwy 22 | New Auburn | Thick mill and overlay from 1st St to 5th St in new Auburn | $400,000 | Not Selected | Will be part of a future Hwy 22 project |
63 | Hwy 19 | New Prague | Medium mill and overlay from 7th Ave SE to Alton Ave in New Prague | $800,000 | Not Selected | Part of Hwy 19 project from Hwy 169 to east junction of Hwy 13 |
61 | Hwy 263 | Ceylon | Reconstruction from Clark St to Railroad St in Ceylon | $1,000,000 | Not Selected | Part of Hwy 263 project |
58 | Hwy 22 | Mapleton | Medium mill and overlay from Borchert St to Blue Earth County Road 7 in Mapleton | $1,000,000 | Not Selected | |
57 | Hwy 15 | Truman | Medium mill and overlay from 2nd St S to 2nd St N in Truman | $200,000 | Not Selected | |
57 | US Hwy 169 | Blue Earth | Medium mill and overlay from 10th St N to Leland Pkwy roundabout in Blue Earth | $800,000 | Not Selected | |
56 | US Hwy 169 | St Peter | Reconstruct from Broadway Ave to Union St in St Peter | $3,900,000 | 2027 | 5209-81; RQI not reflective of pavement needs |
52 | Hwy 13 | Montgomery | Reconstruct Hwy 13 in Montgomery from Milwaukee Ave to N Welco Dr with improvements to sidewalk, lighting and drainage; construct roundabout at Hwy 13 and Le Sueur Hwy 28 intersection north of Montgomery | $8,000,000 | 2023 | 4002-49; Drainage and saturation issues contributing to the rapid deterioration of the roadway |
52 | Hwy 19 | Henderson | Medium mill and overlay from Fort Rd to Trail on west side of levee in Henderson | $200,000 | Not Selected | Part of Hwy 19 project from Gaylord to Hwy 169 |
50 | US Hwy 169 | St Peter | Medium mill and overlay from Jefferson Ave to Chestnut St in St. Peter | $1,000,000 | Not Selected | |
50 | US Hwy 169 | Winnebago | Thin overlay from Hwy 109 to 2nd Ave in Winnebago | $200,000 | Not Selected | |
49 | US Hwy 14 | New Ulm | Medium mill and overlay from Garden St to Hwy 15 | $1,600,000 | Not Selected | |
48 | Hwy 60 | Worthington | Minor CPR and diamond grinding from Nobles St to I-90 roundabout in Worthington | $1,200,000 | Not Selected | |
47 | US Hwy 169 | Vernon Center | Thick overlay from Kendall St to 1st St in Vernon Center | $200,000 | Not Selected | |
46 | Hwy 30 | Mapleton | Medium mill and overlay from 3rd Ave to Hwy 22 in Mapleton | $500,000 | Not Selected | |
46 | Hwy 62 | Windom | Thin mill and overlay from Plum Ave to Hwy 60 in Windom | $300,000 | Not Selected | |
45 | Hwy 111 | Nicollet | Thin mill and overlay from Hillview to 1st St in Nicollet | $200,000 | Not Selected | |
45 | Hwy 13 | New Prague | Major CPR and diamond grinding from 5th St SW to Hwy 19 in New Prague | $400,000 | Not Selected | Part of the Montgomery to Hwy 19 project |
43 | Hwy 19 | Gibbon | Thick overlay from Ash Ave to Ely Ave in Gibbon | $400,000 | Not Selected | |
41 | Hwy 93 | Le Sueur | Major CPR and diamond grinding from Main St to west end of Minnesota River Bridge | $200,000 | Not Selected | |
40 | Hwy 22 | Mankato | Reconstruction from Adams St roundabout to US Hwy 14 | $5,000,000 | Not Selected | |
35 | Hwy 22 | Gaylord | Minor CPR and diamond grinding from Southview Dr to Commercial Ave in Gaylord | $200,000 | Not Selected | |
28 | Hwy 4 | St James | Minor CPR and diamond grinding from 9th St S to 11th St North in Saint James | $500,000 | Not Selected | |
26 | Hwy 19 | New Prague | Reconstruction from 4th Ave to 7th Ave SE om New Prague | $6,500,000 | Not Selected | |
25 | Hwy 22 | Mankato | Minor CPR and diamond grinding from Adams St through Bassett Dr in Mankato | $400,000 | Not Selected | |
25 | Hwy 4 | Sleepy Eye | Repair from Ellsworth St to 3rd Ave in Sleepy Eye | $2,100,000 | 2029 | 0802-47 |
21 | Hwy 22 | Gaylord | Thin mill and overlay from High St to Linden Ave in Gaylord | $400,000 | Not Selected | |
20 | Hwy 5/Hwy 22/Hwy 19 | Gaylord | Minor CPR at Hwy 5/Hwy 22 and Hwy 19 in Gaylord | $300,000 | Not Selected | |
12 | Hwy 99 | St Peter | Diamond Grinding from Front St to west end of Minnesota River bridge in St. Peter | $100,000 | Not Selected |
View more detailed scores (Excel).
