MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in Hwy SHIP.
Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.
What was selected
Related links
- District 7 project selection
- District 7 National Highway System pavement projects
- District 7 Urban pavement projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed.
Last updated September 2025
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
90 | US75 | Resurface from Luverne to Trosky; replace 3 bridges | $10,300,000 | 2028 | 6705-47 |
87 | MN15 | Medium mill and overlay from Iowa to Fairmont | $5,200,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
85 | MN19 | Medium mill and overlay from Gaylord to Henderson | $8,700,000 | 2030 | 7206-117 |
85 | MN19 | Resurface from Hwy 169 to east Jct of Hwy 13 | $17,900,000 | 2034 | 4004-126 |
85 | MN22 | Medium mill and overlay from Sunrise Dr in St. Peter to Nicollet County Road 20 | $5,300,000 | 2031 | 5205-113; Will be completed with remainder of the MN 22 to US 169 in St. Peter |
85 | MN22 | Reconstruction from Hungry Hollow Rd to Maple Hill Rd | $1,500,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
84 | MN13 | Resurface from Waterville to Montgomery | $15,100,000 | 2031 | 4001-48 |
83 | MN86 | Resurface Hwy 86 from I-90 to Hwy 60 (Except Lakefield); replace or improve drainage; replace signs | $10,300,000 | 2035 | 3208-XX |
83 | MN68 | Reclaim and overlay from MN 15 south of New Ulm to US169 | $12,000,000 | 2032 | 0710-123 |
82 | MN19 | Medium mill and overlay from Red Wing Ave to Leroy Ave | $800,000 | 2034 | 4004-126 |
80 | MN13 | Resurface from Montgomery to New Prague | $6,520,000 | 2034 | 4002-XX |
80 | MN22 | Medium mill and overlay from 6th Ave NE to Blue Earth County Road 15 | $5,500,000 | Not Selected | |
80 | MN22 | Medium mill and overlay from County Road 90 to Hungry Hollow Rd | $300,000 | Not Selected | |
79 | MN22 | Resurface from Iowa border to west Jct of CR 16 | $3,100,000 | 2029 | 2203-115 |
79 | MN22 | Resurface from west Jct of CR 16 to Wells | $1,000,000 | 2029 | 2203-115 |
79 | MN30 | Resurface Hwy 30 from US 71 to Darfur; replace or improve drainage, signing and lighting | $6,100,000 | Not Selected | |
79 | MN5 | Cold in place recycling and medium overlay from MN22 to east of 4th St in Arlington | $3,700,000 | Not Selected | |
78 | MN5 | Cold in place recycling and medium overlay from 5th St to US 212 | $3,100,000 | Not Selected | |
78 | MN91 | Resurface Hwy 91 from Iowa to Adrian | $8,000,000 | Not Selected | |
77 | MN99 | Medium mill and overlay from east side of railroad crossing east of St. Peter to Maple Avenue in Le Center | $6,300,000 | Not Selected | |
76 | MN19 | Resurface Hwy 19 from Fairfax to Gibbon | $6,500,000 | Not Selected | |
76 | MN93 | Medium mill and overlay from Minnesota River Bridge to US169 | $400,000 | Not Selected | |
76 | US75 | Resurface from Iowa border to Luverne | $9,900,000 | 2033 | 6704-116 |
75 | MN22 | Medium mill and overlay from Maple Hill Road to MN 86 | $400,000 | Not Selected | |
74 | MN13 | Medium mill and overlay from 2.2 miles north of MN30 to 1.5 miles north of Waseca | $4,100,000 | Not Selected | |
74 | MN22 | Resurface Hwy 22 from Gaylord to Hwy 212; replace bridge 72003 and rehab bridge 72004; replace or improve drainage, signing and lighting | $4,800,000 | Not Selected | |
73 | MN19 | Medium mill and overlay from 11th Ave SW to New Prague western City Limits | $200,000 | 2034 | 4004-126 |
72 | MN19 | Resurface Henderson to Hwy 169 | $2,000,000 | 2028 | 4004-145 |
72 | MN83 | Reclaim and overlay from Blue Earth County Road 173 to Blue Earth County Road 41 | $7,200,000 | Not Selected | |
71 | MN109 | MN109 from east side of Winnebago to western Wells limits | $7,300,000 | Not Selected | |
71 | MN19 | Resurface from Winthrop to Gaylord | $8,800,000 | 2029 | 7205-118 |
71 | MN22 | Reconstruct from Hwy 83 to Bassett Dr | $16,500,000 | 2032 | 0704-1069603 |
71 | MN22 | Unbonded overlay from north of Blue Earth County Road 15 to north junction of Blue Earth County Road 90 | $3,400,000 | Not Selected | |
71 | MN264 | Resurface from Round Lake to I-90 | $2,600,000 | 2029 | 5310-13 |
72 | MN68 | Medium mill and overlay from Redwood/Brown county line to MN | $4,000,000 | Not Selected | |
70 | MN13 | Medium mill and overlay from MN30 to 2.2 miles north of MN30 | $1,200,000 | Not Selected | |
70 | MN22 | Medium mill and overlay from .3 miles north of Blue Earth County Road 90 to .6 miles north of Blue Earth County Road 90 | $300,000 | Not Selected | |
70 | MN22 | Medium mill and overlay from .33 south of MN 83 to 200ft north of MN 83 | $400,000 | Not Selected | |
70 | MN83 | Thick mill and overlay from 1000ft east of Blue Earth County Road 41 to 1000ft west of Blue Earth County Road 41 | $300,000 | Not Selected | |
68 | MN30 | Medium mill and overlay from 1 mile east of US169 to Troendle St NW | $5,200,000 | Not Selected | |
68 | MN4 | Medium mill and overlay from Iowa/Minnesota Border to County Road 26 (where MN 4 turns right) | $5,200,000 | Not Selected | |
68 | MN4 | Medium mill and overlay from MN68 to MN19 in Fairfax | $4,300,000 | Not Selected | |
68 | MN83 | Medium mill and overlay from MN30 to Blue Earth County Road 173 | $6,900,000 | Not Selected | |
67 | MN19 | Medium mill and overlay from Alton Ave to Red Wing Ave | $200,000 | 2034 | 4004-126 |
65 | MN22 | Medium mill and overlay from 1500 south of the west junction US212 to US212 | $200,000 | Not Selected | |
64 | MN99 | Medium mill and overlay from MN13 to MN21 | $4,100,000 | Not Selected | |
61 | MN109 | Medium mill and overlay from MN22 to I-90 | $5,200,000 | Not Selected | |
61 | US59 | Medium mill and overlay from the Iowa/Minnesota Border to MN60 | $2,200,000 | Not Selected | |
60 | MN5 | Medium mill and overlay from Sibley County Road 15 to 5th St | $300,000 | Not Selected | |
60 | MN83 | Reclaim and overlay from Blue Earth County Road 41 to Ichabod Lane | $300,000 | Not Selected | |
54 | MN4 | Reclaim and overlay from 3rd Ave SW in Sleepy Eye to MN 68 | $2,000,000 | Not Selected | |
53 | MN19 | Minor CPR and diamond grinding from MN4 to MN15 | $5,000,000 | Not Selected | |
46 | MN13 | Resurface from Waseca to Waterville | $5,700,000 | 2033 | 8102-30 |
43 | MN13 | Thin mill and overlay from Waseca County Road 103 to 5th St in Waseca | $500,000 | Not Selected | |
43 | MN62 | Medium mill and overlay from US/59 Fulda City limits to Plum Ave in Windom | $12,300,000 | Not Selected | |
41 | MN111 | Thin mill and overlay from US 14 to Seventh Street in Nicollet | $200,000 | Not Selected | |
41 | MN30 | Resurface from Hwy 15 to Hwy 169 | $6,000,000 | 2033 | 0705-26 |
41 | MN5 | Medium mill and overlay from 4th Ave E to Blue Earth County Road 15 | $2,900,000 | Not Selected | |
40 | MN13 | Medium mill and overlay from 1.5 miles south of Waseca to .728 miles north of Waseca County Road 103 | $500,000 | Not Selected | |
40 | MN83 | Thin mill and overlay from Ichabod Lane to MN 22 | $100,000 | Not Selected | |
27 | MN22 | Resurface Hwy 22 from St Peter to Hwy 111; pedestrian improvements | $5,800,000 | 2026 | 5205-113 |
23 | MN91 | Medium mill and overlay from I-90 to Murray County line | $3,900,000 | Not Selected | |
20 | MN30 | Cold in place recycling from MN83 to western New Richland city limits | $4,900,000 | Not Selected | |
19 | MN22 | Reclaim and overlay from MN111 to Sibley County Road 67 | $7,400,000 | Not Selected | |
18 | MN13 | Minor CPR and diamond grinding from .2 miles south of MN60 to .26 miles north of MN60 | $200,000 | Not Selected | |
18 | MN19 | Thin mill and overlay from Le Sueur County Road 143 to 11th Ave SW | $200,000 | Not Selected | |