Score | Route | Community | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
89 | Hwy 60 | Windom | Reconstruction from 6th St to US71 in Windom | $11,900,000 | 2031 | NA |
85 | Hwy 4 | Sherburn | Medium mill and overlay from Front St to 5th St | $200,000 | 2023 | 4602-27; Part of Hwy 4 Sherburn to St. James project |
85 | Hwy 93 | Henderson | Medium mill and overlay from Elm St to Hwy 19 | $200,000 | Not Selected | NA |
83 | Hwy 19 | Winthrop | Thick mill and overlay from Brown St to Pleasant Ave in Winthrop | $400,000 | 2028 | Part of the Hwy 19 from Hwy 15 to Gaylord project |
83 | US Hwy 75 | Luverne | Reconstruction from I-90 to James St in Luverne | $13,100,000 | Not Selected | NA |
82 | Hwy 30 | Darfur | Medium mill and overlay from 2nd St to 1st St in Darfur | $100,000 | Not Selected | Will be tied to a rural Hwy 30 pavement project |
81 | Hwy 13 | Waseca | Reconstruction from Railroad crossing to 4th Ave SE in Waseca | $1,900,000 | Not Selected | Will coordinate with other Waseca pavements |
81 | US Hwy 169 | St Peter | Reconstruction from Minnesota Ave frontage road to Jefferson Ave in St. Peter | $1,500,000 | 2023 | 5211-66; Pavement will be addressed as part of intersection improvement at Hwys 22, 169, and 99 on south side of St Peter |
80 | Hwy 13 | Waseca | Reconstruction from 5th St to Railroad Crossing in Waseca | $6,300,000 | Not Selected | Monitoring pavement performance; Will require local coordination |
80 | Hwy 15 | Fairmont | Thick mill and overlay from School St to E 4th St in Fairmont | $1,000,000 | Not Selected | Monitoring performance of recent project |
79 | Hwy 4 | Trimont | Medium mill and overlay from Chestnut St to Beech St in Trimont | $200,000 | 2023 | Part of Hwy 4 Sherburn to St. James project |
79 | Hwy 15 | New Ulm | Thick mill and overlay from 20th St to Center St in New Ulm | $3,300,000 | Not Selected | Waiting to coordinate with another project |
78 | Hwy 19 | Gaylord | Thick mill and overlay from Spring St to 90' NE of Spring St in Gaylord | $100,000 | 2028 | Very small segment that will be included with the Hwy 19 from Hwy 15 to Gaylord project |
78 | Hwy 22 | Wells | Reconstruction from 9th St to the Railroad crossing in Wells | $4,900,000 | 2026 | 2204-26; Reconstruction tied to Hwy 22 from Wells to I-90 project |
78 | Hwy 270 | Hills | Medium mill and overlay from Railroad bridge to Rock County Road 6 in Hills | $400,000 | 2030 | Part of the Hwy 270 project |
77 | Hwy 109 | Wells | Medium mill and overlay from 560th St to Hwy 22 in Wells | $300,000 | 2026 | 2204-26; Part of urban Wells Hwy 22 project |
76 | Hwy 22 | Kiester | Medium mill and overlay from Front St to Center St in Kiester | $100,000 | 2031 | 2203-115; Part of the Hwy 22 project from Iowa to County Road 16 |
74 | Hwy 13 | Waseca | Reclaim and overlay from 4th Ave NE to Waseca City limits | $1,400,000 | Not Selected | Waiting to coordinate with another project |
73 | Hwy 5 | Arlington | Medium mill and overlay from Baker St to Sheila Dr/2nd Ave NW intersection in Arlington | $400,000 | Not Selected | Will be part of a future Hwy 5 project |
71 | US Hwy 14 | Courtland | Thick Mill and overlay from Red Shoe Dr to Fiemeyer Dr in Courtland | $300,000 | Not Selected | NA |
71 | US71 | Jackson | Thick mill and overlay from Des Moines River Trail Crossing to Springfield Pkwy in Jackson | $200,000 | 2030 | 3205-36; Part of Hwy 71 project from Iowa |
71 | US Hwy 169 | Elmore | Medium mill and overlay from Jay St to Poulton St in Elmore | $300,000 | Not Selected | Removed from Iowa to Blue Earth project to accommodate city's interest in replacing underground utilities |
71 | Hwy 264 | Round Lake | Medium mill and overlay from 2nd Ave to north end of Main St in Round Lake | $100,000 | 2031 | Part of the Hwy 264 project |
70 | Hwy 22 | Mankato | Reconstruction from 120' south of Bassett Dr to 585' north of Bassett Dr in Mankato | $1,200,000 | 2030 | Small segment that will be part of Hwy 22 project between Hwy 83 and Madison Avenue in Mankato |