16 | MN4 | Minor CPR and diamond grinding from MN60 to Wantonwan County Road 12 | $200,000 | Not Selected |
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
90 | US Hwy 75 | Resurface from Luverne to Trosky; replace 3 bridges | $10,300,000 | 2028, Future | 6705-47 |
87 | Hwy 15 | Resurface from Iowa to Fairmont | $5,200,000 | Not Selected | 4603-52; Not a district priority, will continue to monitor pavement performance |
85 | Hwy 19 | Resurface from Gaylord to Henderson | $20,200,000 | 2030 | 7206-117 |
85 | Hwy 19 | Resurface from Hwy 169 to east Jct of Hwy 13 | $17,900,000 | 2032 | 4004-126 |
85 | Hwy 22 | Medium mill and overlay from Sunrise Dr in St. Peter to Nicollet County Road 20 | $5,300,000 | Not Selected | Will be completed with remainder of the Hwy 22 to US 169 in St. Peter |
85 | Hwy 22 | Reconstruction from Hungry Hollow Rd to Maple Hill Rd | $1,500,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
84 | Hwy 13 | Resurface from Waterville to Montgomery | $15,100,000 | 2031 | 4001-48 |
83 | Hwy 86 | Resurface Hwy 86 from I-90 to Hwy 60 (Except Lakefield); replace or improve drainage; replace signs | $4,600,000 | Not Selected | 3208-1101745; Not a district priority, will continue to monitor pavement performance |
83 | Hwy 68 | Reclaim and overlay from Hwy 15 south of New Ulm to US Hwy 169 | $14,800,000 | 2031 | 0710-123 |
82 | Hwy 19 | Medium mill and overlay from Red Wing Ave to Leroy Ave | $800,000 | Not Selected | Not a district priority, will continue to monitor pavement performance |
81 | Hwy 4 | Resurface Hwy 4 from Martin Hwy 26 near Sherburn to Hwy 60 near St. James; replace 1 bridge and repair 3 bridges | $21,954,637 | 2025, Prior | 4602-27 |
80 | Hwy 13 | Resurface from Montgomery to New Prague | $6,520,000 | 2034 | 4002-1071423 |
80 | Hwy 22 | Medium mill and overlay from 6th Ave NE to Blue Earth County Road 15 | $5,500,000 | Not Selected | NA |
80 | Hwy 22 | Medium mill and overlay from County Road 90 to Hungry Hollow Rd | $300,000 | Not Selected | NA |
79 | Hwy 22 | Resurface from Iowa border to west Jct of CR 16 | $8,400,000 | 2033 | 2203-115 |
79 | Hwy 22 | Resurface from west Jct of CR 16 to Wells | $6,500,000 | 2029 | 2204-27 |
79 | Hwy 30 | Resurface Hwy 30 from US 71 to Darfur; replace or improve drainage, signing and lighting | $6,100,000 | Not Selected | 1702-1101744 |
79 | Hwy 5 | Cold in place recycling and medium overlay from Hwy 22 to east of 4th St in Arlington | $3,700,000 | Not Selected | NA |
78 | Hwy 5 | Cold in place recycling and medium overlay from 5th St to US 212 | $3,100,000 | Not Selected | NA |
78 | Hwy 91 | Resurface Hwy 91 from Iowa to Adrian | $8,000,000 | Not Selected | 5307-1112064 |
77 | Hwy 99 | Medium mill and overlay from east side of railroad crossing east of St. Peter to Maple Avenue in Le Center | $6,300,000 | Not Selected | NA |
76 | Hwy 19 | Resurface Hwy 19 from Fairfax to Gibbon | $6,500,000 | Not Selected | 7204-1112109 |
76 | Hwy 93 | Medium mill and overlay from Minnesota River Bridge to US Hwy 169 | $400,000 | Not Selected | NA |
76 | US Hwy 75 | Resurface from Iowa border to Luverne | $9,900,000 | 2033 | 6704-116 |
75 | Hwy 22 | Medium mill and overlay from Maple Hill Road to Hwy 86 | $400,000 | Not Selected | NA |
74 | Hwy 13 | Medium mill and overlay from 2.2 miles north of Hwy 30 to 1.5 miles north of Waseca | $4,100,000 | Not Selected | NA |
74 | Hwy 22 | Resurface Hwy 22 from Gaylord to Hwy 212; replace bridge 72003 and rehab bridge 72004; replace or improve drainage, signing and lighting | $4,800,000 | Not Selected | 7208-1101723 |
73 | Hwy 19 | Medium mill and overlay from 11th Ave SW to New Prague western City Limits | $200,000 | Not Selected | NA |
72 | Hwy 19 | Resurface Henderson to Hwy 169 | $2,000,000 | 2031 | 7206-1121943 |
72 | Hwy 257 | Resurface from Hanska to Hwy 15 | $2,000,000 | Not Selected | 0808-1038067 |
72 | Hwy 83 | Reclaim and overlay from Blue Earth County Road 173 to Blue Earth County Road 41 | $7,200,000 | Not Selected | NA |
71 | Hwy 109 | Hwy 109 from east side of Winnebago to western Wells limits | $7,300,000 | Not Selected | NA |
71 | Hwy 19 | Resurface from Winthrop to Gaylord | $8,800,000 | 2029 | 7205-118 |
71 | Hwy 22 | Reconstruct from Hwy 83 to Bassett Dr | $16,500,000 | 2032 | 0704-1069603 |
71 | Hwy 22 | Unbonded overlay from north of Blue Earth County Road 15 to north junction of Blue Earth County Road 90 | $3,400,000 | Not Selected | NA |
71 | Hwy 264 | Resurface from Round Lake to I-90 | $2,600,000 | 2029 | 5310-13 |
71 | Hwy 68 | Medium mill and overlay from County Road 4 in Morgan to Hwy 4 in Sleepy Eye | $4,000,000 | Not Selected | NA |
70 | Hwy 13 | Medium mill and overlay from Hwy 30 to 2.2 miles north of Hwy 30 | $1,200,000 | Not Selected | NA |
70 | Hwy 22 | Medium mill and overlay from .3 miles north of Blue Earth County Road 90 to .6 miles north of Blue Earth County Road 90 | $300,000 | Not Selected | NA |
70 | Hwy 22 | Medium mill and overlay from .33 south of Hwy 83 to 200ft north of Hwy 83 | $400,000 | Not Selected | NA |
70 | Hwy 83 | Thick mill and overlay from 1000ft east of Blue Earth County Road 41 to 1000ft west of Blue Earth County Road 41 | $300,000 | Not Selected | NA |
68 | Hwy 30 | Medium mill and overlay from 1 mile east of US Hwy 169 to Troendle St NW | $5,200,000 | Not Selected | NA |
68 | Hwy 4 | Medium mill and overlay from Iowa/Minnesota Border to County Road 26 (where Hwy 4 turns right) | $5,200,000 | Not Selected | NA |
68 | Hwy 4 | Medium mill and overlay from Hwy 68 to Hwy 19 in Fairfax | $4,300,000 | Not Selected | NA |
68 | Hwy 83 | Medium mill and overlay from Hwy 30 to Blue Earth County Road 173 | $6,900,000 | Not Selected | NA |
67 | Hwy 19 | Medium mill and overlay from Alton Ave to Red Wing Ave | $200,000 | Not Selected | NA |
65 | Hwy 22 | Medium mill and overlay from 1500 south of the west junction US Hwy 212 to US Hwy 212 | $200,000 | Not Selected | NA |
64 | Hwy 99 | Medium mill and overlay from Hwy 13 to Hwy 21 | $4,100,000 | Not Selected | NA |
61 | Hwy 109 | Medium mill and overlay from Hwy 22 to I-90 | $5,200,000 | Not Selected | NA |
61 | US59 | Medium mill and overlay from the Iowa/Minnesota Border to Hwy 60 | $2,200,000 | Not Selected | NA |
60 | Hwy 5 | Medium mill and overlay from Sibley County Road 15 to 5th St | $300,000 | Not Selected | NA |
60 | Hwy 83 | Reclaim and overlay from Blue Earth County Road 41 to Ichabod Lane | $300,000 | Not Selected | NA |
54 | Hwy 4 | Reclaim and overlay from 3rd Ave SW in Sleepy Eye to Hwy 68 | $2,000,000 | Not Selected | NA |
53 | Hwy 19 | Minor CPR and diamond grinding from Hwy 4 to Hwy 15 | $5,000,000 | Not Selected | NA |
46 | Hwy 13 | Resurface from Waseca to Waterville | $5,700,000 | 2033 | 8102-30 |
43 | Hwy 13 | Thin mill and overlay from Waseca County Road 103 to 5th St in Waseca | $500,000 | Not Selected | NA |
43 | Hwy 62 | Medium mill and overlay from US/59 Fulda City limits to Plum Ave in Windom | $12,300,000 | Not Selected | NA |
41 | Hwy 111 | Thin mill and overlay from US 14 to Seventh Street in Nicollet | $200,000 | Not Selected | NA |
41 | Hwy 30 | Resurface from Hwy 15 to Hwy 169 | $6,000,000 | 2033 | 0705-26 |
41 | Hwy 5 | Medium mill and overlay from 4th Ave E to Blue Earth County Road 15 | $2,900,000 | Not Selected | NA |
40 | Hwy 13 | Medium mill and overlay from 1.5 miles south of Waseca to .728 miles north of Waseca County Road 103 | $500,000 | Not Selected | NA |
40 | Hwy 83 | Thin mill and overlay from Ichabod Lane to Hwy 22/Victory Dr | $100,000 | Not Selected | NA |
27 | Hwy 22 | Resurface Hwy 22 from St Peter to Hwy 111; pedestrian improvements | $5,800,000 | 2027 | 5205-113 |
23 | Hwy 91 | Medium mill and overlay from I-90 to Murray County line | $3,900,000 | Not Selected | NA |