70 | Hwy 22 | St Peter | Medium mill and overlay from North 3rd St through North Sunrise Dr in St. Peter | $500,000 | 2028 | Urban section removed from rural Hwy 22 segment (2024) for additional evaluation. |
70 | Hwy 30 | Amboy | Medium mill and overlay from Stevens St to 4th Ave in Amboy | $600,000 | Not Selected | Waiting to coordinate with a future Hwy 30 from Hwy 169 to Mapleton project |
70 | Hwy 30 | New Richland | Medium mill and overlay from Elm Ave to Hwy 13 in New Richmond | $400,000 | Not Selected | NA |
70 | Hwy 91 | Ellsworth | Medium mill and overlay from 7th Ave to North Ave in Ellsworth | $500,000 | Not Selected | Waiting to coordinate with a future Hwy 91 project |
70 | Hwy 99 | Le Center | Reconstruction from Maple Ave to Cordova Ave in Le Center | $3,000,000 | 2029 | 4009-114; Part of the Hwy 99 project that extends to Hwy 13 |
69 | Hwy 5 | Gaylord | Medium mill and overlay from 1st St to the Division St intersection in Gaylord | $100,000 | Not Selected | NA |
69 | Hwy 19 | New Prague | Thick mill and overlay from 6th Ave to 4th Ave in New Prague | $300,000 | 2029 | Will be addressed as part of the Hwy 19 project that extends from Hwy 169 to the east junction of Hwy 13 |
65 | Hwy 99 | Nicollet | Medium mill and overlay from Heideman Ave to Birch St in Nicollet | $200,000 | Not Selected | NA |
65 | Hwy 109 | Winnebago | Medium mill and overlay from US Hwy 169 to 4th St in Winnebago | $200,000 | Not Selected | Will be part of a future Hwy 109 project |
64 | Hwy 22 | New Auburn | Thick mill and overlay from 1st St to 5th St in new Auburn | $400,000 | Not Selected | Will be part of a future Hwy 22 project |
63 | Hwy 19 | New Prague | Medium mill and overlay from 7th Ave SE to Alton Ave in New Prague | $800,000 | 2029 | Part of Hwy 19 project from Hwy 169 to east junction of Hwy 13 |
63 | US Hwy 75 | Luverne | Cold in place recycling from Main St to Veterans Dr in Luverne | $900,000 | 2025 | 6705-50; Local utility needs are being addressed prior to the project. |
61 | Hwy 263 | Ceylon | Reconstruction from Clark St to Railroad St in Ceylon | $1,000,000 | 2022 | 4609-117; Part of Hwy 263 project |
60 | US Hwy 14 | Springfield | Chip seal from Mary Ave to Washington Ave in Springfield | $- | 2023 | 0803-44; Part of Hwy 14 project to Sanborn |
60 | US Hwy 59 | Worthington | Reconstruction from 1st Ave to 440' to the east in Worthington | $14,300,000 | 2027 | Small segment part of larger Hwy 59 reconstruction project in Worthington |
58 | Hwy 22 | Mapleton | Medium mill and overlay from Borchert St to Blue Earth County Road 7 in Mapleton | $1,000,000 | Not Selected | NA |
57 | Hwy 15 | Truman | Medium mill and overlay from 2nd St S to 2nd St N in Truman | $200,000 | Not Selected | NA |
57 | US Hwy 169 | Blue Earth | Medium mill and overlay from 10th St N to Leland Pkwy roundabout in Blue Earth | $800,000 | Not Selected | NA |
56 | Hwy 22 | Minnesota Lake | Cold in place recycling from 4th Ave to Main St in Minnesota Lake | $100,000 | 2023 | 2205-13; Part of Hwy 22 Wells to Mapleton project |
56 | Hwy 60 | Lake Crystal | Reconstruction from Lilly St to Laclaire St in Lake Crystal | $15,600,000 | 2024 | 0708-47; Extensive pavement deterioration |
55 | Hwy 60 | Madison Lake | Reconstruction from 7th St to 1st St in Madison Lake | $2,000,000 | 2022 | 4006-35; Reconstruction part of the Hwy 60 from Hwy 14 to Waterville project |
54 | Hwy 86 | Lakefield | Reconstruction from 5th Ave to Funk Ave in Lakefield | $4,100,000 | 2022 | 3208-19; Partnering with the city as part of an extensive utility replacement project |
52 | Hwy 13 | Montgomery | Reconstruction from Milwaukee Ave to Welco Ave in Montgomery | $6,800,000 | 2023 | 4002-49; Drainage and saturation issues contributing to the rapid deterioration of the roadway |
52 | Hwy 19 | Henderson | Medium mill and overlay from Fort Rd to Trail on west side of levee in Henderson | $200,000 | 2026 | Part of Hwy 19 project from Gaylord to Hwy 169 |
50 | US Hwy 169 | St Peter | Medium mill and overlay from Jefferson Ave to Chestnut St in St. Peter | $1,000,000 | Not Selected | NA |
50 | US Hwy 169 | Winnebago | Thin overlay from Hwy 109 to 2nd Ave in Winnebago | $200,000 | Not Selected | NA |