20 | Hwy 30 | Cold in place recycling from Hwy 83 to western New Richland city limits | $4,900,000 | Not Selected | NA |
19 | Hwy 22 | Reclaim and overlay from Hwy 111 to Sibley County Road 67 | $7,400,000 | Not Selected | NA |
18 | Hwy 13 | Minor CPR and diamond grinding from .2 miles south of Hwy 60 to .26 miles north of Hwy 60 | $200,000 | Not Selected | NA |
18 | Hwy 19 | Thin mill and overlay from Le Sueur County Road 143 to 11th Ave SW | $200,000 | Not Selected | NA |
16 | Hwy 4 | Minot CPR and diamond grinding from Hwy 60 to Wantonwan County Road 12 | $200,000 | Not Selected | NA |
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
90 | Hwy 13 | Resurface from Montgomery to New Prague | $4,000,000 | 2033 | 4002-1071423 |
88 | Hwy 99 | Resurface from Le Center to Hwy 13 | $7,800,000 | 2029 | 4009-114 |
88 | US Hwy 75 | Resurface from Luverne to Trosky | $12,100,000 | 2028 | 6705-47 |
87 | Hwy 15 | Resurface from Iowa to Fairmont | $5,200,000 | 2033 | 4603-52 |
87 | Hwy 4 | Resurface Hwy 4 from Brown Hwy 18 to Ellsworth St in the City of Sleepy Eye; replace 2 bridges - TIED LET GROUP 10144 | $13,100,000 | 2024 | 0801-35 |
87 | Hwy 4 | Resurface Hwy 4 from Armstrong Blvd in St James to Brown Hwy 18; replace 1 bridge - TIED LET GROUP 10144 | $9,100,000 | 2024 | 8302-48 |
85 | Hwy 13 | Resurface from Waseca to Waterville | $5,700,000 | 2028 | 8102-30 |
85 | Hwy 22 | Medium mill and overlay from Sunrise Dr in St. Peter to Nicollet County Road 20 | $5,300,000 | Not Selected | Will be completed with remainder of the Hwy 22 to US 169 in St. Peter |
85 | Hwy 22 | Reconstruction from Hungry Hollow Rd to Maple Hill Rd | $1,500,000 | Not Selected | NA |
84 | Hwy 19 | Resurface from Hwy 169 to east Jct of Hwy 13 | $12,900,000 | 2031 | 4004-126 |
83 | Hwy 86 | Resurface Hwy 86 from I-90 to Hwy 60 (Except Lakefield); replace or improve drainage; replace signs | $4,600,000 | 2033 | 3208-1101745 |
83 | US Hwy 75 | Resurface from Iowa border to Luverne | $5,000,000 | 2030 | 6704-116 |
82 | Hwy 19 | Medium mill and overlay from Red Wing Ave to Leroy Ave | $800,000 | Not Selected | NA |
82 | Hwy 68 | Reclaim and overlay from Hwy 15 south of New Ulm to US Hwy 169 | $14,800,000 | Not Selected | NA |
81 | Hwy 13 | Resurface from Waterville to Montgomery | $15,000,000 | 2030 | 4001-48 |
81 | Hwy 19 | Medium mill and overlay from Leroy Ave S to Hwy 13 | $200,000 | Not Selected | NA |
81 | Hwy 4 | Resurface Hwy 4 from Martin Hwy 26 to Hwy 60; replace 1 bridge and repair 3 bridges | $21,954,637 | 2024, 2025 | 4602-27 |
80 | Hwy 19 | Resurface from Winthrop to Gaylord | $8,800,000 | 2029 | 7205-1070404 |
80 | Hwy 22 | Medium mill and overlay from 6th Ave NE to Blue Earth County Road 15 | $5,500,000 | Not Selected | NA |
80 | Hwy 22 | Medium mill and overlay from County Road 90 to Hungry Hollow Rd | $300,000 | Not Selected | NA |
80 | Hwy 30 | Medium mill and overlay from Cottonwood County Road 7/Railroad Corssing to US 71 | $8,400,000 | Not Selected | Completed in 2020 |
80 | Hwy 93 | Reconstruct Hwy 93 from Hwy 169 to flood wall in Henderson; replace 1 bridge and add 2 bridges | $34,250,000 | 2024 | 7212-21 Flood mitigation project included with bonding bill |
79 | Hwy 30 | Resurface Hwy 30 from US 71 to Darfur; replace or improve drainage, signing and lighting | $6,100,000 | 2032 | 1702-1101744 |
79 | Hwy 5 | Cold in place recycling and medium overlay from Hwy 22 to east of 4th St in Arlington | $3,700,000 | Not Selected | NA |
78 | Hwy 22 | Resurface from west Jct of CR 16 to Wells | $6,500,000 | 2030 | 2204-27 |
78 | Hwy 5 | Cold in place recycling and medium overlay from 5th St to US 212 | $3,100,000 | Not Selected | NA |
78 | Hwy 91 | Resurface Hwy 91 from Iowa to Adrian | $8,000,000 | 2033 | 5307-1112064 |
77 | Hwy 22 | Resurface from Iowa border to west Jct of CR 16 | $8,400,000 | 2031 | 2203-115 |
77 | Hwy 270 | Resurface from Hills to Hwy 75 | $3,800,000 | 2031 | 6706-1071303 |
77 | Hwy 99 | Medium mill and overlay from east side of railroad crossing east of St. Peter to Maple Avenue in Le Center | $6,300,000 | Not Selected | NA |
76 | Hwy 19 | Resurface Hwy 19 from Fairfax to Gibbon | $6,500,000 | 2033 | 7204-1112109 |
76 | Hwy 264 | Resurface from Round Lake to I-90 | $2,000,000 | 2030 | 5310-1071283 |
76 | Hwy 93 | Medium mill and overlay from Minnesota River Bridge to US Hwy 169 | $400,000 | Not Selected | NA |
75 | Hwy 22 | Medium mill and overlay from Maple Hill Road to Hwy 86 | $400,000 | Not Selected | NA |
74 | Hwy 13 | Medium mill and overlay from 2.2 miles north of Hwy 30 to 1.5 miles north of Waseca | $4,100,000 | Not Selected | NA |
74 | Hwy 22 | Resurface Hwy 22 from Gaylord to Hwy 212; replace bridge 72003 and rehab bridge 72004; replace or improve drainage, signing and lighting | $4,800,000 | 2033 | 7208-1101723 |
73 | Hwy 19 | Medium mill and overlay from 11th Ave SW to New Prague western City Limits | $200,000 | Not Selected | NA |
72 | Hwy 257 | Resurface from Hanska to Hwy 15 | $2,000,000 | 2029 | 0808-1038067 |
72 | Hwy 83 | Reclaim and overlay from Blue Earth County Road 173 to Blue Earth County Road 41 | $7,200,000 | Not Selected | NA |
71 | Hwy 109 | Hwy 109 from east side of Winnebago to western Wells limits | $7,300,000 | Not Selected | NA |
71 | Hwy 22 | Reconstruct from Hwy 83 to Bassett Dr | $16,500,000 | 2031 | 0704-1069603 |
71 | Hwy 22 | Unbonded overlay from north of Blue Earth County Road 15 to north junction of Blue Earth County Road 90 | $3,400,000 | Not Selected | NA |
71 | Hwy 30 | Resurface from Hwy 15 to Hwy 169 | $6,000,000 | 2030 | 0705-26 |
71 | Hwy 68 | Medium mill and overlay from County Road 4 in Morgan to Hwy 4 in Sleepy Eye | $4,000,000 | Not Selected | NA |
70 | Hwy 13 | Medium mill and overlay from Hwy 30 to 2.2 miles north of Hwy 30 | $1,200,000 | Not Selected | NA |
70 | Hwy 22 | Medium mill and overlay from .3 miles north of Blue Earth County Road 90 to .6 miles north of Blue Earth County Road 90 | $300,000 | Not Selected | NA |
70 | Hwy 22 | Medium mill and overlay from .33 south of Hwy 83 to 200ft north of Hwy 83 | $400,000 | Not Selected | NA |
70 | Hwy 83 | Thick mill and overlay from 1000ft east of Blue Earth County Road 41 to 1000ft west of Blue Earth County Road 41 | $300,000 | Not Selected | NA |
69 | Hwy 19 | Resurface from Gaylord to Hwy 169 | $19,200,000 | 2029 | 7206-117 |
68 | Hwy 30 | Medium mill and overlay from 1 mile east of US Hwy 169 to Troendle St NW | $5,200,000 | Not Selected | NA |
68 | Hwy 4 | Medium mill and overlay from Iowa/Minnesota Border to County Road 26 (where Hwy 4 turns right) | $5,200,000 | Not Selected | NA |
68 | Hwy 4 | Medium mill and overlay from Hwy 68 to Hwy 19 in Fairfax | $4,300,000 | Not Selected | NA |
68 | Hwy 83 | Medium mill and overlay from Hwy 30 to Blue Earth County Road 173 | $6,900,000 | Not Selected | NA |
67 | Hwy 19 | Medium mill and overlay from Alton Ave to Red Wing Ave | $200,000 | Not Selected | NA |
65 | Hwy 22 | Medium mill and overlay from 1500 south of the west junction US Hwy 212 to US Hwy 212 | $200,000 | Not Selected | NA |
64 | Hwy 99 | Medium mill and overlay from Hwy 13 to Hwy 21 | $4,100,000 | Not Selected | NA |
63 | Hwy 22 | Resurface Hwy 22 from St Peter to Hwy 111 | $5,500,000 | 2027 | 5205-113 |
61 | Hwy 109 | Medium mill and overlay from Hwy 22 to I-90 | $5,200,000 | Not Selected | NA |
61 | US59 | Medium mill and overlay from the Iowa/Minnesota Border go Hwy 60 | $2,200,000 | Not Selected | NA |
60 | Hwy 5 | Medium mill and overlay from Sibley County Road 15 to 5th St | $300,000 | Not Selected | NA |
60 | Hwy 83 | Reclaim and overlay from Blue Earth County Road 41 to Ichabod Lane | $300,000 | Not Selected | NA |
54 | Hwy 4 | Reclaim and overlay from 3rd Ave SW in Sleepy Eye to Hwy 69 | $2,000,000 | Not Selected | NA |
53 | Hwy 19 | Minor CPR and diamond grinding from Hwy 4 to Hwy 15 | $5,000,000 | Not Selected | NA |
43 | Hwy 13 | Thin mill and overlay from Waseca County Road 103 to 5th St in Waseca | $500,000 | Not Selected | NA |
43 | Hwy 62 | Medium mill and overlay from US/59 Fulda City limits to Plum Ave in Windom | $12,300,000 | Not Selected | NA |
41 | Hwy 111 | Thin mill and overlay from US 14 to Seventh Street in Nicollet | $200,000 | Not Selected | NA |
41 | Hwy 5 | Medium mill and overlay from 4th Ave E to Blue Earth County Road 15 | $2,900,000 | Not Selected | NA |
40 | Hwy 13 | Medium mill and overlay from 1.5 miles south of Waseca to .728 miles north of Waseca County Road 103 | $500,000 | Not Selected | NA |
40 | Hwy 83 | Thin mill and overlay from Ichabod Lane to Hwy 22/Victory Dr | $100,000 | Not Selected | NA |
23 | Hwy 91 | Medium mill and overlay from I-90 to Murray County line | $3,900,000 | Not Selected | NA |
20 | Hwy 30 | Cold in place recycling from Hwy 83 to western New Richland city limits | $4,900,000 | Not Selected | NA |
19 | Hwy 22 | Reclaim and overlay from Hwy 111 to Sibley County Road 67 | $7,400,000 | Not Selected | NA |
18 | Hwy 13 | Minor CPR and diamond grinding from .2 miles south of Hwy 60 to .26 miles north of Hwy 60 | $200,000 | Not Selected | NA |
18 | Hwy 19 | Thin mill and overlay from Le Sueur County Road 143 to 11th Ave SW | $200,000 | Not Selected | NA |
17 | Hwy 30 | Cold in place recycling from Hwy 22 to Hwy 83 | $5,500,000 | Not Selected | NA |
16 | Hwy 4 | Minot CPR and diamond grinding from Hwy 60 to Wantonwan County Road 12 | $200,000 | Not Selected | NA |
11 | Hwy 30 | Thin mill and overlay from Troendle St to Mapleton city limits | $400,000 | Not Selected | NA |
6 | Hwy 30 | Thin mill and overlay from US Hwy 169 to east side of Amboy | $400,000 | Not Selected | NA |
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
90 | Hwy 13 | Resurface from Montgomery to New Prague | $3,000,000 | 2030 | 4002-1071423 |
89 | Hwy 22 | Resurface Hwy 22 from Hwy 29 in Wells to Hwy 30 in Mapleton; extend 1 bridge | $9,065,000 | 2023 | 2205-13 |
88 | Hwy 99 | Resurface from Le Center to Hwy 13 | $7,000,000 | 2029 | 4009-114 |
88 | US Hwy 75 | Resurface from Luverne to Trosky | $12,100,000 | 2028 | 6705-47 |
87 | Hwy 15 | Resurface from Iowa to Fairmont | $5,200,000 | 2032 | 4603-52 |
87 | Hwy 4 | Resurface Hwy 4 from Armstrong Blvd in St James to Brown Hwy 18; replace 1 bridge | $8,200,000 | 2023 | 8302-48 |
87 | Hwy 4 | Resurface Hwy 4 from Brown Hwy 18 to Ellsworth St in the City of Sleepy Eye; replace 2 bridges | $12,600,000 | 2023, 2024 | 0801-35 |
85 | Hwy 13 | Resurface from Waseca to Waterville | $5,700,000 | 2031 | 8102-30 |
85 | Hwy 22 | Medium mill and overlay from Sunrise Dr in St. Peter to Nicollet County Road 20 | $5,300,000 | Not Selected | Will be completed with remainder of the Hwy 22 to US 169 in St. Peter |
85 | Hwy 22 | Reconstruction from Hungry Hollow Rd to Maple Hill Rd | $1,500,000 | Not Selected | NA |
84 | Hwy 19 | Resurface from Hwy 169 to east Jct of Hwy 13 | $12,900,000 | 2031 | 4004-126 |
83 | Hwy 86 | Resurface Hwy 86 from I-90 to Hwy 60 (Except Lakefield); replace or improve drainage; replace signs | $4,600,000 | 2032 | 3208-1101745 |
83 | US Hwy 75 | Resurface from Iowa border to Luverne | $5,000,000 | 2030 | 6704-116 |
82 | Hwy 19 | Medium mill and overlay from Red Wing Ave to Leroy Ave | $800,000 | Not Selected | NA |
82 | Hwy 68 | Reclaim and overlay from Hwy 15 south of New Ulm to US Hwy 169 | $14,800,000 | NA | NA |
81 | Hwy 13 | Resurface from Waterville to Montgomery | $15,000,000 | 2028 | 4001-48 |
81 | Hwy 19 | Medium mill and overlay from Leroy Ave S to Hwy 13 | $200,000 | Not Selected | NA |
81 | Hwy 4 | Resurface Hwy 4 from Martin Hwy 26 to Hwy 60; replace 1 bridge and repair 3 bridges | $17,800,000 | 2024, 2025 | 4602-27 |
81 | US Hwy 75 | Thick Mill and overlay from I-90 to Main St (Rock County Road 4) | $1,400,000 | Not Selected | NA |
80 | Hwy 19 | Resurface from Winthrop to Gaylord | $8,800,000 | 2028 | 7205-1070404 |
80 | Hwy 22 | Medium mill and overlay from 6th Ave NE to Blue Earth County Road 15 | $5,500,000 | Not Selected | NA |
80 | Hwy 22 | Medium mill and overlay from County Road 90 to Hungry Hollow Rd | $300,000 | Not Selected | NA |
80 | Hwy 30 | Medium mill and overlay from Cottonwood County Road 7/Railroad Corssing to US 71 | $8,400,000 | Not Selected | Completed in 2020 |
80 | Hwy 93 | Reconstruct Hwy 93 from Hwy 169 to flood wall in Henderson; repair 1 bridge | $17,900,000 | 2023 | 7212-21; Flood mitigation project included with bonding bill |
79 | Hwy 30 | Resurface Hwy 30 from US 71 to Hwy 4; replace or improve drainage, signing and lighting | $9,363,000 | 2032 | 1702-1101744 |
79 | Hwy 5 | Cold in place recycling and medium overlay from Hwy 22 to east of 4th St in Arlington | $3,700,000 | Not Selected | NA |
78 | Hwy 22 | Resurface from west Jct of CR 16 to Wells | $6,500,000 | 2029 | 2204-27 |
78 | Hwy 5 | Cold in place recycling and medium overlay from 5th St to US 212 | $3,100,000 | Not Selected | NA |
77 | Hwy 22 | Resurface from Iowa border to west Jct of CR 16 | $8,400,000 | 2031 | 2203-115 |
77 | Hwy 270 | Resurface from Hills to Hwy 75 | $3,800,000 | 2030 | 6706-1071303 |
77 | Hwy 99 | Medium mill and overlay from east side of railroad crossing east of St. Peter to Maple Avenue in Le Center | $6,300,000 | Not Selected | NA |
76 | Hwy 264 | Resurface from Round Lake to I-90 | $2,000,000 | 2031 | 5310-1071283 |
76 | Hwy 93 | Medium mill and overlay from Minnesota River Bridge to US Hwy 169 | $400,000 | Not Selected | NA |
75 | Hwy 22 | Medium mill and overlay from Maple Hill Road to Hwy 86 | $400,000 | Not Selected | NA |
74 | Hwy 13 | Medium mill and overlay from 2.2 miles north of Hwy 30 to 1.5 miles north of Waseca | $4,100,000 | Not Selected | NA |
74 | Hwy 22 | Resurface Hwy 22 from Gaylord to Hwy 212; replace bridge 72003 and rehab bridge 72004; replace or improve drainage, signing and lighting | $3,800,000 | 2032 | 7208-1101723 |
73 | Hwy 19 | Medium mill and overlay from 11th Ave SW to New Prague western City Limits | $200,000 | Not Selected | NA |
72 | Hwy 257 | Resurface from Hanska to Hwy 15 | $2,000,000 | 2029 | 0808-1038067 |
72 | Hwy 83 | Reclaim and overlay from Blue Earth County Road 173 to Blue Earth County Road 41 | $7,200,000 | Not Selected | NA |
71 | Hwy 109 | Hwy 109 from east side of Winnebago to western Wells limits | $7,300,000 | Not Selected | NA |
71 | Hwy 22 | Reconstruct from Hwy 83 to Bassett Dr | $13,000,000 | 2030 | 0704-1069603 |
71 | Hwy 22 | Unbonded overlay from north of Blue Earth County Road 15 to north junction of Blue Earth County Road 90 | $3,400,000 | Not Selected | NA |
71 | Hwy 30 | Resurface from Hwy 15 to Hwy 169 | $6,000,000 | 2030 | 0705-26 |
71 | Hwy 68 | Medium mill and overlay from County Road 4 in Morgan to Hwy 4 in Sleepy Eye | $4,000,000 | Not Selected | NA |
70 | Hwy 13 | Medium mill and overlay from Hwy 30 to 2.2 miles north of Hwy 30 | $1,200,000 | Not Selected | NA |
70 | Hwy 22 | Medium mill and overlay from .3 miles north of Blue Earth County Road 90 to .6 miles north of Blue Earth County Road 90 | $300,000 | Not Selected | NA |
70 | Hwy 22 | Medium mill and overlay from .33 south of Hwy 83 to 200ft north of Hwy 83 | $400,000 | Not Selected | NA |
70 | Hwy 83 | Thick mill and overlay from 1000ft east of Blue Earth County Road 41 to 1000ft west of Blue Earth County Road 41 | $300,000 | Not Selected | NA |