49 | US Hwy 14 | New Ulm | Medium mill and overlay from Garden St to Hwy 15 | $1,600,000 | Not Selected | NA |
48 | Hwy 60 | Worthington | Minor CPR and diamond grinding from Nobles St to I-90 roundabout in Worthington | $1,200,000 | Not Selected | NA |
47 | US Hwy 169 | Vernon Center | Thick overlay from Kendall St to 1st St in Vernon Center | $200,000 | Not Selected | NA |
46 | Hwy 30 | Mapleton | Medium mill and overlay from 3rd Ave to Hwy 22 in Mapleton | $500,000 | Not Selected | NA |
46 | Hwy 62 | Windom | Thin mill and overlay from Plum Ave to Hwy 60 in Windom | $300,000 | Not Selected | NA |
46 | US Hwy 169 | St Peter | Reconstruction from Chestnut St to Ramsey St in St. Peter | $5,700,000 | 2025 | 5209-81; RQI not reflective of pavement needs |
45 | Hwy 13 | New Prague | Major CPR and diamond grinding from 5th St SW to Hwy 19 in New Prague | $400,000 | 2030 | Part of the Montgomery to Hwy 19 project |
45 | Hwy 111 | Nicollet | Thin mill and overlay from Hillview to 1st St in Nicollet | $200,000 | Not Selected | NA |
43 | Hwy 19 | Gibbon | Thick overlay from Ash Ave to Ely Ave in Gibbon | $400,000 | Not Selected | NA |
41 | Hwy 93 | Le Sueur | Major CPR and diamond grinding from Main St to west end of Minnesota River Bridge | $200,000 | Not Selected | NA |
40 | Hwy 22 | Mankato | Reconstruction from Adams St roundabout to US Hwy 14 | $5,000,000 | Not Selected | NA |
35 | Hwy 22 | Gaylord | Minor CPR and diamond grinding from Southview Dr to Commercial Ave in Gaylord | $200,000 | Not Selected | NA |
28 | Hwy 4 | St James | Minor CPR and diamond grinding from 9th St S to 11th St North in Saint James | $500,000 | Not Selected | NA |
26 | Hwy 19 | New Prague | Reconstruction from 4th Ave to 7th Ave SE om New Prague | $6,500,000 | Not Selected | NA |
25 | Hwy 4 | Sleepy Eye | Minor CPR and diamond grinding from Ellsworth St to Allison Pkwy in Sleepy Eye | $500,000 | 2027 | Hwy 4 concrete repair on both sides of Hwy 14 |
25 | Hwy 22 | Mankato | Minor CPR and diamond grinding from Adams St through Bassett Dr in Mankato | $400,000 | Not Selected | NA |
21 | Hwy 22 | Gaylord | Thin mill and overlay from High St to Linden Ave in Gaylord | $400,000 | Not Selected | NA |
20 | Hwy 5/Hwy 22/Hwy 19 | Gaylord | Minor CPR at Hwy 5/Hwy 22 and Hwy 19 in Gaylord | $300,000 | Not Selected | NA |
12 | Hwy 99 | St Peter | Diamond Grinding from Front St to west end of Minnesota River bridge in St. Peter | $100,000 | Not Selected | NA |
View more detailed scores (Excel).
Score | Route | Community | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
86 | US 169 | St Peter | Reconstruction from Minnesota Ave frontage road to Jefferson Ave in Saint Peter | $1,500,000 | 2023 | Pavement will be addressed as part of intersection improvement at Hwys 22, 169, and 99 on south side of St Peter |
85 | MN 13 | Waseca | Reconstruction from 5th St in Waseca to the railroad crossing | $3,100,000 | Not Selected | Monitoring pavement performance; Will require local coordination |
84 | US 75 | Luverne | Thick mill and overlay from I-90 to Veterans Drive in Luverne | $8,000,000 | 2025 | |
82 | MN 270 | Hills | Medium mill and overlay from Railroad overpass to Lincoln County Road 6 in Hills | $2,000,000 | 2030 | Part of the Hwy 270 project |
81 | US 169 | Elmore | Medium mill and overlay from Jay St to Poulton St in Elmore | $1,700,000 | 2022 | Part of the Hwy 169 project from Iowa to Blue Earth |
80 | MN 15 | Fairmont | Medium mill and overlay from School St to E 4th St in Fairmont | $2,600,000 | Not Selected | Monitoring performance of recent project |
80 | US 59 | Worthington | Reconstruction from 1st St to south of I-90 in Worthington | $14,300,000 | 2027 | Coordinating with the City of Worthington on planned reconstruction |
78 | MN 19 | Gaylord | Thick mill and overlay from Spring St to 90 ft NE of Spring St in Gaylord | $100,000 | 2028 | Very small segment that will be included with the Hwy 19 from Hwy 15 to Gaylord project |