69 | Hwy 19 | Resurface from Gaylord to Hwy 169 | $19,200,000 | 2028 | 7206-117 |
68 | Hwy 30 | Medium mill and overlay from 1 mile east of US Hwy 169 to Troendle St NW | $5,200,000 | Not Selected | NA |
68 | Hwy 4 | Medium mill and overlay from Iowa/Minnesota Border to County Road 26 (where Hwy 4 turns right) | $5,200,000 | Not Selected | NA |
68 | Hwy 4 | Medium mill and overlay from Hwy 68 to Hwy 19 in Fairfax | $4,300,000 | Not Selected | NA |
68 | Hwy 83 | Medium mill and overlay from Hwy 30 to Blue Earth County Road 173 | $6,900,000 | Not Selected | NA |
67 | Hwy 19 | Medium mill and overlay from Alton Ave to Red Wing Ave | $200,000 | Not Selected | NA |
65 | Hwy 22 | Medium mill and overlay from 1500 south of the west junction US Hwy 212 to US Hwy 212 | $200,000 | Not Selected | NA |
64 | Hwy 99 | Medium mill and overlay from Hwy 13 to Hwy 21 | $4,100,000 | Not Selected | NA |
63 | Hwy 22 | Resurface Hwy 22 from St Peter to Hwy 111 | $5,500,000 | 2026 | 5205-113 |
63 | Hwy 91 | Reclaim and overlay from Iowa/Minnesota Border to Adrian City Limits | $9,400,000 | Not Selected | NA |
61 | Hwy 109 | Medium mill and overlay from Hwy 22 to I-90 | $5,200,000 | Not Selected | NA |
61 | US59 | Medium mill and overlay from the Iowa/Minnesota Border go Hwy 60 | $2,200,000 | Not Selected | NA |
60 | Hwy 5 | Medium mill and overlay from Sibley County Road 15 to 5th St | $300,000 | Not Selected | NA |
60 | Hwy 83 | Reclaim and overlay from Blue Earth County Road 41 to Ichabod Lane | $300,000 | Not Selected | NA |
54 | Hwy 4 | Reclaim and overlay from 3rd Ave SW in Sleepy Eye to Hwy 69 | $2,000,000 | Not Selected | NA |
53 | Hwy 19 | Minor CPR and diamond grinding from Hwy 4 to Hwy 15 | $5,000,000 | Not Selected | NA |
46 | Hwy 21 | Resurface from Hwy 99 to Hwy 13 | $4,251,047 | 2023 | 6605-38 |
43 | Hwy 13 | Thin mill and overlay from Waseca County Road 103 to 5th St in Waseca | $500,000 | Not Selected | NA |
43 | Hwy 62 | Medium mill and overlay from US/59 Fulda City limits to Plum Ave in Windom | $12,300,000 | Not Selected | NA |
41 | Hwy 111 | Thin mill and overlay from US 14 to Seventh Street in Nicollet | $200,000 | Not Selected | NA |
41 | Hwy 5 | Medium mill and overlay from 4th Ave E to Blue Earth County Road 15 | $2,900,000 | Not Selected | NA |
40 | Hwy 13 | Medium mill and overlay from 1.5 miles south of Waseca to .728 miles north of Waseca County Road 103 | $500,000 | Not Selected | NA |
40 | Hwy 83 | Thin mill and overlay from Ichabod Lane to Hwy 22/Victory Dr | $100,000 | Not Selected | NA |
23 | Hwy 91 | Medium mill and overlay from I-90 to Murray County line | $3,900,000 | Not Selected | NA |
20 | Hwy 30 | Cold in place recycling from Hwy 83 to western New Richland city limits | $4,900,000 | Not Selected | NA |
19 | Hwy 22 | Reclaim and overlay from Hwy 111 to Sibley County Road 67 | $7,400,000 | Not Selected | NA |
18 | Hwy 13 | Minor CPR and diamond grinding from .2 miles south of Hwy 60 to .26 miles north of Hwy 60 | $200,000 | Not Selected | NA |
18 | Hwy 19 | Thin mill and overlay from Le Sueur County Road 143 to 11th Ave SW | $200,000 | Not Selected | NA |
17 | Hwy 30 | Cold in place recycling from Hwy 22 to Hwy 83 | $5,500,000 | Not Selected | NA |
16 | Hwy 4 | Minot CPR and diamond grinding from Hwy 60 to Wantonwan County Road 12 | $200,000 | Not Selected | NA |
11 | Hwy 30 | Thin mill and overlay from Troendle St to Mapleton city limits | $400,000 | Not Selected | NA |
6 | Hwy 30 | Thin mill and overlay from US Hwy 169 to east side of Amboy | $400,000 | Not Selected | NA |
View more detailed scores (Excel).
Score | Route | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
90 | Hwy 13 | Thick overlay from northern Montgomery City limits to Hwy 19 in New Prague | $5,300,000 | 2030 | NA |
88 | US Hwy 75 | Cold in place recycling and medium overlay from Veterans Dr to Hwy 268/Trosky | $5,600,000 | 2028 | 6705-47 |
88 | Hwy 99 | Medium mill and overlay from Le Sueur County Road 11 to Hwy 13 | $2,900,000 | 2029 | NA |
87 | Hwy 15 | Cold in place recycling and medium overlay from the Iowa/Minnesota Border to Johnson St | $4,700,000 | 2031 | 4603-52 |
85 | Hwy 13 | Medium mill and overlay from Waseca County Road 30 to Hwy 60 | $4,400,000 | 2031 | 8102-30 |
85 | Hwy 22 | Medium mill and overlay from Sunrise Dr in St. Peter to Nicollet County Road 20 | $5,300,000 | Not Selected | Will be completed with remainder of the Hwy 22 to US 169 in St. Peter |
85 | Hwy 22 | Reconstruction from Hungry Hollow Rd to Maple Hill Rd | $1,500,000 | Not Selected | NA |
84 | Hwy 19 | Reclaim and overlay from US Hwy 169 to Le Sueur County Road 143 | $8,200,000 | 2029 | NA |
83 | Hwy 13 | Reconstruction from Hwy 21 to Montgomery City Limits | $6,800,000 | 2023 | 4002-49 |
83 | US Hwy 75 | Cold in place recycling from Iowa/Minnesota Border to 101st St | $4,400,000 | 2030 | 6704-116 |
82 | Hwy 13 | Cold in place recycling from Hwy 99 to Hwy 21/Montgomery City Limits | $1,500,000 | 2028 | 4001-48 |
82 | Hwy 19 | Medium mill and overlay from Red Wing Ave to Leroy Ave | $800,000 | 2029 | NA |
82 | Hwy 68 | Reclaim and overlay from Hwy 15 south of New Ulm to US Hwy 169 | $14,800,000 | 2029 | NA |
81 | Hwy 4 | Cold in place recycling and medium overlay from County Road 26 to Hwy 60 | $8,200,000 | 2022 | 4602-27 |
81 | Hwy 13 | Cold in place recycling and medium overlay from Hwy 60 to Hwy 99 | $5,500,000 | 2028 | 4001-48 |
81 | Hwy 19 | Medium mill and overlay from Leroy Ave S to Hwy 13 | $200,000 | 2029 | NA |
81 | US Hwy 75 | Thick Mill and overlay from I-90 to Main St (Rock County Road 4) | $1,400,000 | Not Selected | NA |
80 | Hwy 19 | Cold in place recycling and medium overlay from Hwy 15 near Winthrop to western Gaylord City limits | $3,500,000 | 2028 | NA |
80 | Hwy 30 | Medium mill and overlay from Cottonwood County Road 7/Railroad Corssing to US 71 | $8,400,000 | Not Selected | Completed in 2020 |
80 | Hwy 22 | Medium mill and overlay from North Ave to US Hwy 212 | $6,300,000 | Not Selected | NA |
80 | Hwy 22 | Medium mill and overlay from County Road 90 to Hungry Hollow Rd | $300,000 | Not Selected | NA |
80 | Hwy 22 | Medium mill and overlay from 6th Ave NE to Blue Earth County Road 15 | $5,500,000 | Not Selected | NA |
79 | Hwy 5 | Cold in place recycling and medium overlay from Hwy 22 to east of 4th St in Arlington | $3,700,000 | Not Selected | NA |
79 | Hwy 30 | Medium mill and overlay from US Hwy 71 to Darfur | $7,200,000 | Not Selected | NA |
79 | Hwy 30 | Thick mill and overlay from Darfur to Hwy 4 | $6,800,000 | Not Selected | NA |
79 | US Hwy 75 | Reconstruction from 101st St to the north end of bridge over I-90 | $1,300,000 | 2030 | 6704-116 |
78 | Hwy 5 | Cold in place recycling and medium overlay from 5th St to US 212 | $3,100,000 | Not Selected | NA |
78 | Hwy 22 | Medium mill and overlay from County Road 16 (where Hwy 22 turns right) to 10th St SW in Wells | $2,700,000 | 2028 | 2204-27 |
77 | Hwy 22 | Cold in place recycling and medium overlay from 10th St in Wells to 6th Ave NE | $6,400,000 | 2023 | 2205-13 |
77 | Hwy 22 | Medium mill and overlay from Iowa/Minnesota Border to Faribault County Road 16 | $5,600,000 | 2031 | 2203-115 |
77 | Hwy 99 | Medium mill and overlay from east side of railroad crossing east of St. Peter to Maple Avenue in Le Center | $6,300,000 | Not Selected | NA |
77 | Hwy 270 | Reclaim and overlay from Railroad overpass to US Hwy 75 | $5,600,000 | 2030 | NA |
76 | Hwy 93 | Medium mill and overlay from Minnesota River Bridge to US Hwy 169 | $400,000 | Not Selected | NA |
76 | Hwy 264 | Reclaim and overlay from Nobles County Road 21 in Round Lake to I-90 | $5,600,000 | 2031 | NA |
75 | Hwy 22 | Medium mill and overlay from Maple Hill Road to Hwy 86 | $400,000 | Not Selected | NA |
75 | Hwy 93 | Medium mill and overlay from US Hwy 169 to Hwy 19 in Henderson | $1,500,000 | 2023 | 7212-21; Flood mitigation project included with bonding bill |
74 | Hwy 13 | Medium mill and overlay from 2.2 miles north of Hwy 30 to 1.5 miles north of Waseca | $4,100,000 | Not Selected | NA |
73 | Hwy 19 | Medium mill and overlay from 11th Ave SW to New Prague western City Limits | $200,000 | 2029 | NA |
72 | Hwy 4 | Reclaim and overlay from Wantonwan County Road 12 (where Hwy 4 turns left in Saint James) to south side of Sleepy Eye | $13,600,000 | 2023 | 0801-35 |
72 | Hwy 83 | Reclaim and overlay from Blue Earth County Road 173 to Blue Earth County Road 41 | $7,200,000 | Not Selected | NA |
72 | Hwy 257 | Reclaim and overlay from Hanska to Hwy 15 | $2,800,000 | 2029 | NA |
71 | Hwy 4 | Major CPR and diamond grinding from .4 miles south of Hwy 60 to western junction Hwy 60 | $300,000 | 2022 | 4602-27 |
71 | Hwy 30 | Medium mill and overlay from County Road 24 to west end of bridge 07038 | $4,200,000 | 2030 | NA |
71 | Hwy 22 | Reconstruction from Hwy 83 to Bassett Dr in Mankato | $12,400,000 | 2030 | NA |
71 | Hwy 22 | Unbonded overlay from north of Blue Earth County Road 15 to north junction of Blue Earth County Road 90 | $3,400,000 | Not Selected | NA |
71 | Hwy 68 | Medium mill and overlay from County Road 4 in Morgan to Hwy 4 in Sleepy Eye | $4,000,000 | Not Selected | NA |
71 | Hwy 109 | Hwy 109 from east side of Winnebago to western Wells limits | $7,300,000 | Not Selected | NA |
70 | Hwy 13 | Medium mill and overlay from Hwy 30 to 2.2 miles north of Hwy 30 | $1,200,000 | Not Selected | NA |
70 | Hwy 22 | Medium mill and overlay from .33 south of Hwy 83 to 200ft north of Hwy 83 | $400,000 | Not Selected | NA |
70 | Hwy 22 | Medium mill and overlay from .3 miles north of Blue Earth County Road 90 to .6 miles north of Blue Earth County Road 90 | $300,000 | Not Selected | NA |
70 | Hwy 83 | Thick mill and overlay from 1000ft east of Blue Earth County Road 41 to 1000ft west of Blue Earth County Road 41 | $300,000 | Not Selected | NA |
69 | Hwy 19 | Medium mill and overlay from .72 miles east of US Hwy 169 to .46 miles west of US Hwy 169 | $600,000 | 2026 | 7206-117 |
69 | Hwy 19 | Reclaim and overlay from Hwy 5 to Henderson western city limits. | $9,300,000 | 2026 | 7206-117 |
68 | Hwy 4 | Medium mill and overlay from Hwy 68 to Hwy 19 in Fairfax | $4,300,000 | Not Selected | NA |
68 | Hwy 4 | Medium mill and overlay from Iowa/Minnesota Border to County Road 26 (where Hwy 4 turns right) | $5,200,000 | Not Selected | NA |
68 | Hwy 30 | Medium mill and overlay from 1 mile east of US Hwy 169 to Troendle St NW | $5,200,000 | Not Selected | NA |
68 | Hwy 83 | Medium mill and overlay from Hwy 30 to Blue Earth County Road 173 | $6,900,000 | Not Selected | NA |
67 | Hwy 19 | Medium mill and overlay from Alton Ave to Red Wing Ave | $200,000 | Not Selected | NA |
65 | Hwy 19 | Thick mill and overlay from Henderson Station Road to US Hwy 169 | $1,000,000 | 2026 | 7206-117 |
65 | Hwy 22 | Medium mill and overlay from 1500 south of the west junction US Hwy 212 to US Hwy 212 | $200,000 | Not Selected | NA |
64 | Hwy 30 | Cold in place recycling from West end of bridge 07038 to US Hwy 169 | $700,000 | 2030 | NA |
64 | Hwy 99 | Medium mill and overlay from Hwy 13 to Hwy 21 | $4,100,000 | Not Selected | NA |
63 | Hwy 30 | Cold in place recycling from Hwy 15 to Wantonwan County Road 24 | $1,500,000 | 2030 | NA |
63 | Hwy 22 | Medium mill and overlay from Nicollet County Road 20 to Hwy 111 | $1,300,000 | 2025 | 5205-113 |
63 | Hwy 91 | Reclaim and overlay from Iowa/Minnesota Border to Adrian City Limits | $9,400,000 | Not Selected | NA |
63 | Hwy 109 | Medium mill and overlay from Wells City limits to Hwy 22 | $400,000 | 2026 | 2204-26; Can be found as an urban project, but pairing with Hwy 22 work in Wells. |
61 | US59 | Medium mill and overlay from the Iowa/Minnesota Border go Hwy 60 | $2,200,000 | Not Selected | NA |
61 | Hwy 109 | Medium mill and overlay from Hwy 22 to I-90 | $5,200,000 | Not Selected | NA |
60 | Hwy 5 | Medium mill and overlay from Sibley County Road 15 to 5th St | $300,000 | Not Selected | NA |
60 | Hwy 83 | Reclaim and overlay from Blue Earth County Road 41 to Ichabod Lane | $300,000 | Not Selected | NA |
59 | Hwy 19 | Medium mill and overlay from Sibley/Le Sueur County line to east end of bridge 40001 near Henderson | $300,000 | 2026 | 7206-117; addressing with adjacent pavements |
54 | Hwy 4 | Reclaim and overlay from 3rd Ave SW in Sleepy Eye to Hwy 69 | $2,000,000 | Not Selected | NA |
53 | Hwy 19 | Minor CPR and diamond grinding from Hwy 4 to Hwy 15 | $5,000,000 | Not Selected | NA |
53 | Hwy 86 | Thin mill and overlay from bridge 32084 to Hwy 60 | $4,500,000 | Not Selected | NA |
48 | Hwy 15 | Thic overlay and drainage work from Johnson St to Goemann Rd | $4,800,000 | Not Selected | Completed in 2017 |
46 | Hwy 21 | Medium mill and overlay from Hwy 99 to Hwy 13 | $4,100,000 | 2027 | 6605-38 |
43 | Hwy 13 | Thin mill and overlay from Waseca County Road 103 to 5th St in Waseca | $500,000 | Not Selected | NA |
43 | Hwy 62 | Medium mill and overlay from US/59 Fulda City limits to Plum Ave in Windom | $12,300,000 | Not Selected | NA |
41 | Hwy 5 | Medium mill and overlay from 4th Ave E to Blue Earth County Road 15 | $2,900,000 | Not Selected | NA |
41 | Hwy 111 | Thin mill and overlay from US 14 to Seventh Street in Nicollet | $200,000 | Not Selected | NA |
40 | Hwy 13 | Medium mill and overlay from 1.5 miles south of Waseca to .728 miles north of Waseca County Road 103 | $500,000 | Not Selected | NA |
40 | Hwy 83 | Thin mill and overlay from Ichabod Lane to Hwy 22/Victory Dr | $100,000 | Not Selected | NA |
38 | Hwy 99 | Medium mill and overlay from Minnesota River Bridge to Railroad crossing | $200,000 | Not Selected | Completed with 2019 project |
29 | Hwy 22 | Medium mill and overlay from east junction Faribault County Road 16 to west junction Faribault County Road 16 | $600,000 | 2031 | 2203-115; One-mile segment that will be addressed with Hwy 22 project that extends to the Iowa border. |
23 | Hwy 91 | Medium mill and overlay from I-90 to Murray County line | $3,900,000 | Not Selected | NA |
20 | Hwy 30 | Cold in place recycling from Hwy 83 to western New Richland city limits | $4,900,000 | Not Selected | NA |
19 | Hwy 22 | Reclaim and overlay from Hwy 111 to Sibley County Road 67 | $7,400,000 | Not Selected | NA |
18 | Hwy 13 | Minor CPR and diamond grinding from .2 miles south of Hwy 60 to .26 miles north of Hwy 60 | $200,000 | Not Selected | NA |
18 | Hwy 19 | Thin mill and overlay from Le Sueur County Road 143 to 11th Ave SW | $200,000 | 2029 | NA |
17 | Hwy 30 | Cold in place recycling from Hwy 22 to Hwy 83 | $5,500,000 | Not Selected | NA |
16 | Hwy 4 | Minor CPR and diamond grinding from the south side of Sleepy Eye to Elsworth St | $300,000 | 2029 | 0802-47 |
16 | Hwy 4 | Minot CPR and diamond grinding from Hwy 60 to Wantonwan County Road 12 | $200,000 | Not Selected | NA |
11 | Hwy 30 | Thin mill and overlay from Troendle St to Mapleton city limits | $400,000 | Not Selected | NA |
10 | Hwy 19 | Thin mill and overlay from western Henderson city limits to Sibley/le Sueur County line | $200,000 | 2026 | 7206-117; Addressing with adjacent pavements. |
9 | Hwy 19 | Thin mill and overlay from east end of Railroad bridge near Henderson to Henderson Station Road | $100,000 | 2026 | 7206-117; Addressing with adjacent pavements. |
6 | Hwy 30 | Thin mill and overlay from US Hwy 169 to east side of Amboy | $400,000 | Not Selected | NA |
View more detailed scores (Excel).