78 | MN 19 | Winthrop | Thick mill and overlay from Brown St to Pleasant Ave in Winthrop | $2,500,000 | 2028 | Part of the Hwy 19 from Hwy 15 to Gaylord project |
78 | MN 22 | Wells | Reconstruction from 10th St to Hwy 109 in Wells | $8,000,000 | 2026 | Coordinating with Wells to I-90 project |
76 | MN 22 | Kiester | Medium mill and overlay from Front St to Center St in Kiester | $2,500,000 | 2027 | Part of the Hwy 22 project from Iowa to I-90 |
75 | MN 22 | Mankato | Reconstruction from 120 ft south of Basset Dr to 585 ft north of Basset Dr in Mankato | $2,000,000 | 2030 | Small segment that will be part of Hwy 22 project between Hwy 83 and Madison Avenue in Mankato |
75 | MN 60 | Windom | Major resurfacing from 6th St to Hwy 71 intersection in Windom | $8,500,000 | Not Selected | Corridor study underway. City monitoring pavement performance. |
73 | MN 13 | Waseca | Reclaim and overlay from 4th Ave NE to northern Waseca City limits | $700,000 | Not Selected | Waiting to coordinate with another project |
71 | MN 30 | Amboy | Medium mill and overlay from Stevens St to 4th St in Amboy | $400,000 | Not Selected | Waiting to coordinate with another project |
71 | MN 99 | Le Center | Reconstruction from Maple Ave to Cordova Ave in LeCenter | $1,600,000 | 2029 | Part of the Hwy 99 project that extends to Hwy 13 |
71 | MN 264 | Round Lake | Medium mill and overlay from 2nd Ave to north end of Main st in Round Lake | $1,900,000 | 2030 | Part of the Hwy 264 project |
68 | MN 5 | Arlington | Medium mill and overlay from Baker St to Sheila Dr/2nd ave NW intersection in Arlington | $200,000 | Not Selected | Will be part of a future Hwy 5 project |
67 | MN 13 | Waseca | Reconstruction from railroad crossing ro 4th Ave NE in Waseca | $1,000,000 | Not Selected | |
66 | MN 91 | Ellsworth | Medium mill and overlay from 7th Ave to North ave in Ellsworth | $300,000 | Not Selected | Waiting to coordinate with a future Hwy 91 project |
66 | US 169 | St Peter | Reconstruction from Chestnut St to Ramsey st in St. Peter | $3,500,000 | 2025 | Selected due to extensive pavement deterioration |
66 | MN 4 | Sherburn | Medium mill and overlay from Front Street (CR26) to 5th Street in Sherburn | $1,500,000 | 2024 | Completing as part of Hwy 4 project north to St James |
65 | MN 109 | Winnebago | Medium mill and overlay from Hwy 169 to 4th St in Winnebago | $100,000 | Not Selected | Will be part of a future Hwy 109 project |
64 | MN 22 | New Auburn | Thick mill and overlay from 1st St to 5th St in New Auburn | $3,600,000 | Not Selected | Will be part of a future Hwy 22 project |
63 | MN 19 | New Prague | Medium mill and overlay from 7th Ave SE to east of the Alton Ave Roundabout in New Prague | $200,000 | 2029 | Part of Hwy 19 project from Hwy 169 to east junction of Hwy 13 |
62 | MN 22 | Minnesota Lake | Medium overlay from 4th Ave to Main st in Minnesota Lake | $3,200,000 | 2023 | Part of Hwy 22 Wells to Mapleton project |
62 | US 71 | Jackson | Thick mill and overlay from Des Moins River Trail Crossing to Springfield Pkwy in Jackson | $100,000 | 2028 | Part of Hwy 71 project from Iowa to I-90 |
61 | MN 263 | Ceylon | Reconstruction from Clark St to Railroad St in Ceylon | $1,500,000 | 2022 | Part of Hwy 263 project |
60 | MN 30 | New Richland | Medium mill and overlay from Elm Ave to Hwy 13 | $200,000 | Not Selected | |
60 | MN 99 | Nicollet | Medium mill and overlay from Heidemann Ave to Birch St in Nicollet | $300,000 | Not Selected | |
60 | MN 4 | Trimont | Medium overlay from Chestnut Street to Beech Street in Trimont | $1,000,000 | 2024 | Completing as part of Hwy 4 project north to St James |
59 | MN 15 | New Ulm | Thin mill and overlay from 20th St to Center St in New Ulm | $1,100,000 | Not Selected | Waiting to coordinate with another project |
58 | MN 30 | Darfur | Medium mill and overlay from 2nd st through 1st St in Darfur | $2,600,000 | Not Selected | |
58 | US 169 | Blue Earth | Medium mill and overlay from 10th St to the north side of the Leland Pkwy roundabout in Blue Earth | $400,000 | Not Selected | |
57 | MN 60 | Madison Lake | Reconstruction from 7th St to 1st St in Madison Lake | $2,000,000 | 2021 | Reconstruction part of the Hwy 60 from Hwy 14 to Waterville project |
56 | US 169 | Mankato | Medium mill and overlay from Webster Ave to Hwy14 in Mankato and North Mankato | $2,800,000 | 2027 | Part of Hwy 169 project in Mankato and North Mankato |
53 | MN 19 | New Prague | Thick mill and overlay from 6th Ave to 4th Ave in New Prague | $100,000 | 2029 | Will be addressed as part of the Hwy 19 project that extends from Hwy 169 to the east junction of Hwy 13 |
52 | MN 13 | Montgomery | Reconstruction from Milwaukee Ave to Welco Ave to Montgomery | $4,200,000 | 2023 | Drainage and saturation issues contributing to the rapid deterioration of the roadway |
51 | MN 62 | Windom | Thin mill and overlay from Plum Ave to Hwy 60 in Windom | $200,000 | Not Selected | |
50 | MN 60 | Lake Crystal | Reconstruction from Lilly St to Leclaire St in Lake Crystal | $6,800,000 | 2024 | Selected due to extensive pavement deterioration |
50 | MN 111 | Nicollet | Thin mill and overlay from Hillview St to 1st St in Nicollet | $100,000 | Not Selected | |
49 | MN 22 | St Peter | Medium mill and overlay from 3rd St to North Sunrise Dr in St Peter | $1,000,000 | 2024 | Part of Hwy 22 project between Hwy 169 and Hwy 111 |
48 | MN 5 | Gaylord | Reconstruction from 1st St to Division St in Gaylord | $500,000 | Not Selected | |
48 | MN 60 | Worthington | Resurfacing from Nobles St to north of the Roundabout at I-90 | $2,100,000 | Not Selected | |
47 | MN 15 | Truman | Medium overlay from south 2nd St to north 2nd St in Truman | $2,800,000 | Not Selected | |
46 | US 59 | Worthington | Reconstruction from 1st to 440 ft to the east in Worthington | $1,000,000 | 2027 | Small segment part of larger Hwy 59 reconstruction project in Worthington |
46 | MN 4 | Sleepy Eye | Reconstruction from Ellsworth St to north of Allison Pkwy in Sleepy Eye | $2,100,000 | 2027 | Hwy 4 concrete repair on both sides of Hwy 14 |
45 | MN 13 | New Prague | Major Reconstruction from 5th ave to Hwy 19 in New Prague | $2,900,000 | 2029 | Part of the Montgomery to Hwy 19 project |
45 | MN 86 | Lakefield | Reconstruction from 5th Ave to Funk Ave in Lakefield | $3,500,000 | 2022 | Partnering with the city as part of an extensive utility replacement project |
43 | MN 19 | Gibbon | Thick overlay from Ash Ave to Ely Ave in Gibbon | $3,100,000 | Not Selected | |
42 | US 14 | Sleepy Eye | Chip seal from 8th Ave to east of 7th Ave in Sleepy Eye | $150,000 | Not Selected | |
39 | US 14 | Springfield | Medium mill and overlay from Mary Ave to Washington Ave in Springfield | $500,000 | 2022 | Selected prior to policy (in 2019-2022 STIP) |
39 | MN 15 | New Ulm | Reconstruction from Broadway Ave to German St in New Ulm | $500,000 | Not Selected | |
35 | MN 22 | Mankato | Minor resurfacing from north of Bassett Dr through the Adams St roundabout in Mankato | $300,000 | Not Selected | |
33 | MN 91 | Adrian | Major reconstruction from 4th St to Railroad Crossing in Adrian | $200,000 | Not Selected | |
33 | MN 91 | Adrian | Medium mill and overlay from Railroad Crossing to Pearl St in Adrian | $200,000 | Not Selected | |
31 | MN 93 | Le Sueur | Major reconstruction from Main st to west end of Minnesota River Bridge in LeSueur | $100,000 | Not Selected | |
31 | US 169 | St Peter | Minor resurfacing from Jefferson Ave to Chestnut St in St Peter | $400,000 | Not Selected | |
30 | MN 22 | Mankato | Reconstruction from north side of Adams St Roundabout to Hwy14 | $4,800,000 | Not Selected | |
28 | MN 4 | St James | Reconstruction from 9th Avenue S to 11th Avenue N in Saint James | $300,000 | Not Selected | |
21 | MN 22 | Gaylord | Thin mill and overlay from High Ave to Linden Ave in Gaylord | $200,000 | Not Selected | |
20 | MN 22/MN 5/MN 19 | Gaylord | Minor resurfacing on Hwy/22/5/19 in downtown Gaylord | $100,000 | Not Selected | |
15 | MN 22 | Gaylord | Minor resurfacing from Southview Dr to Commercial St in Gaylord | $100,000 | Not Selected | |
9 | MN 99 | St Peter | Resurfacing from Front St to west end of the Minnesota River Bridge in St Peter | $250,000 | Not Selected |
View more detailed scores (Excel).