Score | Route | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
87 | Hwy 4 | Reclaim and overlay from Watonwan County Road 12 to South side of Sleepy Eye | $11,300,000 | 2023 | |
81 | Hwy 4 | Medium overlay from Martin County Road 26 to south of Hwy 60 | $17,800,000 | 2024 | Project originally selected prior to project selection policy. (In 2019-2022 STIP) |
74 | Hwy 4 | Reclaim and overlay from 3rd Ave NW in Sleepy Eye to Hwy 68 | $1,000,000 | Not selected | Waiting to coordinate with another project. |
72 | Hwy 4 | Medium overlay from Hwy 68 to Hwy 19 in Fairfax | $2,100,000 | Not selected | Not a district priority. Will continue to monitor pavement conditions. |
68 | Hwy 4 | Medium mill and overlay from Iowa/Minnesota Border to west of Martin County Road 26 (where Hwy 4 turns right) | $2,600,000 | Not selected | Received a new wearing course in 2019 |
61 | Hwy 4 | Major resurfacing from .4 miles south of Hwy 60 to Hwy 60 | $200,000 | 2024 | Project originally selected prior to project selection policy. (In 2019-2022 STIP) |
41 | Hwy 4 | Minor resurfacing from south side of Sleepy Eye to Ellsworth St in Sleepy Eye | $100,000 | 2027 | Tying to other concrete work on Hwy 4 in Sleepy Eye |
16 | Hwy 4 | Resurfacing from bridge over Hwy 60 to 10th ave S | $100,000 | Not selected |
View more detailed scores (Excel).
Score | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
92 | Hwy 19 | Medium overlay from Highway 15 to the west city limits of Gaylord | $7,800,000 | Not selected | District is focusing on pavements previously selected and those currently in worse condition |
90 | Hwy 22 | Medium overlay from 10th Street SW to 6th Avenue NE | $14,000,000 | 2023 | NA |
88 | Hwy 22 | Reclaim and overlay from Highway 111 to north of Sibley County Road 67 | $5,200,000 | 2020 | NA |
88 | Hwy 91 | Medium overlay from the northern city limits of Adrian to the Nobles/Murray county line | $5,100,000 | 2020 | NA |
88 | Hwy 111 | Reclaim and overlay from Highway 99 to Highway 22 | $4,900,000 | 2020 | NA |
87 | Hwy 5 | Medium overlay from 5th Street on north side of Green Isle to Highway 212 | $2,300,000 | 2021 | NA |
87 | US75 | Medium overlay from Veteran's Drive in Luverne to Highway 268/Trosky (D7/D8) | $6,400,000 | 2025 | NA |
86 | US75 | Medium mill and overlay from north end of the bridge over I-90 and the I-90 ramp | $500,000 | 2025 | NA |
86 | Hwy 22 | Medium overlay from north of Highway 83 to Bassett Drive in Mankato | $1,300,000 | Not selected | Removed from CHIP to include with a future larger Highway 22 project. |
85 | Hwy 99 | Medium mill and overlay from Birch Street to Highway 169 | $4,300,000 | 2021 | NA |
85 | Hwy 15 | Medium overlay from the Iowa/Minnesota State line to Johnson Street in Fairmont | $4,500,000 | 2028 | NA |
85 | Hwy 83 | Reclaim and overlay from north of Blue Earth County Road 173 to east of Blue Earth County Road 41 (near Mankato) | $7,200,000 | Not selected | Corridor needs more evaluation |
84 | Hwy 99 | Medium overlay from Le Center to west of Highway 13 | $2,800,000 | 2027 | NA |
84 | Hwy 22 | Reconstruction from north of the Blue Earth County Road 90 to 0.5 miles north of Blue Earth County Road 90 | $700,000 | Not selected | Smaller segment. Should be included in a future larger Highway 22 project |
83 | US75 | Medium overlay from the Iowa/Hwy state line to north of 101st Street | $4,600,000 | 2028 | NA |
83 | Hwy 13 | Reclaim and overlay from north of Highway 60 to Highway 99 | $9,100,000 | 2028 | NA |
83 | Hwy 270 | Reclaim and overlay from the railroad overpass at Hills to Highway 75 | $5,800,000 | Not selected | Potential turnback, coordination with local partners will be needed |
82 | Hwy 4 | Medium overlay from Watonwan County Road 26 to Highway 60 | $21,000,000 | 2022 | NA |
82 | Hwy 4 | Reclaim and overlay from Watonwan County Road 12 to south side of Sleepy Eye | $15,000,000 | 2023 | NA |
82 | Hwy 13 | Medium mill and overlay from Waseca County Road 30 to South of Highway 60 | $3,900,000 | 2026 | NA |
82 | Hwy 13 | Medium overlay from Highway 99 to Highway 21/south of Montgomery city limits | $1,600,000 | 2028 | Part of Waterville to Montgomery Project |
82 | Hwy 5 | Reclaim and overlay from Division Street in Gaylord to Sibley County Road 17 | $4,100,000 | Not selected | Not a current district priority, but will continue to monitor for pavement performance |
82 | Hwy 13 | Medium overlay from 5th Street SE to Waseca County Road 13 | $600,000 | Not selected | Waiting to coordinate with another project. |
81 | Hwy 13 | Medium mill and overlay from Highway 21 to southern Montgomery city limits | $800,000 | 2028 | NA |
81 | Hwy 19 | Medium mill and overlay from the New Prague to east of Alton Avenue | $500,000 | 2029 | NA |
81 | Hwy 19 | Medium mill and overlay from east of Red Wing Avenue to east of LeRoy Avenue South | $900,000 | 2029 | NA |
81 | Hwy 264 | Reclaim and overlay from Round Lake to north ramps at I-90 | $5,600,000 | Not selected | Potential turnback, coordination with local partners will be needed |
80 | Hwy 253 | Reclaim and overlay from Faribault County Road 2 to I-90 | $3,500,000 | 2020 | NA |
80 | Hwy 254 | Reclaim and overlay from 1st Street to I-90 | $2,600,000 | 2020 | NA |
80 | Hwy 19 | Repair Concrete from Highway 4 to Highway 15 | $21,000,000 | Not selected | Continue to monitor for pavement performance |
80 | Hwy 68 | Reclaim and overlay from Highway 15 south of New Ulm to Highway 169 | $16,000,000 | 2029 | NA |
80 | Hwy 93 | Medium overlay from Bridge 72007 (near Le Sueur) to Highway 169 | $400,000 | Not selected | Waiting to coordinate with another project. |
79 | Hwy 22 | Medium mill and overlay from north of Sibley County Road 67 to Gaylord city limits | $200,000 | 2020 | NA |
79 | Hwy 22 | Medium mill and overlay from south of Highway 83 to north of Highway 83 | $400,000 | Not selected | Smaller segment. Should be included in a future larger Highway 22 project |
79 | Hwy 22 | Medium mill and overlay from north of Blue Earth County Road 90 to north of Hungry Hollow Road | $400,000 | Not selected | Should be included in a future larger Highway 22 project |
79 | Hwy 22 | Medium mill and overlay from north of Hungry Hollow Road to north of Maple Hill Road | $200,000 | Not selected | Should be included in a future larger Highway 22 project |
78 | Hwy 4 | Medium mill and overlay from the Iowa/Minnesota state line to Martin County Road 26 | $3,700,000 | 2020 | NA |
78 | Hwy 30 | Medium overlay from Highway 22 to Highway 83 | $3,800,000 | 2020 | NA |
78 | Hwy 99 | Medium overlay from Highway 13 to Highway 21 | $2,800,000 | 2020 | NA |
78 | Hwy 30 | Medium mill and overlay from Cottonwood County Road 7 to Highway 71 | $6,200,000 | 2021 | NA |
78 | Hwy 13 | Thick overlay from Montgomery city limits to New Prague | $5,500,000 | Not selected | Waiting to coordinate with another project. |
78 | Hwy 30 | Medium mill and overlay from East of Highway 169 (Amboy eastern city limits) to east of Troendle Street SW | $5,200,000 | Not selected | Not a current district priority, but will continue to monitor for pavement performance |
78 | Hwy 109 | Medium mill and overlay from Winnebago to east of 560th Avenue (west of Wells) | $11,000,000 | Not selected | Not a current district priority, but will continue to monitor for pavement performance |
77 | Hwy 93 | Medium mill and overlay from Highway 169 to the southern city limits of Henderson | $1,600,000 | 2022 | NA |
77 | Hwy 22 | Medium mill and overlay from the Iowa/Minnesota state line to Faribault County Road 16 | $10,000,000 | 2027 | |
77 | Hwy 257 | Reclaim and overlay from southern city limits of Hanska to Highway 15 | $2,900,000 | 2028 | NA |
77 | Hwy 19 | Medium mill and overlay from east of Highway 169 to east of Le Sueur County Road 143 | $6,100,000 | 2029 | |
77 | Hwy 19 | Medium mill and overlay from west of 11th Avenue SW to the New Prague | $200,000 | 2029 | |
76 | Hwy 22 | Reclaim and overlay from Faribault County Road 16 (where Highway 22 turns North) to 10th Street SW in Wells | $3,800,000 | 2025 | |
76 | Hwy 83 | Medium mill and overlay from west of Ichabod Lane to Highway 22/Victory Drive | $200,000 | Not selected | NA |
76 | Hwy 99 | Medium mill and overlay from the railroad crossing on the East side of St. Peter to the Western city limits of Le Center | $12,000,000 | Not selected | NA |
75 | Hwy 13 | Medium mill and overlay from Hwy 30 to 1.5 miles South of Waseca | $3,900,000 | Not selected | NA |
74 | Hwy 4 | Medium mill and overlay from Highway 68 to Highway 19 | $6,600,000 | Not selected | NA |