Score | Community | Route | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
85 | Lakefield | MN86 | Medium mill and overlay from 5th Ave S to Funk Ave | $6,100,000 | Not Selected | Waiting to coordinate with a rural pavement project on Highway 86 |
82 | Jackson | US71 | Medium mill and overlay from the Des Moines River Trail crossing to Springfield Parkway | $4,500,000 | 2028 | Part of larger Highway 71 project |
80 | Worthington | US59 | Reconstruction from 1st Ave to I-90 | $13,000,000 | 2027 | |
80 | Nicollet | MN99 | Medium mill and overlay from Heideman Ave to Birch St | $6,300,000 | Not Selected | Waiting to coordinate with another project. |
79 | Waseca | MN13 | Medium mill and overlay from south of 4th Ave NE to northern Waseca city limits | $900,000 | Not Selected | Waiting to coordinate with another project. |
78 | Gaylord | MN19 | Medium overlay from Spring St to northeast of Spring St | $3,900,000 | Not Selected | Better suited to be included in surrounding Highway 19 project |
76 | Ceylon | MN263 | Reclaim and overlay from Clark St to Railroad St | $5,300,000 | 2021 | Part of larger Highway 263 project. |
76 | Elmore | US169 | Medium overlay from Jay St to Polton St | $3,500,000 | 2023 | |
76 | Kiester | MN22 | Medium mill and overlay from Front St to Center St | $5,100,000 | 2027 | Part of larger Highway 22 project |
75 | Windom | MN60 | Major pavement rehabilitation from 6th St to the east Highway 71 intesection | $8,400,000 | 2020 | |
75 | Henderson | MN93 | Medium mill and overlay from Elm St to Highway 19 | $2,000,000 | Not Selected | Waiting to coordinate with another project. |
75 | Mankato | MN22 | Reconstruction from Bassett Dr to north of Bassett Dr | $17,000,000 | Not Selected | Waiting to coordinate with a larger pavement project on Highway 22 in Mankato |
72 | Minnesota Lake | MN22 | Medium overlay from 4th Ave to Main St | $6,600,000 | 2023 | Part of larger Highway 22 project between Mapleton and Wells. |
71 | Amboy | MN30 | Medium overlay from Stevens St to 4th Ave | $500,000 | Not Selected | |
71 | Round Lake | MN264 | Reclaim and overlay from 2nd Ave to the north end of Main St | $5,600,000 | Not Selected | Potential turnback candidate that will take coordination with local partners |
70 | Waseca | MN13 | Medium mill and overlay from 5th St SE to the railroad crossing | $1,300,000 | Not Selected | |
69 | Luverne | US75 | Medium mill and overlay from I-90 to James St | $1,400,000 | 2025 | Included as part of larger Highway 75 project in Rock County. Selected prior to policy (in 2019-2028 CHIP) |
68 | Darfur | MN30 | Medium overlay from 2nd St through 1st St | $4,900,000 | Not Selected | |
67 | Gaylord | MN5 | Reconstruction from east of 1st St to the Division St intersection | $3,700,000 | Not Selected | |
66 | Sherburn | MN4 | Medium mill and overlay from Front St to 5th St | $6,300,000 | 2022 | Part of larger Highway 4 project. Selected prior to policy (in 2019-2022 STIP) |
66 | Le Center | MN99 | Medium mill and overlay from Maple Ave to Cordova Ave | $8,900,000 | 2027 | Part of larger Highway 99 project. May become a separate urban project if substantial local needs are identified |
66 | Ellsworth | MN91 | Medium mill and overlay from 7th Ave to North Ave | $400,000 | Not Selected | |
65 | Winnebago | MN109 | Medium mill and overlay from Highway 169 to 4th St | $200,000 | Not Selected | |
64 | Springfield | US14 | Medium mill and overlay from Mary Ave to Washington Ave | $2,900,000 | 2022 | Selected prior to policy (in 2019-2022 STIP) |
63 | Wells | MN22 | Medium mill and overlay from 9th St SW to the railroad crossing | $400,000 | 2025 | Included as part of of larger Highway 22 adjacent project to south. Selected prior to policy (in 2019-2028 CHIP) |
63 | New Prague | MN19 | Medium mill and overlay from 7th Ave SE to Alton Ave roundabout | $400,000 | 2029 | Part of larger Highway 19 project east of Highway 169. Selected prior to policy (in 2019-2028 CHIP) |
63 | Arlington | MN5 | Medium mill and overlay from Baker St to Sheila Dr/2nd Ave NW intersection | $4,200,000 | Not Selected | |
61 | Mankato | US169 | Medium mill and overlay from Webster Ave to Highway 14 | $2,800,000 | 2027 | Corridor study to be completed before any long-term improvements made |
60 | Trimont | MN4 | Medium overlay from Chestnut St to Beech St | $6,100,000 | 2022 | Selected prior to policy (in 2019-2022 STIP) |
60 | New Prague | MN19 | Medium mill and overlay from 6th Ave NW to 4th Ave SE | $200,000 | 2029 | Part of larger Highway 19 project east of Highway 169. Selected prior to policy (in 2019-2028 CHIP) |
60 | Gaylord | MN22 | Medium mill and overlay from Southview Dr to Commercial Ave | $100,000 | Not Selected | |
59 | New Ulm | MN15 | Thin mill and overlay from 20th S St to Center St | $1,600,000 | Not Selected | |