74 | Hwy 60 | Major concrete rehabilitation from Highway 13 to east of TH13 | $200,000 | Not selected | NA |
73 | Hwy 91 | Medium mill and overlay from the southern city limits of Adrian to 8th Street in Adrian | $300,000 | 2020 | Selected prior to policy (in 2019-2022 STIP) |
73 | Hwy 19 | Medium mill and overlay from west of Highway 169 to west of Highway 169 | $700,000 | 2029 | Small segment with bridge work that will be included with a project on Highways 13/19/169 |
73 | Hwy 4 | Medium overlay from 3rd Avenue NW in Sleepy Eye to North side of Highway 68 intersection | $1,300,000 | Not selected | NA |
73 | Hwy 13 | Medium overlay from Highway 30 in New Richland to 2.2 miles North of Highway 30 | $1,100,000 | Not selected | NA |
72 | Hwy 91 | Reclaim and overlay from southern Ellsworth city limits to North Avenue in Ellsworth | $1,300,000 | Not selected | NA |
71 | Hwy 30 | Thin overlay Blue Earth County Road 24 to west end of Bridge 07038 | $4,600,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
71 | Hwy 19 | Medium mill and overlay from east of Le Sueur County Road 143 to west of 11th Avenue SW | $300,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
71 | Hwy 22 | Medium mill and overlay from Linden Avenue to North Avenue in Gaylord | $400,000 | Not selected | NA |
71 | Hwy 86 | Reclaim and overlay I-90 to Highway 60 | $19,000,000 | Not selected | NA |
70 | Hwy 263 | Reclaim and overlay from Ceylon to I-90 | $6,200,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
70 | Hwy 22 | Medium mill and overlay north Sunrise Drive in St. Peter to south of Nicollet Count Road 20 | $300,000 | 2024 | Small segment that will be included in larger Highway 22 project |
70 | Hwy 19 | Medium mill and overlay from railroad bridge east of Henderson to east of Henderson Station Road | $200,000 | 2025 | Segment part of larger Highway 19 project |
70 | Hwy 30 | Medium overlay from the Highway 169/Amboy city limit to east of the South Junction of Highway 169 | $900,000 | Not selected | NA |
70 | Hwy 19 | Medium mill and overlay from East of Alton Avenue to Red Wing Avenue | $200,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP), previously selected because of bridge and highway work to the west |
70 | Hwy 83 | Medium mill and overlay from east of Blue Earth County Road 41 (near Mankato) to west of Blue Earth County Road 41 | $200,000 | Not selected | NA |
70 | Hwy 91 | Reclaim and overlay from Iowa/Minnesota state line to Ellsworth | $800,000 | Not selected | NA |
69 | Hwy 30 | Medium mill and overlay from Highway 83 to western city limits of New Richland | $3,400,000 | 2020 | Selected prior to policy (in 2019-2022 STIP) |
69 | Hwy 22 | Medium mill and overlay from Maple Hill Road to south of the Junction of Highway 83 | $400,000 | 2029 | Smaller segment. Will likely be included in larger Highway 22 project |
68 | Hwy 60 | Reclaim and overlay Highway 14 to Waterville | $18,500,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
68 | US59 | Medium mill and overlay from Iowa/Minnesota state line to the South Junction of Highway 60 | $2,300,000 | Not selected | NA |
68 | Hwy 62 | Medium mill and overlay from East Fulda city limits to Plum Avenue in Windom | $12,000,000 | Not selected | NA |
67 | Hwy 30 | Medium mill and overlay from east of Troendle Street SW in Mapleton to western city limits of Mapleton | $500,000 | Not selected | NA |
67 | Hwy 60 | Major concrete rehabilitation from east of 3rd Street in Waterville to Highway 13 | $300,000 | Not selected | NA |
66 | Hwy 83 | Medium mill and overly from Highway 30 to Blue Earth County Road 173 | $6,900,000 | Not selected | NA |
65 | Hwy 19 | Medium mill and overlay from Henderson to the Sibley/Le Sueur county line | $600,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Hwy 19 | Medium mill and overlay from east of LeRoy Avenue South to Highway 13 | $200,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Hwy 4 | Major Concrete rehabilitation/diamond grinding from Willow Street NW to 3rd Avenue NW | $800,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Hwy 30 | Reclaim and overlay from Highway 71 to Highway 4 | $26,000,000 | Not selected | NA |
65 | Hwy 5 | Medium mill and overlay from Sibley County Road 15 to South of 5th Street | $300,000 | Not selected | NA |
65 | Hwy 13 | Medium mill and overlay from Waseca County Road 103 to 5th Street SE in Waseca | $800,000 | Not selected | NA |
64 | Hwy 91 | Reclaim and overlay from North Avenue in Ellsworth to NE of Chaney Avenue | $3,500,000 | Not selected | NA |
63 | Hwy 4 | Thick overlay from Highway 60 near St. James to the west junction of Highway 60 | $300,000 | 2022 | Selected prior to policy (in 2019-2022 STIP) |
63 | Hwy 22 | Medium mill an overlay from Fairbault County Road 6 to the West Junction of Faribault County Road 16 | $400,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP), Coordinating with another MnDOT project |
63 | Hwy 30 | Thin overlay from west end of Bridge 07038 to the Highway 169 | $800,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
62 | Hwy 4 | Major Concrete rehabilitation/diamond grinding from the bridge over Highway 60 to Watonwan County Road 12 | $400,000 | Not selected | NA |
61 | Hwy 13 | Medium overlay Waseca City limits to Waseca County Road 103 (South of Waseca) | $400,000 | Not selected | NA |
61 | Hwy 91 | Reclaim and overlay from Dayton Avenue to the southern city limits of Adrian | $2,500,000 | Not selected | NA |
59 | Hwy 99 | Medium mill and overlay city limits of Nicollet to Heideman Avenue in Nicollet | $500,000 | Not selected | NA |
58 | Hwy 60 | Reclaim and overlay from Highway 14 to north of Highway 14 | $200,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
58 | Hwy 91 | Reclaim and overlay from NE of Chaney Avenue to Dayton Avenue | $1,500,000 | Not selected | |
54 | Hwy 30 | Medium mill and overlay from Murray/Cottonwood County line to Cottonwood County Road 7 | $400,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
54 | Hwy 22 | Medium mill and overlay from south of the West Junction of Highway 212 to Highway 212 | $200,000 | Not selected | |
53 | Hwy 30 | Thin overlay from Highway 15 to Blue Earth County Road 24 | $1,600,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
50 | Hwy 19 | Medium mill and overlay from Highway 5 to Henderson | $6,600,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
46 | US75 | Thick mill and overlay from James Street to Veteran's Drive | $1,300,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
45 | Hwy 21 | Medium mill and overlay from Highway 99 to Highway 13 (South of Montgomery) | $4,400,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP) |
43 | Hwy 22 | Medium mill and overlay from south of Nicollet County Road 20 to Highway 111 | $5,300,000 | 2024 | Selected prior to policy (in 2019-2028 CHIP) |
43 | US75 | Medium overlay from north of 101st Street to the north end of the Bridge over I-90 | $200,000 | 2028 | Selected prior to policy (in 2019-2028 CHIP) |
43 | Hwy 68 | Reclaim and overlay from Morgan to the North Junction of Highway 4 | $9,000,000 | Not selected | NA |
42 | Hwy 4 | Minor concrete rehabilitation from Sleepy Eye to Elsworth Street in Sleepy Eye | $200,000 | 2023 | Selected prior to policy (in 2019-2028 CHIP) |
41 | Hwy 19 | Medium mill and overlay from East of Henderson Station Road to west of Highway 169 | $800,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
39 | Hwy 22 | Medium overlay from North Avenue to south of Highway 212 | $11,500,000 | Not selected | NA |
39 | Hwy 86 | Reclaim and overlay from Iowa/Minnesota state line to Bridge 32084 (ramps North of I90) | $7,400,000 | Not selected | NA |
35 | Hwy 83 | Medium overlay from west of Blue Earth County Road 41 (near Mankato) to west of Ichabod Lane | $200,000 | Not selected | |
34 | Hwy 91 | Reclaim and overlay from 0.3 miles north of North Avenue in Ellsworth to 1 mile north of North Avenue | $700,000 | Not selected | NA |
31 | Hwy 109 | Medium overlay from east of 560th Avenue (west of Wells) to the western city limits of Wells | $400,000 | Not selected | |
30 | Hwy 19 | Medium mill and overlay from the Sibley/Le Sueur county line to railroad bridge east of Henderson | $400,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
25 | Hwy 5 | Medium mill and overlay from 4th Avenue East to Sibley County Road 15 | $2,900,000 | Not selected | NA |
23 | Hwy 22 | Reconstruction from Blue Earth County Road 15 to County Road 90 | $11,500,000 | Not selected | NA |
16 | Hwy 13 | Minor concrete rehabilitation from 0.2 miles south of Highway 60 to 0.2 miles north of Highway 60 | $100,000 | Not selected |