58 | Blue Earth | US169 | Medium mill and overlay from 10th St to north side of Leland Parkway roundabout | $700,000 | Not Selected | |
57 | Madison Lake | MN60 | Reconstruction from 7th St to 1st St | $2,000,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
57 | Montgomery | MN13 | Medium mill and overlay from Milwaukee Ave to north of Welco Dr | $700,000 | Not Selected | |
56 | Gaylord | MN22 | Medium mill and overlay from High Ave to Linden Ave | $400,000 | Not Selected | |
56 | Waseca | MN13 | Medium mill and overlay from the railroad crossing to south of 4th Ave NE | $200,000 | Not Selected | |
55 | New Richland | MN30 | Medium mill and overlay from Elm Ave to Highway 13 | $5,400,000 | Not Selected | |
54 | New Ulm | US14 | Medium mill and overlay from Garden St to 7th St N | $1,500,000 | Not Selected | |
53 | Winthrop | MN19 | Pavement rehabilitation from Brown St to Pleasant Ave | $2,800,000 | 2020 | Short-term fix to be used until funding for a long-term fix can be identified |
52 | Henderson | MN19 | Medium mill and overlay from Fort Road to trail on the west side of the levee | $300,000 | 2025 | Part of larger Highway 19 project. Selected prior to policy (in 2019-2028 CHIP) |
51 | Windom | MN62 | Medium mill and overlay from Plum Ave to Highway 60 | $400,000 | Not Selected | |
49 | St Peter | MN22 | Medium mill and overlay from 3rd St through N Sunrise Dr | $500,000 | 2024 | Part of larger Highway 22 project. Potential turnback. |
49 | New Auburn | MN22 | Medium overlay from 1st St to 5th St | $5,300,000 | Not Selected | |
48 | Worthington | MN60 | Minor concrete rehabilitation from Nobles St to north of the I-90 roundabout | $2,000,000 | Not Selected | |
47 | Truman | MN15 | Medium overlay from 2nd St S to 2nd St N | $11,000,000 | Not Selected | |
47 | Mapleton | MN30 | Medium mill and overlay from 3rd Ave SW to MN 22 | $500,000 | Not Selected | |
47 | Vernon Center | US169 | Major concrete rehabilitation from Kendall St to 1st St | $8,700,000 | Not Selected | |
46 | St Peter | US169 | Medium mill and overlay from Chestnut St to Ramsey St | $5,300,000 | 2022 | Short-term fix to be used until funding for a long-term fix can be identified |
46 | Sleepy Eye | MN4 | Major concrete rehabilitation from Ellsworth St in Sleepy Eye to 65' north of Allison Parkway NW | $1,300,000 | 2027 | Coordinating with another MnDOT project; Selected prior to policy (in 2019-2028 CHIP) |
45 | New Prague | MN13 | Thick overlay from 5th St SW to Highway 19 | $5,500,000 | Not Selected | |
43 | Gibbon | MN19 | Major concrete rehabilitation from Ash Ave to Ely Ave | $6,500,000 | Not Selected | |
42 | Wells | MN109 | Medium mill and overlay from 6th Ave to Highway 22 | $300,000 | 2025 | Coordinating with another MnDOT project. |
40 | Lake Crystal | MN60 | Concrete pavement replacement from Lilly St to Laclaire St | $17,000,000 | 2024 | Coordinating with another MnDOT project; Selected prior to policy (in 2019-2028 CHIP) |
36 | St Peter | US169 | Reconstruction from Minnesota Ave frontage road to Jefferson Ave | $500,000 | 2023 | Coordinating with another MnDOT project; Selected prior to policy (in 2019-2028 CHIP) |
35 | Courtland | US14 | Thin mill and overlay from Red Shoe Dr to Fiemeyer Dr | $3,000,000 | 2021 | Coordinating with another MnDOT project; Selected prior to policy (in 2019-2022 STIP) |
33 | Adrian | MN91 | Major concrete rehabilitation from 4th St to the railroad crossing | $200,000 | 2020 | Coordinating with another MnDOT project; Selected prior to policy (in 2019-2022 STIP) |
33 | Adrian | MN91 | Medium mill and overlay from the railroad crossing to Pearl St | $200,000 | 2020 | Coordinating with another MnDOT project; Selected prior to policy (in 2019-2022 STIP) |
31 | St Peter | US169 | Minor concrete rehabilitation from Jefferson Ave to north of Chestnut St | $400,000 | Not Selected | |
31 | Le Sueur | MN93 | Minor concrete rehabilitation from Main St to west end of the Minnesota River bridge | $100,000 | Not Selected | |
30 | Mankato | MN22 | Reconstruction from Adams St roundabout to the southern intersection of Highway 14 | $4,800,000 | Not Selected | Was in 2019-2028 CHIP, but removed in preparation for a larger Highway 22 project in Mankato |
28 | St James | MN4 | Minor concrete rehabilitation from 9th Ave S to 11th Ave N | $200,000 | Not Selected | |
25 | Mankato | MN22 | Minor concrete rehabilitation from Bassett Dr through the Adams St roundabout | $200,000 | Not Selected | |
21 | Worthington | US59 | Reconstruction from 1st Ave to 440 feet to the east | $100,000 | 2027 | Coordinating with another MnDOT project; Selected prior to policy (in 2019-2028 CHIP) |
20 | Gaylord | MN5/MN22/MN19 | Minor concrete rehabilitation in downtown Gaylord | $200,000 | Not Selected | |
9 | St Peter | MN99 | Minor concrete rehabilitation from Front St to the west end of the Minnesota River Bridge | $100,000 | Not Selected |